ML19207C514
| ML19207C514 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 07/17/1979 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Eric Turner HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML19207C515 | List: |
| References | |
| NUDOCS 7909120161 | |
| Download: ML19207C514 (2) | |
See also: IR 05000498/1979011
Text
/[L
>
-
.
pa atog
o
UNITED STATES
$ gh, . . b
8h.
NUCLEAR REGULATORY COMMISSION
E
REGION IV
8
611 RY AN PLAZA DRIVE, SUITE 1000
0, *A/
%y ' .% J [
ARLf NGTON, TEX AS 7G012
- ...
July 17, 1979
In Reply Refer To:
RIV
Docket No.
50-498/Rpt. 79-11
50-499/Rpt. 79-11
Houston Lighting and Power Company
ATTN:
Mr. E. A. Turner, Vice President
Power Plant Construction and
Technical Services
Post Office Box 1700
Houston, Texas
77001
Gentlemen:
This refers to the inspection conducted by Messers. W. G. Hubacek and
D. P. Tomlinson of our staff during the period June 26-28, 1979, of activities
authorized by NRC Construction Permits No. CPPR-128 and 129 of South Texas
P roj ec t , Units No. 1 and 2, and to the discussion of our findings with
Mr. T. D. Stanley and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspectors.
Within the scope of the inspection, no items of noncompliance were identified.
Two new unresolved items are identified in paragraph 2 of the enclosed
report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a corv of this letter and the
enclosed inspection report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be proprietary, it
is necessary that you submit a written application to this of fice, within 20
days of the date of this letter, requesting that such information be withheld
from public disclosure.
The application must include a full statement of the
reasons why it is claimed that the information is proprietary. The application
should be prepared so that any proprietary information identified is contained
in an enclosure to the application, since the application without the enclosure
will also be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
-
J!b
't 9 09120 /6/
.
.
Ilouston Lighting and Power
-2-
July 17, 1979
Co:apany
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely
/
1. C. Seidle, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Report No. 50-498/79-11
50-499/79-11
g/4