Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18152B154 + (ML18152B154)
- 05000280/LER-1988-012-01, :on 880418,Tech Spec 1.0.H.5 Violated.Caused by Discovery of Valve 1-RS-11 Held in Open Position by Counter Weight Due to Personnel Error.Valves Inspected & Verified to Be in Closed Position & 1-RS-11 Disassembled + (ML18152B156)
- 05000281/LER-1988-011-02, :on 880423,control Room/Relay Room Chiller Removed from Svc After Second Chiller Removed from Svc. Caused by Fouled Chiller Refrigerant filter-dryer Elements. Filter-dryer Elements Replaced + (ML18152B157)
- ML18152B158 + (ML18152B158)
- ML18152B159 + (ML18152B159)
- PNO-II-88-035, on 880524,small Hydrogen Fire Occurred in Containment.Caused by Hydrogen Gas Leaking from Pressure Relief Tank (Prt),Past Valve 2-RC-144 & Out Pipe Nipple & Ignited by Spark.Leakage Flowpath Capped & PRT Purged + (ML18152B160)
- PNO-II-88-034, on 880516,outage Exceeded 48 H.Caused by Time Requirements to Resolve Problems Identified Following 880516 Reactor Trip/Safety Injection Event.Unit Brought to Cold Shutdown on 880517 & Unusual Event Declared Then Terminated + (ML18152B161)
- ML18152B163 + (ML18152B163)
- ML18152B164 + (ML18152B164)
- PNO-II-88-037A, on 880606,licensee Notified Region II That Westinghouse Contract Worker Committed Suicide During Weekend of 880604-05 at Worker Home.Worker Received Quarterly Whole Body Radiation Dose of 3.3 Rem on 880527 + (ML18152B166)
- PNO-II-88-034A, on 880516,reactor Trip/Safety Injection Occurred.Caused by Small Piece of Metal Which Partially Blocking Flow Through Limiting Venturi.Defective Parts Replaced & Course Strainer Installed in Each Line + (ML18152B167)
- PNO-II-88-037, on 880527,Westinghouse Worker Received 2.527 Rem Whole Body Exposure While Cleaning Reactor Vessel Head. Licensee Technician Who Monitored Activity Relieved.Worker Not Expected to Suffer Adverse Health Effects + (ML18152B168)
- ML18152B169 + (ML18152B169)
- ML18152B171 + (ML18152B171)
- ML18152B172 + (ML18152B172)
- ML18152B173 + (ML18152B173)
- ML18152B176 + (ML18152B176)
- 05000281/LER-1988-014-02, :on 880528,RCS PORV PCV-2455C Cycled Open & Closed,Simultaneous W/Rcs Venting & Filling.Caused by Failure to Revise RCS Venting Procedure.Operating Procedures Revised + (ML18152B177)
- ML18152B179 + (ML18152B179)
- ML18152B181 + (ML18152B181)
- PNO-II-88-051, on 880826,plant Personnel Were Moving Spent Fuel Cask Using Transporter to Remote Dry Cask Storage Area on Site & Transporter Tilted About Six Degrees.Licensee Used Steel Bed Plates to Jack Up & Support Transporter + (ML18152B185)
- PNO-II-88-052A, on 880831,augmented Insp Team Dispatched to Investigate Partial Loss of Water from Refueling Cavity. Licensee Submits Justification for Continued Operation.Nrc Plans to Meet W/Licensee to Discuss Actions + (ML18152B186)
- 05000281/LER-1988-018-02, :on 880811,steam Generator B Channel III Steam Flow Failed to High Flow Indication.Failed Multiplier/ Divider Replaced.Affected Channels Placed in Trip Mode + (ML18152B187)
- PNO-II-88-052, on 880517,partial Loss of Water in Refueling Cavity Occurred Due to Seal Failure During Refueling Outage. Review of Circumstances Planned + (ML18152B188)
- ML18152B189 + (ML18152B189)
- ML18152B190 + (ML18152B190)
- ML18152B191 + (ML18152B191)
- ML18152B192 + (ML18152B192)
- ML18152B193 + (ML18152B193)
- ML18152B194 + (ML18152B194)
- ML18152B195 + (ML18152B195)
- ML18152B197 + (ML18152B197)
- ML18152B198 + (ML18152B198)
- ML18152B200 + (ML18152B200)
- ML18152B202 + (ML18152B202)
- ML18152B203 + (ML18152B203)
- 05000280/LER-1988-025, :on 880815,control/relay Room Chillers Inoperable.Caused by Inadequate Svc Water Flow to Chiller Condensers as Result of Method to Start/Stop Chillers.Addl Procedure Will Be Developed + (ML18152B205)
- 05000280/LER-1988-029, :on 880815,reactor Trip & Safety Injection Occurred.Caused by Spurious Initiation of Train a High Consequence Limiting Safeguard.Relay Replaced & Limit Switch on Steam Dump Valve Adjusted + (ML18152B206)
- ML18152B208 + (ML18152B208)
- ML18152B209 + (ML18152B209)
- PNO-II-88-056, on 880914,Unit 1 Shut Down.Caused by Determination That Both Emergency Diesel Generators Would Be Overloaded If Loss of Offsite Power Occurred Between 5 & 60 Minutes After Loca.Condition Exists for Both Units + (ML18152B211)
- ML18152B212 + (ML18152B212)
- ML18152B213 + (ML18152B213)
- ML18152B216 + (ML18152B216)
- ML18152B217 + (ML18152B217)
- ML18152B218 + (ML18152B218)
- ML18152B219 + (ML18152B219)
- ML18152B220 + (ML18152B220)
- ML18152B223 + (ML18152B223)
- ML18152B228 + (ML18152B228)
- 05000281/LER-1988-022-01, :on 880910,reactor Trip by Turbine Trip Occurred While Attempting to Maintain Turbine at Synchronous Speed.Caused by Inadequate Procedure & Faulty Valve Position Indication.Testing to Be Performed + (ML18152B229)