ML18152B190

From kanterella
Jump to navigation Jump to search
Forwards Technical Rept PE-0005,Rev 1, Evaluation of Flooding of Incore Instrumentation Room Surry Power Station Unit 1, as Result of 880517 Leak from Refueling Cavity.Rept Identifies Potential Effects of Borated Water Flooding
Date released: 12/10/2018 Download: ML18152B190


Rev 1, Evaluation of Flooding of Incore Instrumentation Room Surry Power Station Unit 1.
ML18152B191
Person / Time
Site: Surry Dominion icon.png
Issue date: 09/01/1988
From: Woody G
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML18152B191 (6)
Forwards Technical Rept PE-0005,Rev 1, Evaluation of Flooding of Incore Instrumentation Room Surry Power Station Unit 1, as Result of 880517 Leak from Refueling Cavity.Rept Identifies Potential Effects of Borated Water Flooding
ML18152B189
Person / Time
Site: Surry Dominion icon.png
Issue date: 09/02/1988
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
Download: ML18152B189 (1)