Docket Nos. 50-280 and 50-281 Mr. D. S. Cruden e
Vice President - Nuclear June 171 1983 Virginia Electric and Power Company Post Office Box 26666 Richmond, Virginia 23261
Dear Mr. Cruden:
DISTRIBUTION ooclet:-rne-MRc PDR Local PDR PD22 Rdg.
T. Murley/J.
OGC-vff F. Miraglia C. Rossi S. Varga G. Lainas
SUBJECT:
H. Berkm'l REQUEST FOR RELIEF FROM HYDROSTATIC TEST REQUIRED BY ASME SECTION XI REQUIREMENTS~ SURRY POWER STATION UNITS 1 AND 2 (TAC NOS. 64766 AND 64767)
D. Miller C. Patel E. Jordan B. Grimes SniezekT. Barnhart ACRS ( 10)
GPA/PA ARM/LFMB Gray File By letter dated February 13, 1987, pursuant to 10 CFR 50.55a, paragraph (g)(5),
you requested relief from a hydrostatic test required by ASME Boiler and Pressure Vessel Code (ASME Code)Section XI requirements at Surry Units 1 and 2.
~~e have reviewed your request.
Based on our review, we have concluded that the relief may be granted as requested.
The enclosed Safety Evaluation pro-vides the details and conclusions of our review.
For the relief that has been granted, we have det~rmined that the ASME Code Section XI r~quirements are impractical and that pursuant to 10 CFR 50.55a(g)
(6)(i), the relief is authorized by law and will not endanger life or property or the common defense and security and is otherwise fn th1= public interest, giving due consideration to the burden upon the licensee that could result if the requir~ments were imposed on the facility.
The request for relief complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulatior1s. Thus, th~ Commission, having made the appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter l, approves your request for relief.
8807050136 880617 PDR ADOCK 05000280 p
Enclosure:
As stated cc w/enclosure:
See next page
- See previous concurrence
- LA:PDII-2 DMiller 6/14i88
- PM:PDII-2 CPatel:bg 6/14/88 Sincerely, Herbert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation
- D:PDII-2 HBerkow 6/
/88
- OGC 6/17/88 (8)
Docket Nos. 50-280 and 50-281 Mr. D.S. Cruden e
Vice President - Nuclear Virginia Electric and Power Post Office Box 26666 Richmond, Virginia 23261
Dear Mr. Cruden:
Company DISTRIBUTION oocket-F,Te-NRc PDR Local PDR PD22 Rdg.
T. Mu r 1 ey / J.
OGC-WF F. Miraglia C. Rossi S. Varga G. Lainas
SUBJECT:
H. Berkow REQUEST FOR RELIEFS FROM HYDROSTATIC TEST REQUIRED BY
/.J.SME SECTION XI REQUIREMENTS, SURRY POvJER STATION UNITS 1 AND 2 (TAC NOS. 64766 AND 64767)
D. Miller C. Patel E. Jordan B. Grimes SniezekT. Barnhart ACRS (10)
GPA/PA ARM/LFMB Gray File By letter dated February 13, 1987, pursuant to 10 CFR 50.55a, paragraph g(5),
you requested reliefs from a hydrostatic test required by ASME Boiler and Pressure Vessel Code (ASME Code)Section XI requirements at Surry Units 1 and 2.
We have reviewed your request. Based on our review, we have concluded that the reliefs may be granted as requested.
The enclosed Safety Evaluation pro-vides the details and conclusions of our review.
For the reliefs that have been granted, we have determined that the ASME Code Section XI requirements are impractical and that pursuant to 10 CFR 50.55a(g)
(6)(i), the reliefs are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
The request for reliefs complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. Thus, the Commission, having made the appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter 1, approves your request for reliefs.
Enclosure:
As stated cc w/enclosure:
See next page L~.
-2 m
er 6/\\ /88 cf't' PM: PDII-2 CPatel:bg 6/ /4-/88 Sincerely, Herbert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation
~
6/
/88 oGeU4-,,tlJ
/\\/Jj,~rf 6/ l]/88 (8)
Mr. D. S. Crud~n Virginia Electric and Power Company cc:
Mr. Michael W. Maupin Hunton and Williams Post Office Box 1535 Richmond, Virginia 23212 Mr. David L. Benson, Manager Surry Power Station Post Office Box 315 Surry, Virginia 23883 Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission Post Office Box 166, Route 1 Surry, Virginia 23883 Mr. Sherlock Holmes, Chairman Board of Supervisors of Surry Couoty Surry County Courthouse Surry, Virginia 23683 W. T. Lough Virginia Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23209 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Jan1es B. Kenley, M.D., Commissioner Department of Health 109 Governor Street Richmond, Virginia 23219 Surry Power Station Attorney General Supreme Court Building 101 North 8th Street Richmond, Virginia 23219
- ,