Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18139B164 + (ML18139B164)
- ML18139B165 + (ML18139B165)
- ML18139B166 + (ML18139B166)
- ML18139B167 + (ML18139B167)
- ML18139B168 + (ML18139B168)
- 05000280/LER-1981-001, Forwards LER 81-001/01T-0 + (ML18139B169)
- ML18139B170 + (ML18139B170)
- 05000280/LER-1981-001-01, /01T-0:on 810225,w/unit Defueled for Steam Generator Replacement,Routine Testing Exam of Loop a Main Steam Piping Revealed Linear Indications.Caused by Corrosion Pitting.Subj Areas Will Be Repaired + (ML18139B171)
- ML18139B175 + (ML18139B175)
- IR 05000280/1980044 + (ML18139B177)
- 05000281/LER-1981-020, Forwards LER 81-020/03L-0 + (ML18139B178)
- ML18139B179 + (ML18139B179)
- 05000281/LER-1981-020-03, /03L-0:on 810223,during Full power,RM-CC-106 Alert & High Alarm Lights Energized W/O Initiating Required Automatic Action.Caused by Failed Card in Alarm Circuit.Card Replaced & Tested + (ML18139B180)
- ML18139B181 + (ML18139B181)
- ML18139B182 + (ML18139B182)
- ML18139B183 + (ML18139B183)
- ML18139B184 + (ML18139B184)
- ML18139B186 + (ML18139B186)
- ML18139B187 + (ML18139B187)
- ML18139B188 + (ML18139B188)
- IR 05000280/1980043 + (ML18139B189)
- 05000280/LER-1980-052, Forwards Updated LER 80-052/03X-1 + (ML18139B190)
- ML18139B191 + (ML18139B191)
- 05000280/LER-1980-052-03, Water Entered Process Vent Sys,Filling Monitors RM-GW-101 & 102 & Health Physics Accountability Sampler.Caused by Gas Stripper Overflowing. Sys Flushed,Dried & Oiled.Vacuum Pump & Filters Replaced + (ML18139B192)
- ML18139B193 + (ML18139B193)
- ML18139B197 + (ML18139B197)
- ML18139B198 + (ML18139B198)
- ML18139B200 + (ML18139B200)
- ML18139B201 + (ML18139B201)
- 05000280/LER-1981-004, Forwards LER 81-004/03L-0 + (ML18139B202)
- ML18139B203 + (ML18139B203)
- ML18139B204 + (ML18139B204)
- IR 05000280/1980029 + (ML18139B206)
- ML18139B207 + (ML18139B207)
- ML18139B208 + (ML18139B208)
- ML18139B209 + (ML18139B209)
- ML18139B211 + (ML18139B211)
- ML18139B212 + (ML18139B212)
- 05000280/LER-1980-010-01, Overstress on 18-inch Line CC-9-121,unit 2 Supply to RHR Exchanger,Found During Pipe Stress Reanalysis on Show Cause Lines.Caused by Supports Installed to Prevent Overstress During DBE + (ML18139B213)
- 05000280/LER-1980-013-03, Valve HCV-1852A to Tank 1-SI-TK-1A Delayed Closing 30-50 Secs,Resulting in Tank Draining Below Tech Spec Level.Caused by Moisture in Air Lines Feeding Valve Operator.Tank Filled to Tech Spec Level + (ML18139B214)
- 05000280/LER-1980-020-01, Heat Tracing Circuits 24A,B & C for Unit Boric Acid Filter Sys Found Tagged Out of Svc Since 800211,during Review of Penetrant Test 27B.Caused by Error During Maint on Unit 1 Drain Line + (ML18139B215)
- 05000280/LER-1980-022-03, Snubbers 1-RC-HSS-116 & 1-RC-HSS-117 Found Out of Position During Inaccessible Snubbers Visual Insp 1-PT-39B-1.Caused by Improper Installation Due to Design Change Deficiency + (ML18139B216)
- ML18139B217 + (ML18139B217)
- ML18139B219 + (ML18139B219)
- ML18139B220 + (ML18139B220)
- ML18139B221 + (ML18139B221)
- ML18139B223 + (ML18139B223)
- ML18139B224 + (ML18139B224)
- IR 05000280/1981003 + (ML18139B225)
- ML18139B231 + (ML18139B231)
- 05000281/LER-1981-021, Forwards LER 81-021/03L-0 + (ML18139B232)