Category:CONTRACTED REPORT - RTA
MONTHYEARML18151A3861995-10-31031 October 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Summary of Results ML18151A2081995-05-31031 May 1995 the Probability of Containment Failure by Direct Containment Heating in Surry ML18153A7551995-05-31031 May 1995 Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan. ML18151A2431995-05-31031 May 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry, Unit 1.Evaluation of Severe Accident Risk During Mid-Loop Operations.Appendices ML20085J2801995-05-31031 May 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry, Unit 1.Evaluation of Severe Accident Risk During Mid-Loop Operations.Main Report ML18151A9741995-02-13013 February 1995 Technical Evaluation Rept on Third 10-Yr Interval ISI Program Plan:Virginia Electric & Power Co,Surry Power Station,Unit 1. ML18152A3451994-10-31031 October 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:North Anna-1/-2 & Surry-1/-2. ML18151A3721994-08-31031 August 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry, Unit 1.Analysis of Core Damage Frequency from Seismic Events During Mid-Loop Operations.Main Report ML18151A5771994-08-31031 August 1994 a Pilot Application of RISK-BASED Methods to Establish Inservice Inspection Priorities for Nuclear Components at Surry Unit 1 Nuclear Power Station ML18150A4631994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Fires During Mid-Loop Operations.Appendices ML18151A2271994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Fires During Mid-Loop Operations.Main Report ML18151A1681994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Floods During Mid-Loop Operations ML18151A3841994-07-31031 July 1994 Technical Evaluation Rept Pump & Valve Inservice Testing Program Plant Units 1 & 2. ML18151A2411994-06-30030 June 1994 Experiments to Investigate Direct Containment Heating Phenomena with Scaled Models of the Surry Nuclear Power Plant ML18151A2421994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices E (Sections E.1-E.8) ML18151A2261994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices I ML18151A2621994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices E (Sections E.9-E.16) ML18150A4591994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Main Report (Chapters 1-6) ML18151A2071994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices A-D ML18151A1491994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Main Report (Chapters 7-12) ML18150A4621994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices F-H ML20065E2531994-03-31031 March 1994 Summary of Melcor 1.8.2 Calculations for Three LOCA Sequences (AG,S2D & S3D) at the Surry Plant ML18151A2391993-11-30030 November 1993 Assessment of the Potential for High Pressure MELT Ejection Resulting from a Surry Station Blackout Transient ML20064K8021993-08-10010 August 1993 Abridged Risk Study During Low Power/Shutdown Operation at Surry ML18151A8991992-05-31031 May 1992 Summary Rept of :Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Draft Ltr Rept ML18152A0501992-05-29029 May 1992 Abridged Risk Study During Low Power /Shutdown Operation at Surry, Draft Ltr Rept ML20028H6001990-12-31031 December 1990 Analysis of Core Damage Frequency: Surry Power Station,Unit 1 External Events ML20058H7591990-10-31031 October 1990 Evaluation of Severe Accident Risks: Surry Unit 1.Main Report ML20058H7641990-10-31031 October 1990 Evaluation of Severe Accident Risks: Surry Unit 1. Appendices ML18152A1611990-09-24024 September 1990 Technical Evaluation Rept Surry Power Station Units 1 & 2,Station Blackout Evaluation, Final Rept ML18151A1431990-04-30030 April 1990 Analysis of Core Damage Frequency:Surry,Unit 1,INTERNAL Events ML18150A4501990-04-30030 April 1990 Analysis of Core Damage Frequency: Surry,Unit 1,INTERNAL Events Appendices ML20058K1701990-03-30030 March 1990 Pump & Valve Inservice Testing Program,Surry Power Station, Units 1 & 2, Technical Evaluation Rept ML20155K4931988-10-31031 October 1988 Analyses of Natural Circulation During a Surry Station Blackout Using SCDAP/RELAP5 ML18153B5471987-07-31031 July 1987 PRA Applications Program for Insp at Surry Nuclear Power Station,Unit 1, Draft Rept ML18150A1221987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Surry 1 & 2, Final Informal Rept ML18152A5831987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2. ML18150A1191987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2, Final Informal Rept ML18150A1881987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, North Anna Units 1 & 2 & Surry Units 1 & 2, Informal Rept ML20206F0711987-04-0808 April 1987 Flow-Pattern Results for Tmlb' Accident Sequence in Surry Plant Using Melprog ML20206B2041987-03-31031 March 1987 Metallurgical Evaluation of an 18-INCH Feedwater Line Failure at the Surry Unit 2 Power Station ML18150A1261987-03-31031 March 1987 Technical Evaluation Rept TMI Action-NUREG-0737 (II.D.1) Relief & Safety Valve Testing Surry Units 1 & 2, Informal Rept ML20211N5031987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept ML20206C8291986-11-30030 November 1986 Analysis of Core Damage Frequency from Internal Events:Surry Unit 1 ML20206H0811986-05-0909 May 1986 Some Sensitivities for Direct Containment Heating Loads ML20138H2181985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Beaver Valley Unit 1,North Anna Units 1 & 2 & Surry Units 1 & 2 ML18142A4011985-05-0303 May 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2 'Post-Trip Review:Data & Info Capabilities' for Surry Power Station,Units 1 & 2.... ML18152A0951985-04-24024 April 1985 Masonry Wall Design,Surry Power Station Units 1 & 2, Technical Evaluation Rept ML20206F0861985-02-28028 February 1985 Draft COBRA-NC Analysis of Station Blackout Transient (Tmlb') for Surry Plant. Inel Viewgraphs Entitled Structural Failure Studies of RCS Also Encl ML18152A5761985-01-31031 January 1985 Conformance to Reg Guide 1.97,Surry Power Station Units 1 & 2. 1995-05-31
[Table view] Category:QUICK LOOK
MONTHYEARML18151A3861995-10-31031 October 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Summary of Results ML18151A2081995-05-31031 May 1995 the Probability of Containment Failure by Direct Containment Heating in Surry ML18153A7551995-05-31031 May 1995 Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan. ML18151A2431995-05-31031 May 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry, Unit 1.Evaluation of Severe Accident Risk During Mid-Loop Operations.Appendices ML20085J2801995-05-31031 May 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry, Unit 1.Evaluation of Severe Accident Risk During Mid-Loop Operations.Main Report ML18151A9741995-02-13013 February 1995 Technical Evaluation Rept on Third 10-Yr Interval ISI Program Plan:Virginia Electric & Power Co,Surry Power Station,Unit 1. ML18152A3451994-10-31031 October 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:North Anna-1/-2 & Surry-1/-2. ML18151A3721994-08-31031 August 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry, Unit 1.Analysis of Core Damage Frequency from Seismic Events During Mid-Loop Operations.Main Report ML18151A5771994-08-31031 August 1994 a Pilot Application of RISK-BASED Methods to Establish Inservice Inspection Priorities for Nuclear Components at Surry Unit 1 Nuclear Power Station ML18150A4631994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Fires During Mid-Loop Operations.Appendices ML18151A2271994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Fires During Mid-Loop Operations.Main Report ML18151A1681994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Floods During Mid-Loop Operations ML18151A3841994-07-31031 July 1994 Technical Evaluation Rept Pump & Valve Inservice Testing Program Plant Units 1 & 2. ML18151A2411994-06-30030 June 1994 Experiments to Investigate Direct Containment Heating Phenomena with Scaled Models of the Surry Nuclear Power Plant ML18151A2421994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices E (Sections E.1-E.8) ML18151A2261994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices I ML18151A2621994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices E (Sections E.9-E.16) ML18150A4591994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Main Report (Chapters 1-6) ML18151A2071994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices A-D ML18151A1491994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Main Report (Chapters 7-12) ML18150A4621994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices F-H ML20065E2531994-03-31031 March 1994 Summary of Melcor 1.8.2 Calculations for Three LOCA Sequences (AG,S2D & S3D) at the Surry Plant ML18151A2391993-11-30030 November 1993 Assessment of the Potential for High Pressure MELT Ejection Resulting from a Surry Station Blackout Transient ML20064K8021993-08-10010 August 1993 Abridged Risk Study During Low Power/Shutdown Operation at Surry ML18151A8991992-05-31031 May 1992 Summary Rept of :Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Draft Ltr Rept ML18152A0501992-05-29029 May 1992 Abridged Risk Study During Low Power /Shutdown Operation at Surry, Draft Ltr Rept ML20028H6001990-12-31031 December 1990 Analysis of Core Damage Frequency: Surry Power Station,Unit 1 External Events ML20058H7591990-10-31031 October 1990 Evaluation of Severe Accident Risks: Surry Unit 1.Main Report ML20058H7641990-10-31031 October 1990 Evaluation of Severe Accident Risks: Surry Unit 1. Appendices ML18152A1611990-09-24024 September 1990 Technical Evaluation Rept Surry Power Station Units 1 & 2,Station Blackout Evaluation, Final Rept ML18151A1431990-04-30030 April 1990 Analysis of Core Damage Frequency:Surry,Unit 1,INTERNAL Events ML18150A4501990-04-30030 April 1990 Analysis of Core Damage Frequency: Surry,Unit 1,INTERNAL Events Appendices ML20058K1701990-03-30030 March 1990 Pump & Valve Inservice Testing Program,Surry Power Station, Units 1 & 2, Technical Evaluation Rept ML20155K4931988-10-31031 October 1988 Analyses of Natural Circulation During a Surry Station Blackout Using SCDAP/RELAP5 ML18153B5471987-07-31031 July 1987 PRA Applications Program for Insp at Surry Nuclear Power Station,Unit 1, Draft Rept ML18150A1221987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Surry 1 & 2, Final Informal Rept ML18152A5831987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2. ML18150A1191987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2, Final Informal Rept ML18150A1881987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, North Anna Units 1 & 2 & Surry Units 1 & 2, Informal Rept ML20206F0711987-04-0808 April 1987 Flow-Pattern Results for Tmlb' Accident Sequence in Surry Plant Using Melprog ML20206B2041987-03-31031 March 1987 Metallurgical Evaluation of an 18-INCH Feedwater Line Failure at the Surry Unit 2 Power Station ML18150A1261987-03-31031 March 1987 Technical Evaluation Rept TMI Action-NUREG-0737 (II.D.1) Relief & Safety Valve Testing Surry Units 1 & 2, Informal Rept ML20211N5031987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept ML20206C8291986-11-30030 November 1986 Analysis of Core Damage Frequency from Internal Events:Surry Unit 1 ML20206H0811986-05-0909 May 1986 Some Sensitivities for Direct Containment Heating Loads ML20138H2181985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Beaver Valley Unit 1,North Anna Units 1 & 2 & Surry Units 1 & 2 ML18142A4011985-05-0303 May 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2 'Post-Trip Review:Data & Info Capabilities' for Surry Power Station,Units 1 & 2.... ML18152A0951985-04-24024 April 1985 Masonry Wall Design,Surry Power Station Units 1 & 2, Technical Evaluation Rept ML20206F0861985-02-28028 February 1985 Draft COBRA-NC Analysis of Station Blackout Transient (Tmlb') for Surry Plant. Inel Viewgraphs Entitled Structural Failure Studies of RCS Also Encl ML18152A5761985-01-31031 January 1985 Conformance to Reg Guide 1.97,Surry Power Station Units 1 & 2. 1995-05-31
[Table view] Category:ETC. (PERIODIC
MONTHYEARML18151A3861995-10-31031 October 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Summary of Results ML18151A2081995-05-31031 May 1995 the Probability of Containment Failure by Direct Containment Heating in Surry ML18153A7551995-05-31031 May 1995 Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan. ML18151A2431995-05-31031 May 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry, Unit 1.Evaluation of Severe Accident Risk During Mid-Loop Operations.Appendices ML20085J2801995-05-31031 May 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry, Unit 1.Evaluation of Severe Accident Risk During Mid-Loop Operations.Main Report ML18151A9741995-02-13013 February 1995 Technical Evaluation Rept on Third 10-Yr Interval ISI Program Plan:Virginia Electric & Power Co,Surry Power Station,Unit 1. ML18152A3451994-10-31031 October 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:North Anna-1/-2 & Surry-1/-2. ML18151A3721994-08-31031 August 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry, Unit 1.Analysis of Core Damage Frequency from Seismic Events During Mid-Loop Operations.Main Report ML18151A5771994-08-31031 August 1994 a Pilot Application of RISK-BASED Methods to Establish Inservice Inspection Priorities for Nuclear Components at Surry Unit 1 Nuclear Power Station ML18150A4631994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Fires During Mid-Loop Operations.Appendices ML18151A2271994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Fires During Mid-Loop Operations.Main Report ML18151A1681994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Floods During Mid-Loop Operations ML18151A3841994-07-31031 July 1994 Technical Evaluation Rept Pump & Valve Inservice Testing Program Plant Units 1 & 2. ML18151A2411994-06-30030 June 1994 Experiments to Investigate Direct Containment Heating Phenomena with Scaled Models of the Surry Nuclear Power Plant ML18151A2421994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices E (Sections E.1-E.8) ML18151A2261994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices I ML18151A2621994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices E (Sections E.9-E.16) ML18150A4591994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Main Report (Chapters 1-6) ML18151A2071994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices A-D ML18151A1491994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Main Report (Chapters 7-12) ML18150A4621994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices F-H ML20065E2531994-03-31031 March 1994 Summary of Melcor 1.8.2 Calculations for Three LOCA Sequences (AG,S2D & S3D) at the Surry Plant ML18151A2391993-11-30030 November 1993 Assessment of the Potential for High Pressure MELT Ejection Resulting from a Surry Station Blackout Transient ML20064K8021993-08-10010 August 1993 Abridged Risk Study During Low Power/Shutdown Operation at Surry ML18151A8991992-05-31031 May 1992 Summary Rept of :Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Draft Ltr Rept ML18152A0501992-05-29029 May 1992 Abridged Risk Study During Low Power /Shutdown Operation at Surry, Draft Ltr Rept ML20028H6001990-12-31031 December 1990 Analysis of Core Damage Frequency: Surry Power Station,Unit 1 External Events ML20058H7591990-10-31031 October 1990 Evaluation of Severe Accident Risks: Surry Unit 1.Main Report ML20058H7641990-10-31031 October 1990 Evaluation of Severe Accident Risks: Surry Unit 1. Appendices ML18152A1611990-09-24024 September 1990 Technical Evaluation Rept Surry Power Station Units 1 & 2,Station Blackout Evaluation, Final Rept ML18151A1431990-04-30030 April 1990 Analysis of Core Damage Frequency:Surry,Unit 1,INTERNAL Events ML18150A4501990-04-30030 April 1990 Analysis of Core Damage Frequency: Surry,Unit 1,INTERNAL Events Appendices ML20058K1701990-03-30030 March 1990 Pump & Valve Inservice Testing Program,Surry Power Station, Units 1 & 2, Technical Evaluation Rept ML20155K4931988-10-31031 October 1988 Analyses of Natural Circulation During a Surry Station Blackout Using SCDAP/RELAP5 ML18153B5471987-07-31031 July 1987 PRA Applications Program for Insp at Surry Nuclear Power Station,Unit 1, Draft Rept ML18150A1221987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Surry 1 & 2, Final Informal Rept ML18152A5831987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2. ML18150A1191987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2, Final Informal Rept ML18150A1881987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, North Anna Units 1 & 2 & Surry Units 1 & 2, Informal Rept ML20206F0711987-04-0808 April 1987 Flow-Pattern Results for Tmlb' Accident Sequence in Surry Plant Using Melprog ML20206B2041987-03-31031 March 1987 Metallurgical Evaluation of an 18-INCH Feedwater Line Failure at the Surry Unit 2 Power Station ML18150A1261987-03-31031 March 1987 Technical Evaluation Rept TMI Action-NUREG-0737 (II.D.1) Relief & Safety Valve Testing Surry Units 1 & 2, Informal Rept ML20211N5031987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept ML20206C8291986-11-30030 November 1986 Analysis of Core Damage Frequency from Internal Events:Surry Unit 1 ML20206H0811986-05-0909 May 1986 Some Sensitivities for Direct Containment Heating Loads ML20138H2181985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Beaver Valley Unit 1,North Anna Units 1 & 2 & Surry Units 1 & 2 ML18142A4011985-05-0303 May 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2 'Post-Trip Review:Data & Info Capabilities' for Surry Power Station,Units 1 & 2.... ML18152A0951985-04-24024 April 1985 Masonry Wall Design,Surry Power Station Units 1 & 2, Technical Evaluation Rept ML20206F0861985-02-28028 February 1985 Draft COBRA-NC Analysis of Station Blackout Transient (Tmlb') for Surry Plant. Inel Viewgraphs Entitled Structural Failure Studies of RCS Also Encl ML18152A5761985-01-31031 January 1985 Conformance to Reg Guide 1.97,Surry Power Station Units 1 & 2. 1995-05-31
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML18151A3861995-10-31031 October 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Summary of Results ML18151A2081995-05-31031 May 1995 the Probability of Containment Failure by Direct Containment Heating in Surry ML18153A7551995-05-31031 May 1995 Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan. ML18151A2431995-05-31031 May 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry, Unit 1.Evaluation of Severe Accident Risk During Mid-Loop Operations.Appendices ML20085J2801995-05-31031 May 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry, Unit 1.Evaluation of Severe Accident Risk During Mid-Loop Operations.Main Report ML18151A9741995-02-13013 February 1995 Technical Evaluation Rept on Third 10-Yr Interval ISI Program Plan:Virginia Electric & Power Co,Surry Power Station,Unit 1. ML18152A3451994-10-31031 October 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:North Anna-1/-2 & Surry-1/-2. ML18151A3721994-08-31031 August 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry, Unit 1.Analysis of Core Damage Frequency from Seismic Events During Mid-Loop Operations.Main Report ML18151A5771994-08-31031 August 1994 a Pilot Application of RISK-BASED Methods to Establish Inservice Inspection Priorities for Nuclear Components at Surry Unit 1 Nuclear Power Station ML18150A4631994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Fires During Mid-Loop Operations.Appendices ML18151A2271994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Fires During Mid-Loop Operations.Main Report ML18151A1681994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Floods During Mid-Loop Operations ML18151A3841994-07-31031 July 1994 Technical Evaluation Rept Pump & Valve Inservice Testing Program Plant Units 1 & 2. ML18151A2411994-06-30030 June 1994 Experiments to Investigate Direct Containment Heating Phenomena with Scaled Models of the Surry Nuclear Power Plant ML18151A2421994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices E (Sections E.1-E.8) ML18151A2261994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices I ML18151A2621994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices E (Sections E.9-E.16) ML18150A4591994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Main Report (Chapters 1-6) ML18151A2071994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices A-D ML18151A1491994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Main Report (Chapters 7-12) ML18150A4621994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Surry,Unit 1.Analysis of Core Damage Frequency from Internal Events During Mid-Loop Operations.Appendices F-H ML20065E2531994-03-31031 March 1994 Summary of Melcor 1.8.2 Calculations for Three LOCA Sequences (AG,S2D & S3D) at the Surry Plant ML18151A2391993-11-30030 November 1993 Assessment of the Potential for High Pressure MELT Ejection Resulting from a Surry Station Blackout Transient ML20064K8021993-08-10010 August 1993 Abridged Risk Study During Low Power/Shutdown Operation at Surry ML18151A8991992-05-31031 May 1992 Summary Rept of :Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Draft Ltr Rept ML18152A0501992-05-29029 May 1992 Abridged Risk Study During Low Power /Shutdown Operation at Surry, Draft Ltr Rept ML20028H6001990-12-31031 December 1990 Analysis of Core Damage Frequency: Surry Power Station,Unit 1 External Events ML20058H7591990-10-31031 October 1990 Evaluation of Severe Accident Risks: Surry Unit 1.Main Report ML20058H7641990-10-31031 October 1990 Evaluation of Severe Accident Risks: Surry Unit 1. Appendices ML18152A1611990-09-24024 September 1990 Technical Evaluation Rept Surry Power Station Units 1 & 2,Station Blackout Evaluation, Final Rept ML18151A1431990-04-30030 April 1990 Analysis of Core Damage Frequency:Surry,Unit 1,INTERNAL Events ML18150A4501990-04-30030 April 1990 Analysis of Core Damage Frequency: Surry,Unit 1,INTERNAL Events Appendices ML20058K1701990-03-30030 March 1990 Pump & Valve Inservice Testing Program,Surry Power Station, Units 1 & 2, Technical Evaluation Rept ML20155K4931988-10-31031 October 1988 Analyses of Natural Circulation During a Surry Station Blackout Using SCDAP/RELAP5 ML18153B5471987-07-31031 July 1987 PRA Applications Program for Insp at Surry Nuclear Power Station,Unit 1, Draft Rept ML18150A1221987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Surry 1 & 2, Final Informal Rept ML18152A5831987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2. ML18150A1191987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2, Final Informal Rept ML18150A1881987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, North Anna Units 1 & 2 & Surry Units 1 & 2, Informal Rept ML20206F0711987-04-0808 April 1987 Flow-Pattern Results for Tmlb' Accident Sequence in Surry Plant Using Melprog ML20206B2041987-03-31031 March 1987 Metallurgical Evaluation of an 18-INCH Feedwater Line Failure at the Surry Unit 2 Power Station ML18150A1261987-03-31031 March 1987 Technical Evaluation Rept TMI Action-NUREG-0737 (II.D.1) Relief & Safety Valve Testing Surry Units 1 & 2, Informal Rept ML20211N5031987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept ML20206C8291986-11-30030 November 1986 Analysis of Core Damage Frequency from Internal Events:Surry Unit 1 ML20206H0811986-05-0909 May 1986 Some Sensitivities for Direct Containment Heating Loads ML20138H2181985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Beaver Valley Unit 1,North Anna Units 1 & 2 & Surry Units 1 & 2 ML18142A4011985-05-0303 May 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2 'Post-Trip Review:Data & Info Capabilities' for Surry Power Station,Units 1 & 2.... ML18152A0951985-04-24024 April 1985 Masonry Wall Design,Surry Power Station Units 1 & 2, Technical Evaluation Rept ML20206F0861985-02-28028 February 1985 Draft COBRA-NC Analysis of Station Blackout Transient (Tmlb') for Surry Plant. Inel Viewgraphs Entitled Structural Failure Studies of RCS Also Encl ML18152A5761985-01-31031 January 1985 Conformance to Reg Guide 1.97,Surry Power Station Units 1 & 2. 1995-05-31
[Table view] |