Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000272/LER-1990-026, :on 901130,leakage of ASME Code Class 2 & 3 Piping Occurred.Caused by Equipment Failure.Piping Upgrade Continuing & Pipe Replacement Reviewed & Modified Based on Routine Insp Activites + (ML18095A701)
- 05000311/LER-1990-042, :on 901220,SWS Through Wall Leak on Inlet Pipe to Component Cooling Pump Room Cooler Occurred.Caused by Equipment Failure & Internal Corrosion.Carbon Steel Pipe Will Be Painted for Protection + (ML18095A702)
- 05000311/LER-1990-043, :on 901220,all Control Room Analog Rod Position Indicator Indication Lost.Caused by Ribbon Cable Insulation Wearing Through to Wire.Preventive Maint Program Will Be Reviewed & Modified + (ML18095A703)
- ML18095A705 + (ML18095A705)
- ML18095A706 + (ML18095A706)
- ML18095A707 + (ML18095A707)
- ML18095A708 + (ML18095A708)
- ML18095A710 + (ML18095A710)
- ML18095A711 + (ML18095A711)
- IR 05000272/1990026 + (ML18095A713)
- ML18095A714 + (ML18095A714)
- ML18095A715 + (ML18095A715)
- ML18095A716 + (ML18095A716)
- ML18095A717 + (ML18095A717)
- ML18095A721 + (ML18095A721)
- ML18095A722 + (ML18095A722)
- ML18095A723 + (ML18095A723)
- ML18095A724 + (ML18095A724)
- ML18095A725 + (ML18095A725)
- ML18095A726 + (ML18095A726)
- 05000272/LER-1990-040-01, :on 901112,ground Fault Indication Received in Control Room for Both B & C 125-volt Dc Vital Busses Due to Installation of 125-volt Ac Struthers Dunn Relay Coil.Caused by Personnel Error.Event Reviewed + (ML18095A727)
- 05000311/LER-1991-001, :on 910104,discovered That Hourly Roving Fire Watch Patrol for Several Areas Not Completed.Caused by Personnel Error.Responsible Individual Terminated & Event Discussed W/Appropriate Personnel + (ML18095A728)
- ML18095A729 + (ML18095A729)
- 05000311/LER-1990-029, :on 900628,reactor Trip Occurred Following Loss of Generator Feedwater Pumps Resulting from Failure of Volt Transformer.Caused by Inadequate Preventive Maint.Design Change Concerns Reviewed by Mgt + (ML18095A730)
- ML18095A731 + (ML18095A731)
- ML18095A732 + (ML18095A732)
- ML18095A733 + (ML18095A733)
- SECY-18-0006, M180405A: Affirmation Session - SECY-18-0006-UNITECH Services Group, Inc.; SECY-18-0018 - Florida Power and Light Co. (Turkey Point Nuclear Generating Units 6 and 7) + (ML18095A734)
- ML18095A735 + (ML18095A735)
- ML18095A736 + (ML18095A736)
- ML18095A737 + (ML18095A737)
- ML18095A738 + (ML18095A738)
- ML18095A739 + (ML18095A739)
- ML18095A740 + (ML18095A740)
- 05000272/LER-1991-001-02, :on 910111,containment purge/pressure-vacuum Relief Sys Isolation Signal Actuated.Caused by Equipment Failure.Channel Detector Connectors Checked & Returned to Svc + (ML18095A741)
- PMNS20180450, Update on the State of Wyoming Becoming an Agreement State + (ML18095A742)
- ML18095A744 + (ML18095A744)
- ML18095A747 + (ML18095A747)
- ML18095A748 + (ML18095A748)
- ML18095A749 + (ML18095A749)
- 05000311/LER-1991-002, :on 910116,radiation Monitoring Sys Channel Failed.Caused by Equipment Design Concerns.Sys Design Mods Under Investigation.Channel Inspected & Repaired + (ML18095A750)
- ML18095A751 + (ML18095A751)
- ML18095A752 + (ML18095A752)
- ML18095A755 + (ML18095A755)
- ML18095A757 + (ML18095A757)
- ML18095A758 + (ML18095A758)
- ML18095A759 + (ML18095A759)
- ML18095A760 + (ML18095A760)
- ML18095A761 + (ML18095A761)
- ML18095A763 + (ML18095A763)
- ML18095A764 + (ML18095A764)