ML18095A758

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Modifying 3.6.2.3 to Redefine Applicable Actions to Be Taken on Basis of Inoperable Fan Units as Opposed to Inoperable Groups of Fan Coolers
ML18095A758
Person / Time
Site: Salem  PSEG icon.png
Issue date: 02/13/1991
From:
Public Service Enterprise Group
To:
Shared Package
ML18095A757 List:
References
NUDOCS 9102260294
Download: ML18095A758 (3)


Text

..

ATTACHMENT 2 TECHNICAL SPECIFICATION PAGES WITH PEN AND INK CHANGES LICENSE APPLICATION 91-02, NLR-N91020 CONTAINMENT COOLING SYSTEM The following Technical Specifications have been revised to reflect the proposed changes:

UNIT 1 Technical Specification 3.6.2.3 3/4 6-11 UNIT 2 Technical Specification 3.6.2.3 3/4 6-12

COHiAINMENT SYSTEMS CONTA!NMENi' COOLING SY.SiEM L!MIT!NG CONOIT!ON FOR OP:~AT!ON f\\\\/-"-

3. S. Z. 3 TAP9e iAdepeAElu1t gN1i1ps af containment cooling fans shai1 be O?E?..AaL:.

wit!'I t'#O fan ~t:readt-af be auct one fan _systam tc. tfle tl'lil"d a..

!JNl.l;I.

APP.L!CABIL!'it:

MOOES

  • 1, Z and 3.

ACTION:

a.

. b.

l +ht\\E.£.l Wit.1 one~t~e a!>ove.-.qui.-.d ccnt.!inment cccilng fans

  • inoperable aAe eet.i eeft~ir.m~nt s~ra~ s~st!tlls OP:~et~ r!star! tne

.inoperable -fl"OW!il a1"'coo1in9 fa.~ )to OPEAASl..E s~t:.is wi<:hin 7 cays or be in at least HOT STANDBY wit.iin the next 6 nou~ and in-COWJ SHUTDOWN within followin 30 nours.

oR. Wloi<.

+hiz_ re.Vl"lci.'*'h 1riO ~-co..,\\o,

~.6.2.3 :ac~ ~=n~inmen~ cooling fa~sha11 be demonstrated O?:?.AaL!;

.. ~~end~ent.'fo..::

.CONTAINMENT SYSTEMS CONTAINMENT COOLING SYSTEM LIMITING CONDITION FOR OPERATION t=-, v'e..

3.6.2.3 Three inde~enaent gPewps ef containment cooling fans shall be OPERABLE~

with twe faA systems te each ef twe gFewps aAa ene fan system ta the third J>-

.,..-..group. P APPLICABILITY:

MODES. 1, 2 and 3.

ACTION:

0

a., With one~f the.. above re qui red containment coo 1 i ng fans inoperable aAa aeth ee*AtaiAment s13ray sy~tems OPERABLE~ re.stor'9 the inoperable iJ'&~p o,-cooling farl:i)to OPERABLE *status within 7 days or be in at leas; HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in 'COLO

~

SHUTDOWN within the fol lowing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

(}

rl ~ee o!C. ~'Rit.,\\

+kl. r.e.wia.W\\~""ca

b.

With,A~gPeupS'°"'of the above requ.ired containment cooling fans

\\no -re;.lolt..

[~tee.\\ ino erable, and both containment spray systems OPERABLE, restore at..

~

least ~ne-greup ef9cooling fans to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY WITHIN the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLO SHUTDOW ;fithin the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

RestoreA5ath abeve requiretf

.groups a-f"cooling fans to OPERABLE status within 7 days of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.2.3 Each gpeup ~containment cooling fan""shall be demonstrated OPERABLE:

SALEM - *.UNIT 2 3/4 6-12