MONTHYEARML18107A4991999-08-25025 August 1999 Application for Amends to Licenses DPR-70 & DPR-75,proposing to Authorize Licensee to Perform Single Cell Charging of Connected Cells in Operable Class 1E Batteries ML18107A5141999-08-25025 August 1999 Suppl to 971114 Application for Amends to Licenses DPR-70 & DPR-75,deleting Footnotes Added as one-time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Unit 2 ML18107A4631999-07-29029 July 1999 Application for Amends to Licenses DPR-70 & DPR-75,replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4581999-07-23023 July 1999 Application for Amends to Licenses DPR-70 & DPR-75 to Change TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4221999-07-0202 July 1999 Application for Amends to Licenses DPR-70 & DPR-75 to Relocate TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to Ufsar,Iaw GL 95-10 ML18107A3771999-06-10010 June 1999 Application for Amends to Licenses DPR-70 & DPR-75,modifying TS 3/4.6.1, Containment Integrity, by Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3571999-06-0404 June 1999 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57 Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New,Affiliated Nuclear Generating Company, PSEG Nuclear Llc.Proprietary Encls Withheld ML18107A2081999-04-14014 April 1999 Application for Amends to Licenses DPR-70 & DPR-75,revising TS 3/4.9.12, Fhvas, to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,Per NUREG-1431. Page 4 of 4 in Attachment 2 of Incoming Submittal Omitted ML18106B1571999-03-31031 March 1999 Suppl to 990115 Application for Amend to License DPR-70, Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0621999-02-0808 February 1999 Application for Amends to Licenses DPR-70 & DPR-75, Respectively.Proposed Amend Modifies ECCS Subsystems Surveillance Requirement 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0501999-02-0202 February 1999 Application for Amends to Licenses DPR-70 & DPR-75,revising Max Permissible Enrichment of Stored New Fuel Described in TS Section 5.6.1.1.Rept Entitled, Criticality Analysis of Salem Units 1 & 2 Fresh Fuel Racks, Encl ML18106B0221999-01-15015 January 1999 Application for Amend to License DPR-70,proposing one-time Changes to Certain Unit 1 TS Surveillance Requirements for Fuel Cycle 13,currently Scheduled to Begin on 990918 ML18106A9161998-10-12012 October 1998 Application for Amend to License DPR-75,requesting one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10.Basis for Requested Changes,Analysis Supporting No Significant Hazards Determination & Marked Up TS Pages,Encl ML18106A8921998-09-29029 September 1998 Application for Amends to Licenses DPR-72 & DPR-75,modifying TS 3/4.9.4 to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8761998-09-17017 September 1998 Application for Amends to Licenses DPR-70 & DPR-75,modifying TSs 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8351998-08-12012 August 1998 Application for Amends to Licenses DPR-70 & DPR-75,modifying TS for Containment Air Locks for Salem Units 1 & 2 ML18106A7911998-07-30030 July 1998 Application for Amends to Licenses DPR-70 & DPR-75,revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Following Phrase ML18106A4271998-03-26026 March 1998 Application for Amend to License DPR-70,changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A4221998-03-26026 March 1998 Application for Amends to Licenses DPR-70 & DPR-75, Respectively,Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A2521998-01-0808 January 1998 Supplemental Application for Amends to Licenses DPR-70 & DPR-75,respectively Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2111997-12-15015 December 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising TS to Adopt Option B of 10CFR50,App J,For Type B & C Testing & Modifying Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1941997-12-11011 December 1997 Application for Amend to License DPR-70,requesting one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6771997-11-14014 November 1997 Application for Amends to Licenses DPR-70 & DPR-75,providing TS Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6731997-11-14014 November 1997 Application for Amends to Licenses DPR-70 & DPR-75, Correcting Editorial & Administrative Errors in Ts,Which Existed Since Initial Issuance ML18102B6611997-11-0404 November 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising TS 3/4.8.1 Re EDG & Deleting SR 4.8.1.1.2.d.1,calling for Diesels to Be Subjected to Insp Based on Vendor Recommendations ML18102B6571997-11-0404 November 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6371997-10-29029 October 1997 Application for Amend to License DPR-75,revising TS 3/4.4.6, Steam Generators, Making One Time Change to Unit 2 SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6411997-10-29029 October 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising SR 4.8.1.1.2.d.2 Proposed in Util 960925 Submittal Re EDG Testing ML18102B6471997-10-24024 October 1997 Application for Amends to Licenses DPR-70 & DPR-75,modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6441997-10-24024 October 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6291997-10-21021 October 1997 Application for Amends to Licenses DPR-70 & DPR-75,extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers in Closed Position ML18102B6181997-10-14014 October 1997 Application for Amend to License DPR-70,modifying Pressure Isolation Valve Lco,Lco Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 ML18102B6061997-10-0606 October 1997 Application for Amend to License DPR-70,changing TS for LCOs 3.1.3.1, Movable Control Assemblies & 3.1.3.2.1, Position Indication Sys. ML18102B5551997-08-27027 August 1997 Application for Amends to Licenses DPR-70 & DPR-75,providing Revised TS Bases Pages for TS 3.7.3, CCW Sys, to State That CCW Pumps Required to Be Operable to Meet LCO ML18102B5281997-08-19019 August 1997 Application for Amend to License DPR-75,providing Addl Operational Flexibility to Allow Orderly Resumption of Startup & Preclude Unwarranted Power Transients at Plant Unit 2 ML18102B5321997-08-18018 August 1997 Application for Amend to License DPR-75,incorporating Plant Computer (P-250) Into TS Bases for Movable Control Assemblies ML18102B4871997-08-0101 August 1997 Application for Amends to Licenses DPR-70 & DPR-75,rewording TS Section 4.2.1 to State That Util Will Adhere to Section 7 Incidental Take Statement Approved by Natl Marine Fisheries Svc ML18102B3041997-05-14014 May 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising SR 4.7.6.1.d.1 to Indicate That Specified Acceptable Filter Dp Is to Be Measured Across Filter Housing & to Reflecting Filter Dp Acceptance Value of Greater than 2.70 Wg ML18102B2611997-05-0101 May 1997 Suppl Info to Util 970211 Application for Amends to Licenses DPR-70 & DPR-75,revising TS for Chilled Water Sys - Auxiliary Bldg Subsystem.Ref to Radiation Monitoring Signal Removed from Bases Section ML18102B2581997-05-0101 May 1997 Application for Amend to License DPR-75,revising TS Section 3/4.7.7 to Reflect Extended Allowed Outage Times & Creating New TS Section 3/4.7.11 to Address Importance of Switchgear & Penetration Area Ventilation Sys ML18102B0071997-04-30030 April 1997 Application for Amends to Licenses DPR-40,DPR-56,DPR-70 & DPR-75,requesting Consent of NRC for Indirect Transfer of Control of Interest in Plants That Will Occur Under Proposed Merger ML18102B2511997-04-28028 April 1997 Submits Suppl to 970131 & 0314 Applications for Amends to Licenses DPR-70 & DPR-75,revising TS on Pressurizer Power Operated Relief Valves.Suppl Issued to State That Conclusion of NSHC Remains Valid ML18102B0221997-04-25025 April 1997 Application for Amends to Licenses DPR-70 & DPR-75, Eliminating Flow Path from RHR Sys to RCS Hot Legs as Specified in LCO 3.5.2.c.2 ML18102A9791997-04-11011 April 1997 Application for Amends to Licenses DPR-70 & DPR-75, Increasing Cw Flow to 2550 Gpm for 31 Day Surveillance Fans Started & Operated in Low Speed ML18102A8951997-03-0404 March 1997 Application for Amends to Licenses DPR-70 & DPR-75,modifying ECCS Surveillance Test Acceptance Criteria for Centrifugal Charging & SI Pumps ML18102A8491997-02-11011 February 1997 Application for Amends to Licenses DPR-70 & DPR-75, Requesting Addition of New TS 3/4.7.10, Chilled Water Sys ML18102A8361997-01-31031 January 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising TS 3/4.4.3 to Ensure That Automatic Capability of Power Operated Relief Valve to Relieve Pressure Is Maintained When Valves Are Isolated by Closure of Block Valves ML18102A8021997-01-31031 January 1997 Application for Amends to Licenses DPR-70 & DPR-75, Requesting Rev to TS Re Containment Systems Air Temp to Ensure Representative Average Air Temp Is Measured ML18102A7861997-01-23023 January 1997 Application for Amend to License DPR-75,revising TS Bases 3/4.3.3.1 Re Radiation Monitoring Instrumentation Channel 2R41 ML18102A7361997-01-0707 January 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising Eighteen Month Surveillance Performed to Measure RCS Total Flow Rate to Account for Necessary Plant Conditions for Performing Test in Mode 1 & Current Extended Plant Outages 1999-08-25
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML18107A4991999-08-25025 August 1999 Application for Amends to Licenses DPR-70 & DPR-75,proposing to Authorize Licensee to Perform Single Cell Charging of Connected Cells in Operable Class 1E Batteries ML18107A5141999-08-25025 August 1999 Suppl to 971114 Application for Amends to Licenses DPR-70 & DPR-75,deleting Footnotes Added as one-time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Unit 2 ML18107A4631999-07-29029 July 1999 Application for Amends to Licenses DPR-70 & DPR-75,replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4581999-07-23023 July 1999 Application for Amends to Licenses DPR-70 & DPR-75 to Change TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4221999-07-0202 July 1999 Application for Amends to Licenses DPR-70 & DPR-75 to Relocate TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to Ufsar,Iaw GL 95-10 ML18107A3771999-06-10010 June 1999 Application for Amends to Licenses DPR-70 & DPR-75,modifying TS 3/4.6.1, Containment Integrity, by Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3571999-06-0404 June 1999 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57 Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New,Affiliated Nuclear Generating Company, PSEG Nuclear Llc.Proprietary Encls Withheld ML18107A2081999-04-14014 April 1999 Application for Amends to Licenses DPR-70 & DPR-75,revising TS 3/4.9.12, Fhvas, to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,Per NUREG-1431. Page 4 of 4 in Attachment 2 of Incoming Submittal Omitted ML18106B1571999-03-31031 March 1999 Suppl to 990115 Application for Amend to License DPR-70, Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0621999-02-0808 February 1999 Application for Amends to Licenses DPR-70 & DPR-75, Respectively.Proposed Amend Modifies ECCS Subsystems Surveillance Requirement 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0501999-02-0202 February 1999 Application for Amends to Licenses DPR-70 & DPR-75,revising Max Permissible Enrichment of Stored New Fuel Described in TS Section 5.6.1.1.Rept Entitled, Criticality Analysis of Salem Units 1 & 2 Fresh Fuel Racks, Encl ML18106B0221999-01-15015 January 1999 Application for Amend to License DPR-70,proposing one-time Changes to Certain Unit 1 TS Surveillance Requirements for Fuel Cycle 13,currently Scheduled to Begin on 990918 ML18106A9161998-10-12012 October 1998 Application for Amend to License DPR-75,requesting one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10.Basis for Requested Changes,Analysis Supporting No Significant Hazards Determination & Marked Up TS Pages,Encl ML18106A8921998-09-29029 September 1998 Application for Amends to Licenses DPR-72 & DPR-75,modifying TS 3/4.9.4 to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8761998-09-17017 September 1998 Application for Amends to Licenses DPR-70 & DPR-75,modifying TSs 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8351998-08-12012 August 1998 Application for Amends to Licenses DPR-70 & DPR-75,modifying TS for Containment Air Locks for Salem Units 1 & 2 ML18106A7911998-07-30030 July 1998 Application for Amends to Licenses DPR-70 & DPR-75,revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Following Phrase ML18106A4271998-03-26026 March 1998 Application for Amend to License DPR-70,changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A4221998-03-26026 March 1998 Application for Amends to Licenses DPR-70 & DPR-75, Respectively,Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A2521998-01-0808 January 1998 Supplemental Application for Amends to Licenses DPR-70 & DPR-75,respectively Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2111997-12-15015 December 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising TS to Adopt Option B of 10CFR50,App J,For Type B & C Testing & Modifying Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1941997-12-11011 December 1997 Application for Amend to License DPR-70,requesting one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6771997-11-14014 November 1997 Application for Amends to Licenses DPR-70 & DPR-75,providing TS Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6731997-11-14014 November 1997 Application for Amends to Licenses DPR-70 & DPR-75, Correcting Editorial & Administrative Errors in Ts,Which Existed Since Initial Issuance ML18102B6611997-11-0404 November 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising TS 3/4.8.1 Re EDG & Deleting SR 4.8.1.1.2.d.1,calling for Diesels to Be Subjected to Insp Based on Vendor Recommendations ML18102B6571997-11-0404 November 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6371997-10-29029 October 1997 Application for Amend to License DPR-75,revising TS 3/4.4.6, Steam Generators, Making One Time Change to Unit 2 SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6411997-10-29029 October 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising SR 4.8.1.1.2.d.2 Proposed in Util 960925 Submittal Re EDG Testing ML18102B6471997-10-24024 October 1997 Application for Amends to Licenses DPR-70 & DPR-75,modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6441997-10-24024 October 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6291997-10-21021 October 1997 Application for Amends to Licenses DPR-70 & DPR-75,extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers in Closed Position ML18102B6181997-10-14014 October 1997 Application for Amend to License DPR-70,modifying Pressure Isolation Valve Lco,Lco Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 ML18102B6061997-10-0606 October 1997 Application for Amend to License DPR-70,changing TS for LCOs 3.1.3.1, Movable Control Assemblies & 3.1.3.2.1, Position Indication Sys. ML18102B5551997-08-27027 August 1997 Application for Amends to Licenses DPR-70 & DPR-75,providing Revised TS Bases Pages for TS 3.7.3, CCW Sys, to State That CCW Pumps Required to Be Operable to Meet LCO ML18102B5281997-08-19019 August 1997 Application for Amend to License DPR-75,providing Addl Operational Flexibility to Allow Orderly Resumption of Startup & Preclude Unwarranted Power Transients at Plant Unit 2 ML18102B5321997-08-18018 August 1997 Application for Amend to License DPR-75,incorporating Plant Computer (P-250) Into TS Bases for Movable Control Assemblies ML18102B4871997-08-0101 August 1997 Application for Amends to Licenses DPR-70 & DPR-75,rewording TS Section 4.2.1 to State That Util Will Adhere to Section 7 Incidental Take Statement Approved by Natl Marine Fisheries Svc ML20148K0841997-06-0404 June 1997 Amends 194 & 177 to Licenses DPR-70 & DPR-75,respectively, Changing TSs 3.4.3 & 3.4.5, Relief Valves, to Ensure That Automatic Capability of PORVs to Relieve Pressure Is Maintained When Valves Are Isolated ML18102B3041997-05-14014 May 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising SR 4.7.6.1.d.1 to Indicate That Specified Acceptable Filter Dp Is to Be Measured Across Filter Housing & to Reflecting Filter Dp Acceptance Value of Greater than 2.70 Wg ML18102B2611997-05-0101 May 1997 Suppl Info to Util 970211 Application for Amends to Licenses DPR-70 & DPR-75,revising TS for Chilled Water Sys - Auxiliary Bldg Subsystem.Ref to Radiation Monitoring Signal Removed from Bases Section ML18102B2581997-05-0101 May 1997 Application for Amend to License DPR-75,revising TS Section 3/4.7.7 to Reflect Extended Allowed Outage Times & Creating New TS Section 3/4.7.11 to Address Importance of Switchgear & Penetration Area Ventilation Sys ML18102B0071997-04-30030 April 1997 Application for Amends to Licenses DPR-40,DPR-56,DPR-70 & DPR-75,requesting Consent of NRC for Indirect Transfer of Control of Interest in Plants That Will Occur Under Proposed Merger ML18102B2511997-04-28028 April 1997 Submits Suppl to 970131 & 0314 Applications for Amends to Licenses DPR-70 & DPR-75,revising TS on Pressurizer Power Operated Relief Valves.Suppl Issued to State That Conclusion of NSHC Remains Valid ML18102B0221997-04-25025 April 1997 Application for Amends to Licenses DPR-70 & DPR-75, Eliminating Flow Path from RHR Sys to RCS Hot Legs as Specified in LCO 3.5.2.c.2 ML18102A9791997-04-11011 April 1997 Application for Amends to Licenses DPR-70 & DPR-75, Increasing Cw Flow to 2550 Gpm for 31 Day Surveillance Fans Started & Operated in Low Speed ML18102A8951997-03-0404 March 1997 Application for Amends to Licenses DPR-70 & DPR-75,modifying ECCS Surveillance Test Acceptance Criteria for Centrifugal Charging & SI Pumps ML18102A8491997-02-11011 February 1997 Application for Amends to Licenses DPR-70 & DPR-75, Requesting Addition of New TS 3/4.7.10, Chilled Water Sys ML18102A8361997-01-31031 January 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising TS 3/4.4.3 to Ensure That Automatic Capability of Power Operated Relief Valve to Relieve Pressure Is Maintained When Valves Are Isolated by Closure of Block Valves ML18102A8021997-01-31031 January 1997 Application for Amends to Licenses DPR-70 & DPR-75, Requesting Rev to TS Re Containment Systems Air Temp to Ensure Representative Average Air Temp Is Measured ML18102A7861997-01-23023 January 1997 Application for Amend to License DPR-75,revising TS Bases 3/4.3.3.1 Re Radiation Monitoring Instrumentation Channel 2R41 1999-08-25
[Table view] |
Text
- Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-4800 Vice President - Nuclear Operations JAN 1 8 1991.
NLR-N90214 LCR 90-16 United states Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
LICENSE AMENDMENT APPLICATION EDUCTOR FLOW TESTING CLARIFICATION SALEM GENERATING STATION FACILITY OPERATING LICENSES DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 This letter submits an application for amendment to Appendix A of Facility Operating Licenses DPR-70 and DPR-75 for the Salem Generating Station Unit Nos. 1 and 2 and is being filed in accordance with the provisions of 10CFR50.90. This amendment application requests changes to Technical Specification (TS)
Surveillance Requirements 4.6.2.1.c.2 (Unit 1) and 4.6.2.1.d.2 (Unit 2). These surveillances specify requirements for flow rate testing of the spray additive system eductors. Specifically, the proposed changes would: 1) clarify the testing methodology associated with these surveillance requirements and 2) relocate the surveillance requirements from LCO 3.6.2.1 to LCO 3.6.2.2.
Attachment 1 contains a detailed description of the proposed changes along with our 10CFR50.92 analysis of significant hazards. Marked up TS pages showing the proposed changes are included as Attachment 2.
In accordance with 10CFR50.91(b) (1), a copy of this request has been sent to the State of New Jersey as indicated below. Upon NRC approval, please issue a License Amendment which will be effective upon issuance and shall be implemented within 60 days of issuance. This latitude permits appropriate procedural modifications necessary to implement the proposed changes.
ovl
'\ I
Document Control Desk 2 NLR-N90214 JAN 1 8 1991 Should you have any questions or comments on this transmittal, do not hesitate to contact us.
Sincerely, Affidavit Attachments (2)
C Mr. J. c. Stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector Mr. T. Martin, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625
COUNTY OF SALEM
- s. LaBruna, being duly sworn according to law deposes and says:
I am Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter dated JAN 1 8 1991 , concerning the Salem Generating Station, Unit Nos. 1 and 2, are true to the best of my knowledge, information and belief.
Subscribed and Sworn to before me this -1..B_ ft day of J M4/\B'f , 1991
.~ '* .* VALERIE MONIZ NOTARY PUBLIC OF NEW JERSEY My Commission expires on ~-M=--y~C_om_m_i_ss_lo_n_Ex--'-pi_re_s_M_a_r._2_e_,_1_99_3~~
- ATTACHMENT 1 PROPOSED CHANGES TO THE TECHNICAL SPECIFICATIONS LICENSE AMENDMENT APPLICATION EDUCTOR FLOW TESTING CLARIFICATION SALEM GENERATING STATION FACILITY OPERATING LICENSES DPR-70 AND DPR-75 NLR-N90214 DOCKET NOS. 50-272 AND 50-311 LCR 90-16 I. Description of Proposed Changes This amendment application is being submitted to clarify ambiguities contained within the existing Technical Specification (TS) surveillance requirements for the containment spray system.
Specifically, changes are being proposed to Surveillance Requirements 4.6.2.1.c.2 (Unit 1) and 4.6.2.1.d.2 (Unit 2).
These surveillances specify requirements for spray additive system eductor flow rate testing. The proposed changes: 1) provide clarification to the existing eductor flow test surveillance requirements and 2) move the surveillance requirements from LCO 3.6.2.1 to LCO 3.6.2.2. The proposed changes are described in further detail below.
A. Clarification for Existing Requirements Surveillance Requirements 4.6.2.1.c.2 (Unit 1) and 4.6.2.1.d.2 (Unit 2) require that the spray additive tank eductor flow rate be verified within specified limits (35 +/- 3.5 gpm) with the spray pumps operating in the recirculation mode. Questions have surfaced regarding the testing methodology to be employed in meeting the intent of this surveillance requirement.
There are two different testing methods which may be used to verify the specified eductor flow rate. The first method involves measuring the flow rate to the eductor while taking suction from the spray additive tank (SAT). This method provides the most direct means of verifying the flow rate but requires that sodium hydroxide (NaOH) be injected into the system. Injection of NaOH into the system is an extremely un.desirable
- action *in that . it would foul the system and require extensive clean up following testing.
Additionally, injecting NaOH into the system could result in spraying containment with NaOH if an equipment malfunction or operator error were to occur.
The second method uses a test line from the refueling water storage tank (RWST) which ties into the eductor line downstream of the SAT isolation valves. This test line allows the flow test to be performed using RWST water. The SAT remains isolated from the system and NaOH injection is precluded. Since there are elevation differences between Page 1 of 7 Eductor Flow Testing Clarification
- NLR-N90214 LCR 90-16 the SAT and RWST, the indicated flow rate during testing with the flow from the RWST (RWST at 41 +/- 0.5 feet) must be 57 gpm + 10% to ensure that the flow from the SAT would be 35 gpm +/- 10% from the SAT. This correlation is based on Westinghouse analysis. The validity of the correlation was verified during testing in December 1980. All parameters which could affect the results of the correlation are the same for both Units 1 and 2 and the correlation is therefore applicable for both units.
Initial flow rate verification was carried out during startup using the first test method with demineralized water in the SAT. Subsequent tests have been carried out using the second test method (i.e., the test line from the RWST).
We believe the second method provides an accurate means of verifying the required flow rate and intend to continue using this method to satisfy the surveillance requirement.
In order to avoid confusion and ambiguity, we are modifying the surveillance requirement to more precisely describe our testing methodology. The existing surveillance requirement would be replaced by the following.
"Verifying that the spray additive tank eductor flow will be 35 +/- 3.5 gpm to each containment spray system.
Testing may be performed by measuring the flow of borated water from the RWST through the installed 2 11 test line and Valve CS31; using this test line up with the spray pump operating in the recirculation mode and the RWST level at 41 feet +/- 0.5 feet, the measured flow shall be 57 gpm +/- 5.7 gpm."
B. Relocation of Surveillance Requirements We are proposing to move Surveillance Requirements 4.6.2.1.c.2 (Unit 1) and 4.6.2.1.d.2 (Unit 2) from LCO 3.6.2.1 to LCO 3.6.2.2. These surveillances specify requirements for flow rate testing of the spray additive system eductors. When the eductor flow testing is conducted using the test line, an additional test is necessary to verify that proper flow exists in the line between the SAT and the point at which the test line ties into the eductor supply line. This second test is included under Surveillance Requirement 4.6.2.2.d. It is inconsistent to have the two tests necessary for verifying adequate spray additive flow included under two separate LCOs. The subject tests are necessary to verify the operability of the spray additive function of the containment spray system, and we are therefore proposing to consolidate these tests under the LCO for the spray additive system.
Page 2 of 7
Attachment 1
- Eductor Flow Testing Clarification
- NLR-N90214 LCR 90-16 II. Reason for Proposed Changes A. Clarification for Existing Requirements The change to the eductor flow test surveillance requirement is intended to clarify the existing requirement and to eliminate the associated confusion and ambiguity. If the requirement were to be interpreted to require direct measurement of flow from the SAT, injection of NaOH into the system would be required. Such action would be extremely undesirable in that it would foul the system and require extensive cleanup following completion of the test.
Conducting testing by actually injecting NaOH into the system could also result in spraying containment with NaOH if an equipment malfunction or operator error were to occur.
B. Relocation of Surveillance Requirements Movement of the subject surveillance requirements from LCO 3.6.2.1 to LCO 3.6.2.2 consolidates all spray additive system eductor flow rate testing under a single LCO. The eductor testing supports operability of the spray additive system and more appropriately belongs as a requirement under LCO 3.6.2.2. This change also achieves consistency with the Westinghouse Standard TSs and the proposed MERITS TSs.
III. Justification for the Change A. Clarification for Existing Requirements
- The MERITS Bases for the eductor flow test surveillance requirement states that test water may be used instead of NaOH solution for the flow test to avoid fouling the system provided the differences in flow characteristics are taken into account. As noted earlier, we have completed an analysis to account for differences in flow characteristics.
This analysis was completed with the assistance of Westinghouse and considered the following flow characteristic differences:
- 1. The flow instrument used to measure eductor flow rate during testing is calibrated for NaOH. The density differences between water and NaOH were taken into consideration to obtain the corresponding flow for water.
- 2. since the RWST is used as the eductor suction source instead of the SAT, the elevation differences between the RWST and the SAT were taken into consideration.
Based on these considerations, an indicated flow rate of 57 gpm +/- 10% obtained using the test configuration will ensure adequate flow (35 +/- 3.5 gpm) from the SAT.
Page 3 of 7
Attachment 1
- Eductor Flow Testing Clarification
- NLR-N90214 LCR 90-16 The eductor flow testing was witnessed by the NRC in December 1980. The NRC inspector noted that the test was conducted using the RWST and a test line to provide a source of additive water to the eductor. The new acceptance criterion (57 +/- 5.7 gpm) was also noted along with the fact that the acceptability of the correlation was successfully demonstrated by repeating the test using the RWST as the additive water source and throttling the manual valve in the supply line to obtain equivalent SAT pressure at the eductor supply point. Refer to Inspection Report 50-272/80-32 and 50-311/80-22 dated January 21, 1981 for further details.
As evident from the above discussion, the existing test methodology has been accepted by the NRC, Westinghouse, and MERITS. Although the existing test method does not directly measure flow from the SAT to the eductor, the test configuration has been correlated to the actual configuration by accounting for differences in flow characteristics. The validity of the correlation has been verified through testing. As a result, we conclude that the existing test method provides an accurate means of verifying specified flow to the eductor as required by the TS surveillance requirement.
B. Relocation of Surveillance Requirements As specified in Section 6.2.2.1 of the UFSAR, the containment spray system functions to provide the following:
- 1. Capability to spray cool water into the containment atmosphere in the event of a LOCA thereby ensuring that containment pressure is maintained below its design limit.
- 2. Capability to remove elemental iodine from the containment atmosphere should it be released during a LOCA.
The TSs contain two separate LCOs intended to ensure that these capabilities are maintained. LCO 3.6.2.1 is intended to address the containment cooling function of the containment spray system while LCO 3.6.2.2 is intended to address the spray additive function of the system. The eductor flow rate surveillance requirements are intended to verify operability of the containment spray additive system, and as such, should be included as part of LCO 3.6.2.2.
The proposed relocation is consistent with the Westinghouse standard TSs and the proposed MERITS TSs. The action statements for LCO 3.6.2.1 and LCO 3.6.2.2 are identical, and as a result, actions required due to failure to meet the flow test requirements remain the same.
Page 4 of 7 Eductor Flow Testing Clarification NLR-N90214 LCR 90-16 IV. Significant Hazards Consideration Evaluation The proposed changes to the Salem Generating Station Technical Specifications:
- 1. Do not involve a significant increase in the probability or consequences of an accident previously evaluated.
A. Clarification for Existing Requirements Our analysis *of both offsite and control room doses following a LOCA take credit for iodine removal by the containment spray system. The io.dine removal capability of the spray system is dependent on maintaining a sufficiently high pH in the containment spray water through the use of NaOH injection. Injection of 35 gpm +/- 10% through the eductors from the SAT maintains the post accident injection spray pH within a range which will ensure* the capability of the spray to remove iodine from the containment atmosphere and limit offsite and control room doses to within 10 CFR Part 100 limits. Differences in flow characteristics between the test configuration and the actual configuration have been considered, and the test specified in the proposed surveillance requirement will adequately verify that the actual flow rate is within the specified limits. Since the proposed test maintains our ability to verify that the accident analysis assumptions are being met, the proposed change will not increase the probability or consequences of a previously analyzed accident.
B. Relocation of Surveillance Requirements Moving Surveillance Requirements 4.6.2.1.c.2 (Unit 1) and 4.6.2.1.d.2 (Unit 2) from LCO 3.6.2.1 to LCO 3.6.2.2 consolidates the spray additive eductor testing under a single LCO. These surveillance requirements are intended to verify operability of the eductors, and since the eductors are part of the spray additive system, these surveillances should be included as part of the LCO for the spray additive system. The action statements for LCOs 3.6.2.1 and 3.6.2.2 are identical, and as a result, actions required due to failure to meet the flow test requirements remain the same.
Based on the above information, the proposed change will not increase the probability or consequences of a previously analyzed accident.
Page 5 of 7
Attachment 1 Eductor Flow Testing Clarification
- 2. Do not create the possibility of a new or different kind of accident from any accident previously evaluated.
A. Clarification for Existing Requirements The proposed change requires no procedure or plant modifications, does not alter the function of any of the affected systems, and involves no new modes of plant operation. As such, the change will not create the possibility of a new or different kind of accident from any accident previously evaluated.
B. Relocation of Surveillance Requirements The proposed change requires no procedure or plant modifications, does not alter the function of any of the affected systems, and involves no new modes of plant operation. As such, the change will not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Do not involve a significant reduction in a margin of safety.
A. Clarification for Existing Requirements The existing test method provides an adequate means of verifying specified flow to the eductor as required by the TS surveillance requirement. The surveillance tests still require that we verify that the limits assumed in the accident analysis are being maintained. No changes to safety limits or margins of safety are created as a result of this change. As such, the proposed change will not reduce a margin of safety.
B. Relocation of Surveillance Requirements This change moves a surveillance requirement from one LCO to another. This relocation consolidates all spray additive eductor testing under a single LCO and places the subject surveillance requirement with the LCO for the system for which it was intended. This change will not affect actions required as a result of failure to meet the surveillance requirement. No changes to safety limits or margins of safety are created as a result of this change.
As such, the proposed change will not reduce a margin of safety.
Page 6 of 7 Eductor Flow Testing Clarification
- v. Conclusion As discussed above, PSE&G has concluded that the proposed changes to the Technical Specifications do not involve a significant hazards consideration since the changes: (i) do not involve a significant increase in the probability or consequences of an accident previously evaluated, (ii) do not create the possibility of a new or different kind of accident from any accident previously evaluated, and (iii) do not involve a significant reduction in a margin of safety.
Page 7 of 7