ML18095A717

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Cycle 10 Radial Peaking Factor Limit Rept, Per Tech Spec 6.9.1.9.Rept Withheld
ML18095A717
Person / Time
Site: Salem PSEG icon.png
Issue date: 01/29/1991
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18095A719 List:
References
NLR-N91019, NUDOCS 9102060016
Download: ML18095A717 (2)


Text

.~

I

  • Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hailcocks Bridge, NJ 08038 609-339-4800 Vice President - Nuclear Operations JAN 2 9 1991 NLR-N91019 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

CYCLE 10 RADIAL PEAKING FACTOR LIMIT REPORT SALEM GENERATING STATION UNIT NO. 1 DOCKET NO. 50-272 Public Service Electric and Gas Company (PSE&G) hereby submits the subject report for Salem Unit 1, in accordance with Technical Specification Section 6.9.1.9.

This report was prepared by Westinghouse Corporation in accordance with the Westinghouse Methodology, "Power Distribution Control and Load Following Procedures", WCAP-8385, September 1974.

PSE&G has reviewed this report and concurs with the results.

Should you have any questions regarding this transmittal, please do not hesitate to contact us.

Sincerely, Attachment

~fo\\

\\'- '\\

  • C" Document Control Desk
  • NLR-N91019 c

Mr. J. c. Stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector Mr. T. Martin, Administrator Region I Mr. Kent Tosch, Chief 2

New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 JAN 2 9 1991.