Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18093B053 + (ML18093B053)
- PNO-I-88-091, on 880831,Unit 1 Tripped from Full Power as Result of Main Turbine Trip.Cause Unknown.Unit 2 Tripped from Full Power Due to High Steam Generator (SG) Level Resulting from SG Feed Regulating Valve Failing Open + (ML18093B055)
- ML18093B056 + (ML18093B056)
- ML18093B057 + (ML18093B057)
- ML18093B058 + (ML18093B058)
- 05000272/LER-1988-013-02, :on 880812,several Penetration Seals Did Not Conform to Correct Color or Cell Structure as Recommended by Silicone Foam Mfg to Provide Necessary Fire Protection. Caused by Inadequate Procedural Guidance + (ML18093B060)
- RAIO-0418-59373, LLC Supplemental Response to NRC Request for Additional Information No. 110 (Erai No. 8932) on the NuScale Design Certification Application + (ML18093B061)
- ML18093B062 + (ML18093B062)
- ML18093B063 + (ML18093B063)
- ML18093B064 + (ML18093B064)
- ML18093B065 + (ML18093B065)
- ML18093B066 + (ML18093B066)
- ML18093B067 + (ML18093B067)
- ML18093B072 + (ML18093B072)
- ML18093B076 + (ML18093B076)
- ML18093B078 + (ML18093B078)
- DT-19-15, Management Directive 8.4, Management of Backfitting, Forward Fitting, Issue Finality, and Information Requests + (ML18093B087)
- Press Release-II-18-006, NRC to Hold Open House to Discuss 2017 Performance of Farley Nuclear Power Plant + (ML18093B091)
- Press Release-I-18-007, NRC to Hold Open House to Discuss 2017 Performance of the Oyster Creek Nuclear Power Plant + (ML18093B092)
- Press Release-III-18-012, NRC to Conduct Open House to Discuss 2017 Performance of Point Beach Nuclear Power Plant + (ML18093B094)
- Press Release-III-18-013, NRC Names New Senior Resident Inspector at Perry Nuclear Power Plant + (ML18093B095)
- ML18093B097 + (ML18093B097)
- ML18093B102 + (ML18093B102)
- ML18093B106 + (ML18093B106)
- ML18093B145 + (ML18093B145)
- ML18093B146 + (ML18093B146)
- ML18093B148 + (ML18093B148)
- ML18093B149 + (ML18093B149)
- ML18093B151 + (ML18093B151)
- ML18093B152 + (ML18093B152)
- ML18093B153 + (ML18093B153)
- ML18093B154 + (ML18093B154)
- ML18093B158 + (ML18093B158)
- ML18093B161 + (ML18093B161)
- IR 05000272/1988016 + (ML18093B162)
- ML18093B163 + (ML18093B163)
- ML18093B167 + (ML18093B167)
- ML18093B168 + (ML18093B168)
- ML18093B169 + (ML18093B169)
- ML18093B171 + (ML18093B171)
- ML18093B172 + (ML18093B172)
- 05000311/LER-1988-017-01, :on 880831,reactor Trip Occurred After Turbine Trip as Result of Steam Generator hi-hi Level.Caused by Design/Equipment Problem Associated w/23BF19 Valve.Maint Requirements Will Be Modified + (ML18093B174)
- ML18093B176 + (ML18093B176)
- ML18093B178 + (ML18093B178)
- ML18093B180 + (ML18093B180)
- 05000272/LER-1988-014-01, :on 880830,QA Review Identified Several Missed Fire Barrier Penetration Surveillances.Caused by Inadequate Administrative Controls.Work Schedule Reviewed Monthly by Site Protection Supervisor + (ML18093B181)
- 05000272/LER-1988-015-02, :on 880831,reactor/turbine Trip Occurred Due to Low Auto Stop Oil Sys Pressure.Caused by Equipment Problem. Functional Testing of Various Turbine Trip Mechanisms Completed Satisfactorily + (ML18093B182)
- ML18093B183 + (ML18093B183)
- ML18093B184 + (ML18093B184)
- ML18093B186 + (ML18093B186)
- ML18093B187 + (ML18093B187)