Docket Nos.
50-272
50-311
Public
ATTN:
P. 0.
Service Electric and Gas
Mr. S. E. Miltenberger
Vice President and
Chief Nuclear Officer
Box 236
Company
Hancocks Bridge, New Jersey 08038
Gentlemen:
SUBJECT:
REQUALIFICATION PROGRAM EVALUATION
REPORT NOS. 50-272/88-07(0L) and 50-311/88-07(0L)
During the week of June 13, 1988, the NRC conducted a requalification program
evaluation at the
Salem
Nuclear Generating Station.
The evaluation was
conducted
in
accordance with draft
Revision
5
to
Operator
Licensing Examiner Standards, ES-601,
11Admi n i strati on of NRC Requa l i fi cation
Program Evaluations.
11
The evaluation had two purposes:
(1) evaluation of the
effectiveness of the licensed operator requalification training program at
Salem to determine if the program mai.ntained the competency of the operators,
.and (2) examination of individual operators to determine if they would satisfy
the regulat6ry requirement of passing an NRC administered examination prior to
At the conclusion of the evaluation, generic findings that
evolved were discussed with those members of your staff identified in the
enclosed report.
As a result of this evaluation, your requalification program has been assigned
an overall rating of satisfactory.
One of the reactor operators failed the
simulator portion of the operating examination and all operators passed the
written examination.
These evaluations were made
in accordance with the
criteria established in the above mentioned draft.of NUREG-1021, ES-601.
In a letter from you to the NRC, dated July 1, 1988, the results of the grading
by the Salem staff were presented.
Per your staff's grading, the same reactor
operator (as failed by the NRC) failed the simulator portion of the operating
examination. Also, one senior reactor operator failed the written examination
due to a slightly more conservative grading by the facility.
8809190140 880901
ADOCK 05000272
V
PNU
OFFICIAL RECORD COPY
IR SALEM 88-07 - 0001.0.0
08/30/88
Public Service Electric
and Gas Company
2
Your attention is directed to paragraphs 2.3 and 2.2 with respect to two
requalification program deficiencies.
Briefly, (1) the guidance given by the
Salem Operations .Department for implementation of the Emergency Operating
Procedures is not consistent with the guidance contained in the Westinghouse
Owner's Group background documents; (2) the requalification training program
does not include training on the ability to operate the in-plant portion of the
auxiliary and emergency systems other than the remote shutdown panel, which is
not consistent with 10 CFR 55.59(a)(2)(ii).
You are requested to respond to
these concerns within thirty days of the date of *this letter.
The
response requested by this 1 etter and the accompanying Nati ce is not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
In accordance with 10 CFR 2.190 of the Commission 1 s regulations, a copy of this
letter and the enclosure will be placed in the NRC Public Document Room.
Should you
have
any
questions regarding this evaluation, please contact
Mr. R. M. Gallo, Chief, Operations Branch at 215/337-5291.
Sincerely,
0::"'1.,L*91!l !1.~ 9'1
- t. ~rt in
Thomas T. Martin, Director
Division of Reactor Safety
Enclosure:
Requalification Examination Report Nos. 50-272/88-07(0L) and
50~311/88-07(0L), w/Attachments 1, 2, 3, 4, and 5
cc w/enclosure and attachments 1, 2, 3, 4 and 5:
~Jack Urban, General Manager,
Fuels Department, Delmarva Power & Light Co.
J. M. Zupko, Jr., General Manager - Salem Operations
. ~B. A. Preston, Manager, Licensing and Regulation
~General Manager - Nuclear Safety Review
"--- M. J. Wetterhahn, Esquire
-
R. Fryling, Jr., Esquire
__,.-Scott B. Ungerer, Manager, Joint Generation Projects Department,
Atlantic Electric Company
Licensing Project Manager, NRR
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
OFFICIAL RECORD COPY *
IR SALEM 88-07 - 0001.0.1
11/29/80
Public Service Electric
and Gas Company
3
bee w/enclosure without attachments 1, 2, 3, 4 and 5
R. M. Gallo, DRS Branch Chief
P. W. Eselgroth, DRS Section Chief
P. D. Swetland, DRP Section Chief
R. R. Temps, Examiner
N. F. Dudley, Examiner
L. E. Briggs, Examiner
P. H. Bissett, Examiner
D. M. Silk, Examiner
J. H. Moorman, Examiner (RII)
Chief, OLB DLPQE, NRR
Region I Docket Room Cw/concurrences)
OL File
Master Exam File (WITH ALL ATTACHMENTS)
B. S. Norris, Chief Examiner
Robert J. Bores, DRSS
B. Clayton, EDO
Management Assistant, DRMA (w/o encl)
RI:DRSt
Norris
08/1 b/8
~end
081/f> /88
- '&/24
'?"L
081/[al88
OFFICIAL RECORD COPY
Roe
~ \\;ss
RI:DRS
R ~
Johnston rlA~~L _r/
3J31/lfo
- 08//rf/88
IR SALEM 88-07 - 0001.1.0
08/16/88