Forwards Requalification Exam Repts 50-272/88-07OL & 50-311/88-07OL of Exam Conducted During Wk of 880613. Requalification Program Deficiencies Noted
ML18093B146
Person / Time
Site: Salem  
Issue date: 09/01/1988
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Miltenberger S
Public Service Enterprise Group
Shared Package
ML18093B147 List:
References
NUDOCS 8809190140
Download: ML18093B146 (3)


See also: IR 05000272/1988007

Text

Docket Nos.

50-272

50-311

Public

ATTN:

P. 0.

Service Electric and Gas

Mr. S. E. Miltenberger

Vice President and

Chief Nuclear Officer

Box 236

Company

Hancocks Bridge, New Jersey 08038

Gentlemen:

SUBJECT:

REQUALIFICATION PROGRAM EVALUATION

REPORT NOS. 50-272/88-07(0L) and 50-311/88-07(0L)

During the week of June 13, 1988, the NRC conducted a requalification program

evaluation at the

Salem

Nuclear Generating Station.

The evaluation was

conducted

in

accordance with draft

Revision

5

to

NUREG-1021,

Operator

Licensing Examiner Standards, ES-601,

11Admi n i strati on of NRC Requa l i fi cation

Program Evaluations.

11

The evaluation had two purposes:

(1) evaluation of the

effectiveness of the licensed operator requalification training program at

Salem to determine if the program mai.ntained the competency of the operators,

.and (2) examination of individual operators to determine if they would satisfy

the regulat6ry requirement of passing an NRC administered examination prior to

license renewal.

At the conclusion of the evaluation, generic findings that

evolved were discussed with those members of your staff identified in the

enclosed report.

As a result of this evaluation, your requalification program has been assigned

an overall rating of satisfactory.

One of the reactor operators failed the

simulator portion of the operating examination and all operators passed the

written examination.

These evaluations were made

in accordance with the

criteria established in the above mentioned draft.of NUREG-1021, ES-601.

In a letter from you to the NRC, dated July 1, 1988, the results of the grading

by the Salem staff were presented.

Per your staff's grading, the same reactor

operator (as failed by the NRC) failed the simulator portion of the operating

examination. Also, one senior reactor operator failed the written examination

due to a slightly more conservative grading by the facility.

8809190140 880901

PDR

ADOCK 05000272

V

PNU

OFFICIAL RECORD COPY

IR SALEM 88-07 - 0001.0.0

08/30/88

Public Service Electric

and Gas Company

2

Your attention is directed to paragraphs 2.3 and 2.2 with respect to two

requalification program deficiencies.

Briefly, (1) the guidance given by the

Salem Operations .Department for implementation of the Emergency Operating

Procedures is not consistent with the guidance contained in the Westinghouse

Owner's Group background documents; (2) the requalification training program

does not include training on the ability to operate the in-plant portion of the

auxiliary and emergency systems other than the remote shutdown panel, which is

not consistent with 10 CFR 55.59(a)(2)(ii).

You are requested to respond to

these concerns within thirty days of the date of *this letter.

The

response requested by this 1 etter and the accompanying Nati ce is not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

In accordance with 10 CFR 2.190 of the Commission 1 s regulations, a copy of this

letter and the enclosure will be placed in the NRC Public Document Room.

Should you

have

any

questions regarding this evaluation, please contact

Mr. R. M. Gallo, Chief, Operations Branch at 215/337-5291.

Sincerely,

0::"'1.,L*91!l !1.~ 9'1

      • t. ~rt in

Thomas T. Martin, Director

Division of Reactor Safety

Enclosure:

Requalification Examination Report Nos. 50-272/88-07(0L) and

50~311/88-07(0L), w/Attachments 1, 2, 3, 4, and 5

cc w/enclosure and attachments 1, 2, 3, 4 and 5:

~Jack Urban, General Manager,

Fuels Department, Delmarva Power & Light Co.

J. M. Zupko, Jr., General Manager - Salem Operations

. ~B. A. Preston, Manager, Licensing and Regulation

~General Manager - Nuclear Safety Review

"--- M. J. Wetterhahn, Esquire

-

R. Fryling, Jr., Esquire

__,.-Scott B. Ungerer, Manager, Joint Generation Projects Department,

Atlantic Electric Company

Licensing Project Manager, NRR

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

OFFICIAL RECORD COPY *

IR SALEM 88-07 - 0001.0.1

11/29/80

Public Service Electric

and Gas Company

3

bee w/enclosure without attachments 1, 2, 3, 4 and 5

R. M. Gallo, DRS Branch Chief

P. W. Eselgroth, DRS Section Chief

P. D. Swetland, DRP Section Chief

R. R. Temps, Examiner

N. F. Dudley, Examiner

L. E. Briggs, Examiner

P. H. Bissett, Examiner

D. M. Silk, Examiner

J. H. Moorman, Examiner (RII)

Chief, OLB DLPQE, NRR

Region I Docket Room Cw/concurrences)

OL File

Master Exam File (WITH ALL ATTACHMENTS)

B. S. Norris, Chief Examiner

Robert J. Bores, DRSS

B. Clayton, EDO

Management Assistant, DRMA (w/o encl)

RI:DRSt

Norris

08/1 b/8

~end

081/f> /88

  • '&/24

'?"L

081/[al88

OFFICIAL RECORD COPY

Roe

~ \\;ss

RI:DRS

R ~

Johnston rlA~~L _r/

3J31/lfo

  • 08//rf/88

IR SALEM 88-07 - 0001.1.0

08/16/88