Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18081B105 + (ML18081B105)
- ML18081B106 + (ML18081B106)
- ML18081B107 + (ML18081B107)
- ML18081B108 + (ML18081B108)
- ML18081B109 + (ML18081B109)
- ML18081B114 + (ML18081B114)
- 05000272/LER-1979-077, Supplemental LER 79-077/03X-1:on 791224,during Startup operations,11ASD Breaker tripped,de-energizing 1A 4 Kv Vital Bus & Supplied Plant Loads.Caused by Failed Components. Logic Drawer & Relay Replaced + (ML18081B115)
- 05000272/LER-1980-006, Forwards LER 80-006/03L-0 + (ML18081B117)
- ML18081B118 + (ML18081B118)
- 05000272/LER-1980-006-03, /03L-0:on 800123,power Was Lost to Meteorological Tower Instruments.Caused by Faulty Backup Power Inverter. Inverter Does Not Have Automatic Transfer Switch as Originally Designed + (ML18081B119)
- ML18081B120 + (ML18081B120)
- ML18081B123 + (ML18081B123)
- ML18081B124 + (ML18081B124)
- ML18081B126 + (ML18081B126)
- ML18081B127 + (ML18081B127)
- ML18081B128 + (ML18081B128)
- ML18081B130 + (ML18081B130)
- ML18081B131 + (ML18081B131)
- ML18081B132 + (ML18081B132)
- ML18081B133 + (ML18081B133)
- ML18081B134 + (ML18081B134)
- ML18081B135 + (ML18081B135)
- ML18081B138 + (ML18081B138)
- ML18081B139 + (ML18081B139)
- ML18081B140 + (ML18081B140)
- IR 05000272/1979029 + (ML18081B141)
- ML18081B144 + (ML18081B144)
- IR 05000272/1979028 + (ML18081B146)
- ML18081B149 + (ML18081B149)
- 05000272/LER-1980-003, Forwards LER 80-003/03L-0 + (ML18081B150)
- ML18081B151 + (ML18081B151)
- 05000272/LER-1980-011, Forwards LER 80-011/03L-0 + (ML18081B152)
- ML18081B153 + (ML18081B153)
- 05000272/LER-1980-011-03, /03L-0:on 800212,during Air Lock Leakage Test, Found Leakage Above Tech Spec Limit.Caused by Gasket Being Jarred from Seating Channel.Gasket & Seating Surface Cleaned.Gasket Reinstalled + (ML18081B154)
- 05000272/LER-1980-012, Forwards LER 80-012/03L-0 + (ML18081B155)
- ML18081B156 + (ML18081B156)
- 05000272/LER-1980-012-03, /03L-0:on 800205,air Particulate Detector Was Declared Inoperable When Shear Pins & Microswitch Failed. Caused by Normal Degradation of Pins & Probable Bump of Switch by Personnel.Pins Replaced & Switch Repaired + (ML18081B157)
- 05000272/LER-1980-010, Forwards LER 80-010/03L-0 + (ML18081B158)
- ML18081B159 + (ML18081B159)
- 05000272/LER-1980-010-03, /03L-0:on 800206,while Reviewing Procedure,Found That,During Load Test on Manipulator Crane Prior to Fuel Movement on 790425,test of 3,220 Lbs Performed Instead of 3,250 Lbs Per Tech Spec.Procedure Will Be Revised + (ML18081B160)
- ML18081B161 + (ML18081B161)
- ML18081B162 + (ML18081B162)
- ML18081B163 + (ML18081B163)
- ML18081B164 + (ML18081B164)
- ML18081B170 + (ML18081B170)
- ML18081B171 + (ML18081B171)
- ML18081B172 + (ML18081B172)
- ML18081B174 + (ML18081B174)
- DCL-18-021, Core Operating Limits Report for Unit 2 Cycle 21 + (ML18081B175)
- ML18081B176 + (ML18081B176)
- ML18081B177 + (ML18081B177)