- ML18058A370 + (ML18058A370)
- 05000255/LER-1992-023, :on 920327,discovered That Previously Unidentified Junction Boxes in Electrical Circuits Contained Environmentally Unqualified Connections.Caused by Design Failure.Terminal Blocks to Be Replaced + (ML18058A371)
- ML18058A372 + (ML18058A372)
- 05000255/LER-1991-014, :on 910709,discovered That Safety Related Circuits Routed W/Opposite Channel Circuits.Caused by non-uniform Interpretation of Design Criteria for Routing Circuits.Plan Developed to Address Issues + (ML18058A380)
- 05000255/LER-1992-024, :on 920327,inadvertent Opening of Station Power Breaker Resulting in ESF Actuation & Interruption of Shutdown Cooling.Caused by Supervisor Allowing Work to Proceed on C Bus.Event Discussed W/Maint + (ML18058A381)
- ML18058A382 + (ML18058A382)
- ML18058A383 + (ML18058A383)
- ML18058A385 + (ML18058A385)
- ML18058A386 + (ML18058A386)
- 05000255/LER-1992-027, :on 920401,wire Cage Door on 625-ft Elevation in Containment Found Closed But Wire Cut So That Person Could Have Reached Through to Unlock Door.Possibly Caused by Vandalism.Door Secured by Steel Plate + (ML18058A387)
- ML18058A388 + (ML18058A388)
- 05000255/LER-1992-026, :on 920331,discovered That During LOCA, Concurrent W/Loss of Offsite Power,Overcurrent Trip of EDG 1-1 Could Occur.Caused by Oversight in Original Plant Design.Time Delay Relay Installed + (ML18058A389)
- ML18058A390 + (ML18058A390)
- 05000255/LER-1992-025, :on 920331,determined That Longitudinal Welds on 36-inch Main Steam Line Piping Not Included in Inservice Insp Program.Caused by Personnel Error.All Welds Inspected Using Volumetric/Surface Methods + (ML18058A391)
- ML18058A392 + (ML18058A392)
- ML18058A393 + (ML18058A393)
- ML18058A394 + (ML18058A394)
- ML18058A395 + (ML18058A395)
- ML18058A398 + (ML18058A398)
- ML18058A399 + (ML18058A399)
- ML18058A400 + (ML18058A400)
- ML18058A401 + (ML18058A401)
- ML18058A402 + (ML18058A402)
- ML18058A403 + (ML18058A403)
- ML18058A404 + (ML18058A404)
- ML18058A405 + (ML18058A405)
- ML18058A406 + (ML18058A406)
- ML18058A407 + (ML18058A407)
- ML18058A408 + (ML18058A408)
- ML18058A410 + (ML18058A410)
- 05000255/LER-1992-029, :on 920404,inadvertent Actuation of Left Channel Sequencer Occurred.Caused by Failure to Follow Test Procedure.Importance of Incident Was Discussed W/All Shifts on Rotation + (ML18058A411)
- ML18058A413 + (ML18058A413)
- ML18058A416 + (ML18058A416)
- ML18058A417 + (ML18058A417)
- RA-18-000, Duke - Submittal of Evidence of 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums + (ML18058A417)
- RA-18-0003, Duke - Submittal of Evidence of 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums + (ML18058A417)
- ML18058A418 + (ML18058A418)
- ML18058A420 + (ML18058A420)
- ML18058A422 + (ML18058A422)
- ML18058A423 + (ML18058A423)
- ML18058A425 + (ML18058A425)
- 05000255/LER-1992-032, :on 920406,unplanned Actuation of Right Channel of Safety Injection Sys Relays Occurred.Caused by Inadequate Procedure.Instructions & Steps Added to TSs Surveillance Procedures + (ML18058A426)
- 05000255/LER-1992-030, :on 920403,inadvertent Start of Both Diesel Generators Occurred.Caused by Electrical Discontinuity in Contacts.Fuse Panels for Both 2400 Volt Engineered Safeguard Buses Were Inspected + (ML18058A428)
- ML18058A429 + (ML18058A429)
- IR 05000255/1992017 + (ML18058A430)
- ML18058A433 + (ML18058A433)
- PMNS20180144, Discussion on the Fuel Oil Chemistry Related to the River Bend License Renewal Application + (ML18058A435)
- ML18058A436 + (ML18058A436)
- IR 05000255/1992015 + (ML18058A439)
- ML18058A447 + (ML18058A447)
- ML18058A448 + (ML18058A448)