Text
.,
consumers Power.
POWERINli MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 May 6, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisad~s Nuclear Plant for the month of April, 1992.
If you have any tju~stions or concerris, pleise feel free to contact me at (616) 764-8913, extension 0113.
Sincerely,*
MG Mlynarek Reactor Engineer CC:
DPHoffman, P26-117B RMRice, Palisades ABDavis, USNRC JLKuemin, Palisades Resident lnSpe~tor, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan De~t of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Re~ords Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades MALapinski, Pl3-104
- Administrator, USNRC Document Control, 950*22*35*10/L SMH92*14 15000-9*
)
9205150012 920430 PDR ADOCK 05000255 R
\\
I, Ac.MS' ENERGY COMPANY JP1
'{/
OPERATING STATUS:
- 1.
UNIT NAME
- 2.
REPORTING PERIOO:
- 3.
LICENSED THERMAL POWER CMWt)
- 4.
NAMEPLATE RATING (GROSS MWe)
- 5.
DESIGN ELECTRICAL RATING CNET MWe)
- 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
- 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
OPERATING DATA REPORT Palisades 920301-920331 2530.0 811. 7 805.0
- 770
- 730
- 8.
IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT, GIVE REASONS:
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY CNET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
- 11. HOURS IN REPORTING PERIOO
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED CMWH)
- 17. GROSS ELECTRICAL ENERGY GENERATED CMWH)
- 18. NET ELECTRICAL ENERGY GENERATED CMWH)
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NET)
- 23. UNIT FORCED OUTAGE RATE This Month Yr-to-Date 719.0 2903.0 400.4 1287.7 293.1 1180.4 620112.0 2845224.0 204310.0 936350.0 192281.0 889130.0 40.8X 40.7X 40.8X 40.7X 36.6X 42.0X 33.2X 38.0X o.ox 1.1X
- 24. SHUTDOWNS SCHEDULED OVER.THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOO, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
DOCKET NO DATE 5D-255 4-3D-92 COMPLETED BY
- SMHandlovits TELEPHONE (616)764-8913 NOTES:
Cl.llUlative 178526.0 98334.3 94091.9 199499837.0 62715075.0 59061138. 0 52.7X 52.7X 49.8X*
41.1X 31.1X Achieved
AVERAGE DAILY UNIT POWER LEVEL MONTH APRIL 1992 DAY AVERAGE DAILY POWER LEVEL (MWe Net)
- 1.
0
- 2.
0
- 3.
0
- 4.
0
- 5.
0
- 6.
0
- 7.
. 0
- 8.
0
- 9.
0
- 10.
0
- 11.
0
- 12.
0
- 13.
0
- 14.
0
- 15.
0
- 16.
0 INSTRUCTIONS:
DAY
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
23..
- 24.
- 25.
- 26.
- 27.
- 28.
- 29.
- 30.
DOCK ET NO __
=-:50=--=2 5~5 UNIT Palisades DATE ----=0=5"-'/
0~6'--'/ 9=-=2 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 0 28
. 67 192
.. 548 748 801 804 804 804 804
. 805
. 802 804 On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
- ~.- '
- t.
SUMMARY
OF OPERATING EXPERIENCE FOR MARCH 1992 The p 1 ant began the month shutdown for refue 1 i ng.
The reactor went crit i ca 1 for the first time in Cycle 10 on April 14 at 0736 hours0.00852 days <br />0.204 hours <br />0.00122 weeks <br />2.80048e-4 months <br /> and was placed online April 18 at 1118 hours0.0129 days <br />0.311 hours <br />0.00185 weeks <br />4.25399e-4 months <br />.
The unit was taken offline April 18 at 2218 hours0.0257 days <br />0.616 hours <br />0.00367 weeks <br />8.43949e-4 months <br /> for turbine overspeed trip testing and to repair an airline leak on an MSIV.
The unit was returned online April 19 at 0554 hours0.00641 days <br />0.154 hours <br />9.160053e-4 weeks <br />2.10797e-4 months <br /> and proceeded with testing of the new turbine control system.
The turbine testing was performed a~ several different power levels as the plant escalated in power.
Full power was reached by April 22 at 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> and remained at 100% power for the remainder of the month.