ML18058A386

From kanterella
Jump to navigation Jump to search
Advises That Enforcement Conference Scheduled for 920501 in Glen Ellyn,Il to Discuss Apparent Failure to Take Prompt Corrective Action in Response to Environ Qualification Discrepancies
ML18058A386
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/27/1992
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
EA-92-074, EA-92-74, NUDOCS 9205040088
Download: ML18058A386 (4)


Text

Docket'No. 50-25~

. EA 92-074 Consumers Power Company ATTN:

Gerald B. Slade

  • Gen~ral Manager Pal.isades Nuclear Generating-Plant 27780 Blue Star Memorial Highway Covert~ MI 49043

Dear*Mr. Slade:

APR Thii ~otice cohfirms the dfscussion between Mr.'.P. M.. Donnelly of yout staff and Mr. M*. A. Ring of this office regarding. arrangements for an enforcement

~onference between members of our respective organizations. This tonf~rence

.is scheduled for Friday, May 1, 1992, at 10 a.m~ (CDT), at the NRC Region III office at* 799 Roosevelt Road, Building 4', Glen Ellyn, Ulin~is._

The. purpose of this conference is to discuss the ci~cumstances surr6undihg:

( 1) your appa_rent failure to take prompt corrective actions in response -to

  • environmental qualificatioh discrepancies ideht1fied in a ctintr~ctor report;

-and (2) apparently incomplete information asso~iat~d-~ith your request for a

P]~ase be prepared to discuss at the enforcement conference in both your oral presentation and in a. concise written handout the. topics listed in the enclosure*to this letter.

. We will gladly discuss any questions you may have. regar_ding this matter;

Enclosure:

A~ Stated

. Se~ Attached Distributi6n Riii RI II Bywater/dp Jorgensen 9 ?0'5040088 920427.

PBR ADOC~ 0500~~R5*

Q

~-*-*~---

~-

-~---

-~ - *-....

Edward G. Greenman, Director Division of React6r Proj~cts (see attached _concurrence)

Riii Riii Riii Ring PedersoD Shafer Riii

  • Riii.

Miller r~e~n.

l._1)q1.

c<'*.

~td-J.

~ '(( ~-~

  • . i Docket No; ~0~2ss EA 92-074 Consumer.s Power Company ATTN:

Gerald B. Slade 1

General Manager.

Pali sades Nuc:l ear.,Generatfog.;Plant 27780 Blue Star Memorial Highway

  • Covert, MI 49043

Dear*Mr. Slade:

Thi.s notice c.onfir_nis the discussion b~twe.en Mr:. P., M. Donneily of your staff.

. and Mr, M. A. Ring. of this office regarding arrangements for ari enforcement conference between members* _df our respective. organi z'at ions.

This conference.

    • is sch~duled for F~iday, *May l, 19n, at 10 a.m. (CDT).; at the NRC Region Ill offi~e at.799.. Roo~evelt..Rpad/_B~ilding *4, Glen.Ellyn, Illinois..
  • The putpose of this *conferen.ce* is t~ discuss the *circtims'tances surrounding*:

(1) your apparent *failure to take* prompt co.rrective. actions in.response to environmental q~alification dj~crepancies ideritified in a contractor report;

.. *and* (2) potential inaccur*ate information associated wi-th_ your tetjUe$t for a:.

. : temporary waiver *of. compl lance for.the inoperable main steam i so.lat ion valves.

  • Please. be prepared td disc~ss*at the enforcement ~orife~ence in both. your.oral
  • .Presentatjon and in a ~oncise-~~itten handout the topi~s listed in the*

enclosure* to t_h_i s 1 etter.

We will.gladly.~li,scu~_s_:-any qu'es_tions y~u IJl*ay ha.ve. r~gard*ing thism-atter.

Encl bsure:

As Stated.:

~, Ed~~rd G *. Gr~enman; Direttor
  • .. Di.vision_.of. R.eactor Projects.

Sei.Attached Distribution (see attac~* d concurrence)

G~;III ;.-

.R~G

~'tb~*

  • .-~II*,

~~i Riil

/~L/

, (

(tl/\\I) l*r Jo sen..

Ring e ~ on

  • n;r

~i 11 er : Greenman

  1. , 7/S Z-

.. i(/i7 f /V y 1~1 l~')_ f)7 !~.. ~ /1 7

Docket No. 50-255 EA 92-074.

Consumers Power Company ATTN:

Gerald B. Slade

. General Manager Palisades Nuclear Generating Plant 27780 Blue Star Memorial Highway,

Covert, MI 49043

Dear Mr. Slade':

This notice confir~s the discussion between Mr. P. ~. Donnelly of your staff

  • and Mr. M. A. Ring of this.office regarding arrangements for an enforcement conference.between members of our respecti~e organizations. This conference is scheduled for Friday, May 1, 1992, at 10 a.m. (CDT), at the NRC _Region III office at 799 Roosevelt Road, Buildirig 4, Glen Ellyn, 1llinois.

The purpose of this conference is to discuss the circumstances surrounding:

(1) your apparent failure to take prompt corrective actions in response to

  • en~ironmental qualifjcation discrepan~i~s identified Jn a contractor report; and (2) potential inaccurate inform~tion associated with your request for~..

Please be prepared to discuss at the enforcement conference in both y~~i cir~l presentation and in a concise written hando_ut the topics listed in the enclosed agenda.

We will *gladly discuss any qu~stions you m~y have regarding this matter.

Enclosure:

As Stated See Attached Distribution RII I Ring Edward G. Greenman, Director Divisipn of Reactor ~rejects

/

.\\.. : ;-

1/1' / :.

i Ii\\.

I RI II Pederson Greenman.

  • .ENCLOSURE
1.

Discuss~the app~r~nt violations, their signific~nce and root causes, and.

your corrective ac~ions.

  • 2. * *Discuss *what steps you have taken tQ*ensure that identification,.

control~ and disposition of: all future deficiencies occur ~n a schedule commensurate with their importance. This should not be limited to the

environmental qualificatton area. *

.. 3~

.What assurance do you bave that other cutrent deficiencie$ are being processed in a timely manner?

4;

.Explain why the Impell Report~ and its potenttal for containing-other safety significant issues, was not discussed with the NRC*staff w~en you requested. the Temporary Waiver of Compliance.

5.

Qiscuss what steps you will tak~ to ensur~ that the ~nvironmental qualification program is.audited more frequently..