Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000260/LER-1995-004, :on 950330,reactor Scram Resulted from Personnel Error During Surveillance Testing Caused Actuation of ESF Sys.Operations Personnel Brought Plant to Shutdown Condition + (ML18038B259)
- ML18038B261 + (ML18038B261)
- ML18038B262 + (ML18038B262)
- ML18038B263 + (ML18038B263)
- ML18038B264 + (ML18038B264)
- ML18038B265 + (ML18038B265)
- ML18038B266 + (ML18038B266)
- ML18038B267 + (ML18038B267)
- 05000260/LER-1995-003-01, Forwards LER 95-003-01 Re Main Steam Safety/Relief Valves Exceeding TS Setpoint Limit During Tests + (ML18038B268)
- ML18038B269 + (ML18038B269)
- 05000260/LER-1995-001-01, Forwards LER 95-001-01 Re EDG Turbocharger Failure.Util Completed Failure Analysis & Decided Most Probable Cause of Turbocharger Failure Was Tooth Bending Fatigue on Planetary Sun Gear + (ML18038B271)
- ML18038B273 + (ML18038B273)
- ML18038B275 + (ML18038B275)
- ML18038B276 + (ML18038B276)
- PMNS20180126, Pre-Submittal Meeting with Firstenergy Nuclear Operating Company Regarding a Proposed License Amendment Request for Perry Nuclear Power Plant, Unit No. 1 + (ML18038B281)
- ML18038B284 + (ML18038B284)
- ML18038B285 + (ML18038B285)
- ML18038B289 + (ML18038B289)
- ML18038B297 + (ML18038B297)
- ML18038B300 + (ML18038B300)
- PNO-II-95-036, on 950615,plant Lost Offsite Power to Two of Four 416OV Shutdown Boards.Caused by Cropduster Plant Hitting 161 Kv Line Power.Power Restored to Start Bus 37 Minutes After Incident + (ML18038B301)
- ML18038B302 + (ML18038B302)
- ML18038B309 + (ML18038B309)
- ML18038B316 + (ML18038B316)
- ML18038B319 + (ML18038B319)
- ML18038B320 + (ML18038B320)
- ML18038B321 + (ML18038B321)
- ML18038B322 + (ML18038B322)
- ML18038B323 + (ML18038B323)
- 05000260/LER-1995-005-01, :on 950607,HPCI Steam Supply Valve Failed During Testing Due to Failure of HPCI Steam Supply Valve to Open During Initial Start of Flow Test.Issued Maint Work Order to Investigate & Determine Cause of Valve Failure + (ML18038B324)
- ML18038B330 + (ML18038B330)
- ML18038B331 + (ML18038B331)
- ML18038B332 + (ML18038B332)
- ML18038B333 + (ML18038B333)
- 05000296/LER-1995-001-03, :on 950615,under-voltage Condition Occurred on Shutdown Boards,Automatically Starting Edgs.Caused by Loss of Athens 161 Kv Line.Edgs Placed in Standby & Power Restored to Buses + (ML18038B334)
- ML18038B335 + (ML18038B335)
- ML18038B336 + (ML18038B336)
- ML18038B337 + (ML18038B337)
- ML18038B338 + (ML18038B338)
- ML18038B340 + (ML18038B340)
- ML18038B343 + (ML18038B343)
- ML18038B347 + (ML18038B347)
- ML18038B348 + (ML18038B348)
- ML18038B351 + (ML18038B351)
- ML18038B356 + (ML18038B356)
- ML18038B358 + (ML18038B358)
- IR 05000259/1995030 + (ML18038B360)
- ML18038B361 + (ML18038B361)
- ML18038B369 + (ML18038B369)
- ML18038B382 + (ML18038B382)
- ML18038B383 + (ML18038B383)