Failure of BFN Unit 2 Hpcis During Testing.Event Reported Per 10CFR50.73(a)(2)(v),as Condition Alone Could Have Prevented Fulfillment of Safety Function of Structure or Sys Needed to Mitigate Consequences
ML18038B322
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 07/07/1995
From: Machon R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18038B323 List:
References
NUDOCS 9507110089
Download: ML18038B322 (6)


Text

~ PRIORITY 10 tACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9507110089 DOC.DATE: 95/07/07 NOTARIZED: NO DOCKET g

FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 p

AUTH.NAME AUTHOR AFFILIATION MACHON,R.D.

Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

I

SUBJECT:

Forwards LER 95-005 re failure of BFN Unit 2 HPCIS during!

testing. Event reported per 10CFR50.73(a)(2)(v),as condition alone could have prevented fulfillment of safety function of 0

structure or sys needed to mitigate consequences.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR (

ENCL

(

SIZE:

gR+ 5 TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:

RECIPIENT ID CODE/NAME PD2-3-PD INTERNAL: ACRS AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DOPS/OECB NRR/DRCH/HICB NRR/DSSA/SPLB NRR/DSSA/SRXB RGN2 FILE 01 EXTERNAL: L ST LOBBY WARD NOAC MURPHY,G.A NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME WILLIAMS,J.

AEOD/SPb RAB CE TER NRR/DISP/PIPB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DSSA/SPSB/B RES/DSIR/EIB LITCO BRYCE,J H

NOAC POORE,W.

NUDOCS FULL TXT COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 2

2 1

1 1

1 N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL

DESK, ROOM OWFN 5DS (415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED:

LTTR 27 ENCL 27

4l

7e"t essee '/a: e/ >> '.>ci:y. ="s: 0"ce 9cx 2cC""sea:

. 4aw-a 3M% 2KC R. D. (Rice> Machan Vce > esca-.. = -:."s e.", 4:ea

>a":

July 7, 1995 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555

Dear Sir:

10 CFR 50.73 BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1 g 2 ~

AND 3 DOCKET NOS 50-259~

50-260~

AND 50-296 FACILITY OPERATING LICENSE DPR-33~

52~

AND 68

-LICENSEE EVENT REPORT

.(LER) 50-260/95005 The enclosed report provides details concerning a failure of the Unit 2 High Pressure Coolant Injection System during testing.

TVA is reporting this event in accordance with 10 CFR 50.73 (a)(2)(v),, as a condition that alone could have prevented the fulfillment of the safety function of a structure or system that is needed to mitigate the consequences of an accident.

Sincerely, R.

D.

M on Enclosure cc:

See page 2

9507113089 950707 PDR ADOCK 05000260 S

PDR

U.S. Nuclear Regulatory Commission Page 2

JULY 7$

1995 Enclosure cc (Enclosure):

INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 Paul Krippner American Nuclear Insurers Town Center, Suite 300S 29, South Main Street West Hartford, Connect'cut 06107 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12,.Box 637

Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory, Commission Region II 101 Marietta Street, NW, Suite 2900 At,lanta, Georgia 30323 Mr.. J.

F. Williams, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852

41 II I