Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18016A291 + (ML18016A291)
- ML18016A293 + (ML18016A293)
- ML18016A296 + (ML18016A296)
- ML18016A298 + (ML18016A298)
- HNP-98-013, Responds to NRC Re Violations Noted in Insp Rept 50-400/97-12.Corrective Actions:Temporary Interim Action Will Remain in Place Until Specific Procedural Requirements Are Implemented + (ML18016A302)
- HNP-98-011, Forwards Rev 0 to Procedure HNP-IST-002, Shearon Harris Nuclear Power Plant,Ist Program Plan - 2nd Interval. Plan Describes Tests Required to Verify Operational Readiness of Class 1,2 & 3 Pumps & Valves + (ML18016A303)
- ML18016A304 + (ML18016A304)
- ML18016A305 + (ML18016A305)
- ML18016A308 + (ML18016A308)
- HNP-98-007, Forwards Listed Info in Response to GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps + (ML18016A309)
- ML18016A311 + (ML18016A311)
- ML18016A312 + (ML18016A312)
- 05000400/LER-1998-001, :on 980109,potential Condition Outside Design Basis Related to Instrument Air Sys Leak Causing SG pre- Heater Bypass Isolation Valves to Be Inoperable Was Noted. Caused by Inadequate Design Control.Generated Jco 98-01 + (ML18016A313)
- HNP-98-016, Provides Proprietary Notification That Reactor Operator Licensed on Plant Reassigned from Position for Which Util Previously Certified Need for Reactor Operator License.Encl Withheld (Ref 10CFR2.790(a)(6)) + (ML18016A314)
- HNP-98-018, Monthly Operating Rept for Jan 1998 for Shearon Harris Nuclear Power Plant + (ML18016A318)
- ML18016A319 + (ML18016A319)
- ML18016A320 + (ML18016A320)
- ML18016A322 + (ML18016A322)
- ML18016A323 + (ML18016A323)
- ML18016A326 + (ML18016A326)
- ML18016A327 + (ML18016A327)
- ML18016A328 + (ML18016A328)
- 05000400/LER-1998-003, :on 980129,failure to Perform Shutdown Margin Calculation Required by TS Surveillance Requirements Occurred.Caused by Ambiguity in TS 3.1.3.1.c.Procedures Revised + (ML18016A329)
- HNP-98-030, 1997 Annual Operating Rept of Individuals Receiving Exposures Greater than 100Mr/Yr + (ML18016A330)
- IR 05000400/1997012 + (ML18016A331)
- ML18016A332 + (ML18016A332)
- ML18016A333 + (ML18016A333)
- ML18016A337 + (ML18016A337)
- ML18016A338 + (ML18016A338)
- ML18016A339 + (ML18016A339)
- ML18016A341 + (ML18016A341)
- 05000400/LER-1997-021-02, Forwards LER 97-021-02,describing Addl Condition Identified During on-going TS Surveillance Procedure Review Project.Rev Includes Update to CAs + (ML18016A342)
- ML18016A343 + (ML18016A343)
- HNP-98-031, Responds to NRC GL 97-05, Steam Generator Tube Insp Techniques, for Harris Nuclear Plant + (ML18016A345)
- HNP-98-036, Application for Amend to License NPF-63,deleting TS SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fhb EES Is Locked in Balanced Position at Least Once Per 18 Months + (ML18016A346)
- ML18016A347 + (ML18016A347)
- ML18016A348 + (ML18016A348)
- ML18016A349 + (ML18016A349)
- ML18016A350 + (ML18016A350)
- HNP-98-033, Monthly Operating Rept for Feb 1998 for Shnpp + (ML18016A351)
- HNP-98-035, Responds to NRC Re Violations Noted in Insp Rept 50-400/97-13.Corrective Actions:Justification for Continued Operation Was Generated Along W/Associated Engineering Evaluation + (ML18016A352)
- ML18016A354 + (ML18016A354)
- ML18016A364 + (ML18016A364)
- HNP-98-044, Forwards Rev 32 to PLP-201, Emergency Plan, IAW 10CFR50, App E.Changes Incorporated by Rev Includes Three Listed Categories + (ML18016A368)
- ML18016A371 + (ML18016A371)
- ML18016A373 + (ML18016A373)
- ML18016A374 + (ML18016A374)
- HNP-98-039, Forwards Response to GL 97-06, Degradation of SG Internals + (ML18016A375)
- IR 05000400/1997013 + (ML18016A376)
- ML18016A379 + (ML18016A379)
- HNP-98-047, Submits Response to List of Recommended Actions That Should Be Taken by Util to Ensure Continued Safety of Auxiliary Reservoir Dam + (ML18016A380)