- HNP-94-053, Responds to NRC Re Violations Noted in Insp Rept 50-400/94-10.Corrective Actions:Review of Reg Guide 1.33,App A,Paragraph 3 Made to Check for Any Other Sys That Do Not Have Fill & Vent Procedure Steps + (ML18011A492)
- ML18011A494 + (ML18011A494)
- ML18011A497 + (ML18011A497)
- HNP-94-057, Monthly Operating Rept for June 1994 for Shearon Harris Nuclear Power Plant + (ML18011A500)
- HNP-94-056, Responds to NRC Re Violations Noted in Insp Rept 50-400/94-12.Corrective Action:Acceptance Testing Performed Was Reviewed & Was Considered to Be Adequate + (ML18011A501)
- ML18011A502 + (ML18011A502)
- ML18011A503 + (ML18011A503)
- ML18011A504 + (ML18011A504)
- HNP-94-043, Informs NRC That CP&L Intends to Revise Shnpp Approach to Environmental Qualification of safety-related Equipment Located in Mild Environments + (ML18011A505)
- ML18011A506 + (ML18011A506)
- ML18011A507 + (ML18011A507)
- ML18011A508 + (ML18011A508)
- ML18011A509 + (ML18011A509)
- ML18011A510 + (ML18011A510)
- ML18011A512 + (ML18011A512)
- PMNS20180029, Pre-Submittal Meeting with Tennessee Valley Authority on a Future License Amendment Request for Watts Bar Nuclear Plant, Unit 2 + (ML18011A513)
- ML18011A514 + (ML18011A514)
- ML18011A516 + (ML18011A516)
- ML18011A525 + (ML18011A525)
- ML18011A526 + (ML18011A526)
- ML18011A528 + (ML18011A528)
- ML18011A529 + (ML18011A529)
- ML18011A530 + (ML18011A530)
- IR 05000400/1994010 + (ML18011A531)
- ML18011A532 + (ML18011A532)
- ML18011A534 + (ML18011A534)
- ML18011A535 + (ML18011A535)
- ML18011A537 + (ML18011A537)
- ML18011A538 + (ML18011A538)
- ML18011A539 + (ML18011A539)
- 05000400/LER-1994-017, :on 940711,automatic Isolation of RHR Sys Shutdown Cooling Suction Outboard Containment Isolation Valve Occurred Due to Inadequate Work Order.Work Order Process for I&C Work Orders Will Be Reviewed + (ML18011A540)
- HNP-94-062, Cycle 6 Startup Test Rept. W/ + (ML18011A541)
- ML18011A542 + (ML18011A542)
- ML18011A543 + (ML18011A543)
- ML18011A545 + (ML18011A545)
- ML18011A546 + (ML18011A546)
- HNP-94-063, Monthly Operating Rept for Jul 1994 for Shnpp + (ML18011A547)
- 05000400/LER-1994-002-03, :on 940717,TS Surveillance Violation Occurred Due to Failure to Perform Required RMS Compensatory Measures for TB Wrgm,Declared Inoperable on 940716.Daily SR Procedures Will Be Revised + (ML18011A548)
- HNP-94-025, Application for Amend to License NPF-63,incorporating Programmatic Controls for Radioactive Effluents,Radiological Environ Monitoring & Solid Wastes in Administrative Controls Section of TS & Relocating RETS to ODCM or Pcp,Per GL 89-01 + (ML18011A549)
- ML18011A550 + (ML18011A550)
- ML18011A551 + (ML18011A551)
- 05000400/LER-1994-003-03, :on 940718,single Failure Identified in One Train of Esws That Could Possibly Prevent High Head Charging/Si Pumps from Performing Design Function.Caused by Oversight During Esws Design + (ML18011A553)
- ML18011A557 + (ML18011A557)
- ML18011A558 + (ML18011A558)
- ML18011A559 + (ML18011A559)
- IR 05000400/1994015 + (ML18011A561)
- HNP-94-068, Forwards Seminannual Radioactive Effluent Release Rept for Jan-June 1994 & ODCM, Rev 4 + (ML18011A562)
- ML18011A563 + (ML18011A563)
- HNP-94-070, Responds to NRC Re Violations Noted in Insp Rept 50-400/94-13.Corrective Actions:Maint Surveillance Test Procedures & Process Instrumentation Calibr Procedures Will Be Revised.Violation a Denied + (ML18011A564)
- ML18011A566 + (ML18011A566)
- IR 05000400/1994016 + (ML18011A568)