HNP-94-063, Monthly Operating Rept for Jul 1994 for Shnpp

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1994 for Shnpp
ML18011A547
Person / Time
Site: Harris 
Issue date: 07/31/1994
From: Robinson W, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-94-063, HNP-94-63, HO-941048, NUDOCS 9408190216
Download: ML18011A547 (7)


Text

P H.IC)R.I TV 1

(ACCELERATEDRIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9408190216 DOC.DATE: IA+N~

NOTARIZED: NO FACXL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATXON ROGERS,S.

Carolina Power

& Light Co.

ROBINSON,W.R.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Monthl operating rept for Jul 1994 for SHNPP.

W 940810 ltr.

DISTRIBUTION CODE IE24D COPXES RECEIVED'LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Spe s)

NOTES:Application for permit renewal filed.

05000400 RECIPXENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS RR DORS/OEAB REG IL 01 EXTERNAL: EG&G BRYCE,J.H NRC PDR COPIES LTTR ENCL 1

1 10 10 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME LE,N AEOD/DSP/TPAB NRR/ DRXL/RPE B RGN2 NOAC COPIES LTTR ENCL 1

1 1

~

1 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXT. S04-2083 ) TO ELIMINATEYOUR NAMEFROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

Carolina Power &light Company PO Box 165 New Hill NC 27562 AUG

~

0 lgyg File: HO-941048 William R. Robinson Vice President Harris Nuclear Plant Serial HNP-94-063 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATIONS REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Shearon Harris Nuclear Power Plant, Carolina Power &Light Company herewith submits the report of operation statistics and shutdown experience for the month of July 1994.

Sincerely, W. R. R inson SGR:smh Enclosure c:

Mr. S. D. Ebneter (NRC-RII)

Mr. N. B. Le (NRR)

" Mr. J. E. Tedrow (NRC-SHNPP)'

QI) O 74 9408190216 94073i PDR ADOCK 05000400 PDR State Road 1134 New Hill NC Tel 919 362-2502 Fax 919 362-6950

, ~

1 I I e

IL

~

Enclosure to

'erial HNP-94-063

'heet 1 of 3 CPSL,CO RUN DATE 08/02/94 RUN TIME 10:06:44 PLANT PERFORMANCE DATA SYSTEM OPERATZNC DATA REPORT HARRIS UNIT 1 PACE 1

RPD36"000 OPERATING STATUS DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362"2573

,1. UNIT NAME:

HARRIS UNIT 1 2.

REPORTING PERIOD:

JULY 94

3. LICENSED THERMAL POWER (MWT): 2775 4.

NAMEPLATE RATING (CROSS MWE): 950.9 5.

DESIGN ELECTRICAL RATING (NET MWE): 900.0

[ NOTES 6.

MAX DEPENDABLE CAPACITY (GROSS MWE) c 920.0 7.

MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.

ZP CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)

SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED ZF ANY (NET MWE) )

10.

REASONS FOR RESTRICTION ZF ANY:

THIS MONTH YR TO DATE CUMUL ATZVE 11.

HOURS ZN REPORTINC PERIOD 12.

NUMBER OF HOURS REACTOR CRITICAL 13.

REACTOR RESERVE SHUTDOWN HRS 14.

HOURS GENERATOR ON LINE 15.

UNIT RESERVE SHUTDOWN HOURS 16.

CROSS THERMAL ENERCY CEN.

(MWH) 17.

GROSS ELEC.

ENERGY GEN.

(MWH) 18.

NET ELEC.

ENERGY GENERATED (MWH)

19. UNIT SERVICE FACTt)R
20. UNIT AVAILABILITYPACTOR
21. UNIT CAP.

FACTOR (USINC MDC NET)

22. UNIT CAP.

FACTOR (USZNC DER NET) 23.

UNIT FORCED OUTAGE RATE 24.

SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS 744.00 5087.00 744 F 00 3822.70 F 00

.00 744. 00 3781.13

.00

.00 2007830.16 10204538.58 651719.00 3384338.00 610480.00 3148924.00 100. 00 74.33 100.00 74.33 95.41 71.98

91. 17
68. 78.

.00

.00 (TYPE~ DAZED'ND DURATION 63552.00 52125. 01

.00 51558.76

.00 137463192.54 45818559.00 42682321. 00

81. 13 81.13 78.09 74.62 3 ~ 10 OF EACH)t 25.

ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE.OF START UPt 26.

UNITS ZN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)) PORECAST ACHIEVED INITIALCRITICALITY INZTZAL ELECTRICITY COMMERCIAL OPERATION MIS/MTH-OPR.RPT/2/OS4 1.16 - 9

Enclosure to

, Serial',HNP-94-063' Sheet2of3 OPAL CO RUN DATE 08/02/94 RUN TIME 10<06t44 PLANT PERFORMANCE DATA SYSTEM APPENDIX B - AVERAGE DAILY POWER LEVEL HARRIS UNIT 1 PAGE 1

RPD39-000 DOCKET NO. 050"400 COMPLETED BY SHEILA ROGERS TELEPHONE (919) 362-2573 1994 DAY AVG ~ DAILY POWER LEVEL (MWE-NET)

DAY AVG. DAILY POWER LEVEL (MWE"NET) 853 17 847 849 18 849 849 19 849 850 20 847 851 21 848 847 22 792 848 23 243 847 24 720 841 842 10 802 26 846 847 27 848 12 845 28 849 13 844 29 849 14 843 30 852 15 843 31 850 16 846

'I 1 ~ 16 - 8 HIS/MTH-OPR.RPT/3/OS%

W

~

UNITSHUTDOWNS AND POWER REDUCTION REPORT MONTH:JULY 1994 DOCKET NO.:

050-400 UNITNAME:

Harris DATE:

August 2, 1994 COMPLETED BY:

S. G. Rogers TELEPHONE:

(919) 362-2573 NUMBER DATE TYPE'URATION REASON'HOURS)

METHOD OF SHUTTING DOWN REACTORa LICENSEE EVENT REPORT 4 SYSTEM COMPONENT CODE 4 CODE 5 CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE 94409 940722 N/A EE INSTRU A-Emergency Diesel Generator: Linear Reactor bolts found loose and were tightened.

B-Emergency Diesel Generator: replaced governor.

NOTE: This event is still under review.

1 F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training &, License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG4161) 5 Exhibit I - Same Source

~cn&

CD (p <. O CD FD o Z~

0 Ch