Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17352A940 + (ML17352A940)
- ML17352A946 + (ML17352A946)
- ML17352A947 + (ML17352A947)
- L-94-313, Monthly Operating Repts for Nov 1994 for Turkey Point Units 3 & 4 + (ML17352A949)
- ML17352A950 + (ML17352A950)
- 05000251/LER-1994-006-02, :on 941130,Unit 4 Tripped Automatically.Caused by Failure of Flexible Link Connection Between Main Generator B Phase Bus & Associated Isolated Phase Bus Bar. All Bolts on Flexible Link Checked + (ML17352A951)
- L-94-317, Forwards Rev 28 to Radiological Emergency Plan. Attachment 1 Provides Summary of Plant Radiological Emergency Plan Rev 28 Changes + (ML17352A952)
- L-94-293, Provides Update on Items Completed at Plant During 941003-1114 Cycle 15 Refueling Outage.Summarizes Regulatory Activities & Items of Regulatory Interest,For Which Action Taken During Refueling Outage + (ML17352A955)
- L-94-319, Forwards Util Scope & Objectives for 1995 Facility Annual EP Exercise + (ML17352A956)
- ML17352A958 + (ML17352A958)
- ML17352A960 + (ML17352A960)
- L-94-306, Responds to RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers Issued by NRC on 931220,to Help Insure Timely Resolution of Fire Barrier at Facility Units 2 & 3 + (ML17352A961)
- L-94-327, Submits Financial Info,Per 10CFR140.21.Licensee 1993 Form 10-K,most Recent Annual Financial Rept,Attached as Exhibit 1 + (ML17352A962)
- ML17352A963 + (ML17352A963)
- L-94-301, Forwards Response to 10CFR50.46, Acceptance Criteria for ECCS in Light Water Power Reactors, Satisfying Annual Reporting Requirements for Util Turkey Point Units 3 & 4 + (ML17352A964)
- L-94-328, Advises That Recommended Current Order Timing Mod,Per GL 93-04,will Be Implemented During Next Refueling Outage for Unit 3 Scheduled to Start in Sept 1995 & Unit 4 Scheduled to Start in Mar 1996 + (ML17352A971)
- ML17352A975 + (ML17352A975)
- ML17352A986 + (ML17352A986)
- ML17352A991 + (ML17352A991)
- ML17352A992 + (ML17352A992)
- ML17352A993 + (ML17352A993)
- ML17352A994 + (ML17352A994)
- ML17352A996 + (ML17352A996)
- IR 05000250/1994024 + (ML17352A998)
- ML17352A999 + (ML17352A999)
- ML17352B002 + (ML17352B002)
- ML17352B004 + (ML17352B004)
- ML17352B005 + (ML17352B005)
- ML17352B009 + (ML17352B009)
- 05000250/LER-1994-006-03, :on 941226,C Main Feedwater Control Valve Failed Closed,Causing Reactor & Turbine Trips.Caused by Loose Screw Terminal Connection.I/P Transducers Replaced W/ New Model W/Different Design Wire Connection + (ML17352B010)
- ML17352B011 + (ML17352B011)
- ML17352B012 + (ML17352B012)
- ML17352B013 + (ML17352B013)
- ML17352B014 + (ML17352B014)
- ML17352B017 + (ML17352B017)
- ML17352B018 + (ML17352B018)
- ML17352B019 + (ML17352B019)
- ML17352B022 + (ML17352B022)
- ML17352B023 + (ML17352B023)
- ML17352B027 + (ML17352B027)
- ML17352B028 + (ML17352B028)
- ML17352B029 + (ML17352B029)
- ML17352B030 + (ML17352B030)
- L-95-051, Monthly Operating Repts for Jan 1995 for Turkey Point Units 1 & 2 + (ML17352B031)
- ML17352B033 + (ML17352B033)
- L-95-053, Special Rept:On 950201,rapid Start of EDG Attempted & Alarms Failed to Sound When EDG Did Not Start.Caused by High Resistance on Contacts of Relay.Relay Replaced & EDG Retested Satisfactorily + (ML17352B035)
- L-95-002, Forwards Response to NRC 941117 RAI Re Proposed License Amends Submitted by 940719 & 1020 Ltrs,Revising TS 3/4.7.1.1 & Associated Bases Which Addresses Max Allowable Reactor Thermal Power Operation W/Inoperable MSSVs + (ML17352B036)
- ML17352B040 + (ML17352B040)
- ML17352B042 + (ML17352B042)
- ML17352B043 + (ML17352B043)
- ML17352B044 + (ML17352B044)