Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-94-268, Forwards COLR for Turkey Point Units 3 & 4 + (ML17352A846)
- ML17352A847 + (ML17352A847)
- ML17352A848 + (ML17352A848)
- ML17352A849 + (ML17352A849)
- ML17352A851 + (ML17352A851)
- ML17352A852 + (ML17352A852)
- L-94-274, Forwards Proprietary Results of Investigation Into Concerns Through Nuclear Safety Speakout Program.Results Withheld + (ML17352A855)
- ML17352A869 + (ML17352A869)
- M170271, Annual Statement of Non-Availability of Federal Government Funding for Conversion from HEU to Leu for Vnc Nuclear Test Reactor (Ntr) + (ML17352A870)
- ML17352A870 + (ML17352A870)
- ML17352A871 + (ML17352A871)
- ML17352A872 + (ML17352A872)
- IR 05000250/1994018 + (ML17352A874)
- ML17352A875 + (ML17352A875)
- ML17352A877 + (ML17352A877)
- IR 05000250/1994099 + (ML17352A879)
- ML17352A880 + (ML17352A880)
- ML17352A881 + (ML17352A881)
- L-94-264, Forwards Turkey Point Nuclear Plant,Simulator Certification Update 1, Per 10CFR55.45 + (ML17352A882)
- ML17352A883 + (ML17352A883)
- ML17352A884 + (ML17352A884)
- 05000250/LER-1994-004-03, :on 941103,Unit 3 Outside Design Basis Due to Two of Three Required Safety Injection Pumps Inoperable. Control Switches for 3A & 3B Safety Injection Pumps Immediately Returned to Automatic + (ML17352A885)
- 05000250/LER-1994-005-03, :on 941103,design Defect in Safeguards Bus Sequencer Test Logic Places Both Units Outside Design Basis. Caused by 3A Sequencer Failed to Respond as Expected to Opposite Unit SI Signal + (ML17352A887)
- ML17352A888 + (ML17352A888)
- ML17352A889 + (ML17352A889)
- ML17352A890 + (ML17352A890)
- IR 05000250/1994019 + (ML17352A892)
- ML17352A895 + (ML17352A895)
- L-94-289, Monthly Operating Repts for Oct 1994 for Turkey Points Units 3 & 4 + (ML17352A898)
- L-94-290, Forwards Rept of Unsatisfactory Performance Testing Incident.Rept Details Investigative Analysis of Unsatisfactory Blind Specimen Result,Including Cause & C/A Taken by Smithkline Beecham Clinical Lab + (ML17352A901)
- ML17352A907 + (ML17352A907)
- ML17352A911 + (ML17352A911)
- IR 05000250/1994020 + (ML17352A915)
- ML17352A920 + (ML17352A920)
- IR 05000250/1994021 + (ML17352A925)
- ML17352A930 + (ML17352A930)
- L-94-279, Submits Commitments Re Containment Structural Reanalysis Meeting.Util Appreciated Opportunity to Meet W/Nrc Staff + (ML17352A931)
- L-94-292, Forwards Plant Procedures & Training Material Provided for Preparation of Licensing Exams for Reactor Operator Group Xv & SRO Upgrade 94,scheduled for Week of 950227 + (ML17352A934)
- ML17352A935 + (ML17352A935)
- ML17352A938 + (ML17352A938)
- ML17352A939 + (ML17352A939)
- ML17352A940 + (ML17352A940)
- ML17352A946 + (ML17352A946)
- ML17352A947 + (ML17352A947)
- L-94-313, Monthly Operating Repts for Nov 1994 for Turkey Point Units 3 & 4 + (ML17352A949)
- ML17352A950 + (ML17352A950)
- 05000251/LER-1994-006-02, :on 941130,Unit 4 Tripped Automatically.Caused by Failure of Flexible Link Connection Between Main Generator B Phase Bus & Associated Isolated Phase Bus Bar. All Bolts on Flexible Link Checked + (ML17352A951)
- L-94-317, Forwards Rev 28 to Radiological Emergency Plan. Attachment 1 Provides Summary of Plant Radiological Emergency Plan Rev 28 Changes + (ML17352A952)
- L-94-293, Provides Update on Items Completed at Plant During 941003-1114 Cycle 15 Refueling Outage.Summarizes Regulatory Activities & Items of Regulatory Interest,For Which Action Taken During Refueling Outage + (ML17352A955)
- L-94-319, Forwards Util Scope & Objectives for 1995 Facility Annual EP Exercise + (ML17352A956)
- ML17352A958 + (ML17352A958)