Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17348B232 + (ML17348B232)
- ML17348B233 + (ML17348B233)
- ML17348B236 + (ML17348B236)
- ML17348B238 + (ML17348B238)
- ML17348B240 + (ML17348B240)
- IR 05000250/1991039 + (ML17348B241)
- ML17348B242 + (ML17348B242)
- ML17348B244 + (ML17348B244)
- ML17348B245 + (ML17348B245)
- L-91-309, Monthly Operating Repts for Oct 1991 for Turkey Point,Units 3 & 4 + (ML17348B246)
- L-91-278, Forwards Comments on SER Accompanying 910423 Amends to Licenses DPR-31 & DPR-41 Re RTD Bypass Elimination Project, Per 900913 Application for Amends to Licenses + (ML17348B247)
- ML17348B248 + (ML17348B248)
- ML17348B249 + (ML17348B249)
- 05000250/LER-1991-009, :on 911018,axial Flux Difference Discovered Outside Tech Spec Target Band Limits for More than 15 Minutes.Caused by Inadequate Procedure.Ts Amend Request Submitted & Procedure Revised + (ML17348B250)
- L-91-307, Responds to Inspector Followup Item Noted in Insp Repts 50-250/91-34 & 50-251/91-34 on 910819-23.Recommeded Shelf Life of Uci Sequencer Spare Parts Acceptable + (ML17348B251)
- L-91-315, Informs of 911022 Unsatisfactory Blind Specimen Samples Performance Testing Incident.Samples Reported Negative W/No Indication of Problems.Caused by Random Periodic Variation Due to Periodic Problem W/Syva Kit.Syva Kit Replaced + (ML17348B253)
- ML17348B255 + (ML17348B255)
- ML17348B257 + (ML17348B257)
- IR 05000250/1991300 + (ML17348B259)
- ML17348B260 + (ML17348B260)
- L-91-320, Forwards Completion Summary of Select Sys Assessment.Rhr 887 Valve Replacement & Emergency Diesel Generator Redundant Set of Air Start Motors Completed During Unit 4 Outage + (ML17348B268)
- 05000251/LER-1991-006-02, :on 911029,AFW Pumps Autostarted Following Low Suction Pressure Trip of Main Feedwater Pump Due to Mechanical Failure of Regulator to Condensate Polishing Vessel Inlet Valve.Cps Bypassed + (ML17348B270)
- ML17348B273 + (ML17348B273)
- ML17348B274 + (ML17348B274)
- ML17348B276 + (ML17348B276)
- ML17348B277 + (ML17348B277)
- L-91-318, Responds to Violations Noted in Insp Repts 50-250/91-37 & 50-251/91-37.Corrective Actions:Plant Change/Mod Installed in Current Cavity Seal Ring Holddown Clamps & Procedure Re Removal of Reactor Cavity Seal Ring Revised + (ML17348B278)
- ML17348B282 + (ML17348B282)
- L-91-333, Monthly Operating Repts for Nov 1991 for Turkey Point Units 3 & 4 + (ML17348B287)
- 05000250/LER-1991-013, :on 911206,health Physics Notified That Small Amount of Liquid Leaked Onto Ground Where Vehicle Parked. Caused by Inadequate Container Lower Door Seal.Door Seals Caulked W/Flexible Silicon Sealant + (ML17348B288)
- LR-N17-0176, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Uprate + (ML17348B289)
- ML17348B292 + (ML17348B292)
- ML17348B294 + (ML17348B294)
- ML17348B296 + (ML17348B296)
- IR 05000250/1991038 + (ML17348B297)
- L-91-322, Responds to Violations Noted in Insp Repts 50-250/91-35 & 50-251/91-35.Corrective Actions:Cited Document Packages Updated to Reflect Installed Configuration & Package Will Be Revised to Include Vendor Model Number Changes + (ML17348B298)
- L-91-329, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/91-42 & 50-251/91-42.Corrective Actions:Reactor Power Was Reduced Below 90 Percent & Indicated Axial Flux Was Returned to within Target Band on 911018 + (ML17348B299)
- L-91-323, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/91-39 & 50-251/91-39.Corrective Actions:Tested Dropout Timing of 162/TDDO Relays on 910919.Procedure 0-PMR-005.10, HGA 162/TDDO Relay Calibr, Approved + (ML17348B300)
- L-91-316, Forwards Nonproprietary WCAP-12960 & Proprietary WCAP-12959, Structural Evaluation of Turkey Point,Units 3 & 4, Pressurizer Surge Lines,Considering Effects of Thermal Stratification, Per Response to NRC Bulletin 88-011 + (ML17348B301)
- ML17348B303 + (ML17348B303)
- ML17348B305 + (ML17348B305)
- 05000250/LER-1991-012, :on 911007,delta-T Factor in Overpower Delta-T & Overtemp Delta-T Found Set at Design Value of 56.1 F Instead of TS Value.Caused by Procedure Error.Values Changed & Plant Procedures Developed + (ML17348B306)
- ML17348B307 + (ML17348B307)
- L-91-336, Forwards Individual Plant Exams of External Events for Severe Accident Vulnerabilities,As Requested Per Generic Ltr 88-20,Suppl 4 + (ML17348B308)
- ML17348B309 + (ML17348B309)
- IR 05000250/1991041 + (ML17348B312)
- IR 05000250/1991037 + (ML17348B313)
- L-91-350, Forwards Most Recent Annual Financial Rept,Us Securities & Exchange Commission Form 10-K & Most Recent Quarterly Financial Rept,Form 10-Q.Internal Cash Flow Excluding Retained Earnings Rept Also Encl + (ML17348B314)
- ML17348B315 + (ML17348B315)
- L-91-348, Forwards Listed Inservice Insp Repts,Per ASME Code,Section XI,(IWA-6230) + (ML17348B316)
- L-91-349, Forwards Revised Relief Requests VR-2,VR-6,VR-9,VR-11,VR-12, VR-13,VR-14,VR-22 (Withdrawn) & New Relief Requests VR-29 Through VR-32 for Inservice Testing Program + (ML17348B317)