Text
QEC o~
1991
~ ~*~ p
~
~ ~
u 8
P'
~af i~ ~~i
s
Docket Nos.
50-250,
50-251
License
Nos.
Florida Power
and Light Company
ATTN: Mr. J.
H. Goldberg
President - Nuclear Division
Nuclear Energy Department
P.O.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
Subject:
SYSTEMATIC ASSESSMENT
OF LICENSEE
PERFORMANCE
(NRC INSPECTION
REPORT
NOS. 50-250/91-41
AND 50-251/91-41)
The
NRC. Systematic
Assessment
of Licensee
Performance'(SALP)
has
been
completed for your Turkey Point facility.
The facility was evaluated for the
period August 1, 1990, through September
28,
1991.
The results of the
evaluation
are
documented
in the enclosed Initial SALP Report.
This report
will be discussed
with you at
a public meeting to be held at the Turkey Point
facility at 10:00 a.m.
on December
10; 1991.
The performance of your Turkey Point facility was evaluated
in the functional
areas
of Plant Operations,
Radiological Controls, Maintenance/Surveillance,
Emergency
Preparedness,
Security, Engineering/Technical
Support,
Outage,
and
Safety Assessment/guality
Verification.
The assessment
indicates
superior performance
was attained in the following
areas:
Plant Operations,
Emergency
Preparedness,
Security,
Outage,
and Safety
Assessment/guality
Verification.
In addition, continued
performance
improvement
was demonstrated
in the areas
of Radi'ological
Controls
and
Maintenance/Surveillance;
The assessment
of outage
performance
as Category
1
was particularly significant since it covered
the lengthy dual unit outage.
The modifications, which should
enhance
the overall safety
and security of the
Turkey Point station,
were well controlled
and of high quality.
Good
contingency planning
was also demonstrated
during the extensive
outage.
The assessment
indicates that overall Turkey Point's
performance
continues to
improve which is
a continuation in trends
noted over the past three
periods.
Your managers
and staff are to be commended.
Any comments
you have concerning
our evaluation of the performance of your
Turkey Point facility should
be submitted to this office within 30 days
following the date of our meeting.
These
comments will be considered
in the
development of the Final
SALP Report.
Your comments
and
a summary of our
meeting will be issued
as
an appendix to the Final
SALP Report.
920i03002i 9ii202
ADOCK 05000250
G
'
Florida Power and Light Company
2
DEC o2
1S9)
Should you have
any questions
concerning this letter,,we will be glad to
discuss
them with you.
Sincerely,
Enclosure:
Initial SALP Report - Turkey Point
cc w/encl:
K. N. Harris, Sr. Vice President
Nuclear Operations
Florida Power and Light Co.
P. 0.
Box 14000
Juno Beach,
FL 33408
R.
E. Grazio, Director
Nuclear
Licensing
Florida Power and Light Co.
P. 0.
Box 14000
Juno Beach,
FL
33408-0420
T. F. Plunkett,
Vice President
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami, FL 33102
L.
W. Pearce,
Plant Manager
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami, FL
33102
L.
W. Bladow
equal ity Manager
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami, FL
33102
D. Powell, Superintendent-
Plant Licensing
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami, FL
33102
(cc w/encl cont'd - see
page
3)
Original signed
by
Stewart
D. Ebneter
Regional Administrator
e
e
Florida Power and Light Company
3
(cc w/encl cont'd)
Harold F. Reis,
Esq.
Newman and Holtzinger, P.C.
1615
L Street,
NW
D.
C.
20036
John T. Butler, Esq.
Steel,
Hector and Davis-
4000 Southeast
Financial
Center
Miami,
FL
33131-2398
Attorney General
Department of Legal, Affairs
The Capitol
Tallahassee,
FL
32304
Jacob
Daniel
Nash
Office of Radiation Control
Department of Health
and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee,
FL
32399-0700
Jack
Shreve
Publi c
- Counsel
Office of the Public Counsel
c/o The Florida Lesgislature
111 West Madison Ave.,
Room 812
Tallahassee,
FL
32399-1400
Administrator
Department of Environmental
Regulation
Power Plant Siting Section
State of Florida
2600 Blair Stone
Road
Tallahassee,
FL
32301
Gordon Guthrie, Director
Emergency
Management
Department of Community Affairs
2740 Centerview Drive
Tallahassee,FL
32399-2100
Joaquin Avino
County Manager of Metropolitan
Dade County
111
NW 1st Street,
29th Floor
Miami,
FL
33128
bcc w/encl:
See
page
4
DEc 02
1991
e
Florida Power and Light Company
4
bcc w/encl:
The Chairman
K. C. Rogers,
Commissioner
J.
R. Curtiss,
Commissioner
F. J.
Remick, Commissioner
J.
N. Taylor,
H. L. Thompson, Jr.,
J.
F. Wechselberger,
Regional
Coordinator,
T. E. Hurley,
S. Varga,
R. Auluck,
H. Berkow,
F. Allenspach,
SALP Coordinator,
Regional Administrators, RI, RIII
RIV, and
RV
K. Clark, RII, PAO
N. Sinkule,
DRP, RII
K. Landis,
DRP, RII
J.
Johnson,
DRP, RII
L. Watson, Chief,
NRC Resident
Inspector
DRS and
DRSS Branch Chiefs,
and Section Chiefs
Document Control
Desk
0 2 )ggl
RII'
ll/p'I /91
NR
ck
11/
/91
a
d
s
11/p'I /91
NR
iS,
11/~g /91
ow
R
RII:0
RII'.DRP
RI
5
P
NSinkule
III JJohnson
11/J.) /91
11/~/91
RI
S
RII:DRS
JS
hr
SRubin
lQ ~/91
1'll/ 2- /91