Forwards SALP Rept 50-250/91-41 & 50-251/91-41 for Aug 1990 - Sept 1991
ML17348B309
Person / Time
Site: Turkey Point  
Issue date: 12/02/1991
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17348B310 List:
References
NUDOCS 9201030021
Download: ML17348B309 (8)


See also: IR 05000250/1991041

Text

QEC o~

1991

~ ~*~ p

~

~ ~

u 8

P'

~af i~ ~~i

s

Docket Nos.

50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power

and Light Company

ATTN: Mr. J.

H. Goldberg

President - Nuclear Division

Nuclear Energy Department

P.O.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

Subject:

SYSTEMATIC ASSESSMENT

OF LICENSEE

PERFORMANCE

(NRC INSPECTION

REPORT

NOS. 50-250/91-41

AND 50-251/91-41)

The

NRC. Systematic

Assessment

of Licensee

Performance'(SALP)

has

been

completed for your Turkey Point facility.

The facility was evaluated for the

period August 1, 1990, through September

28,

1991.

The results of the

evaluation

are

documented

in the enclosed Initial SALP Report.

This report

will be discussed

with you at

a public meeting to be held at the Turkey Point

facility at 10:00 a.m.

on December

10; 1991.

The performance of your Turkey Point facility was evaluated

in the functional

areas

of Plant Operations,

Radiological Controls, Maintenance/Surveillance,

Emergency

Preparedness,

Security, Engineering/Technical

Support,

Outage,

and

Safety Assessment/guality

Verification.

The assessment

indicates

superior performance

was attained in the following

areas:

Plant Operations,

Emergency

Preparedness,

Security,

Outage,

and Safety

Assessment/guality

Verification.

In addition, continued

performance

improvement

was demonstrated

in the areas

of Radi'ological

Controls

and

Maintenance/Surveillance;

The assessment

of outage

performance

as Category

1

was particularly significant since it covered

the lengthy dual unit outage.

The modifications, which should

enhance

the overall safety

and security of the

Turkey Point station,

were well controlled

and of high quality.

Good

contingency planning

was also demonstrated

during the extensive

outage.

The assessment

indicates that overall Turkey Point's

performance

continues to

improve which is

a continuation in trends

noted over the past three

SALP

periods.

Your managers

and staff are to be commended.

Any comments

you have concerning

our evaluation of the performance of your

Turkey Point facility should

be submitted to this office within 30 days

following the date of our meeting.

These

comments will be considered

in the

development of the Final

SALP Report.

Your comments

and

a summary of our

meeting will be issued

as

an appendix to the Final

SALP Report.

920i03002i 9ii202

PDR

ADOCK 05000250

G

PDR

'

Florida Power and Light Company

2

DEC o2

1S9)

Should you have

any questions

concerning this letter,,we will be glad to

discuss

them with you.

Sincerely,

Enclosure:

Initial SALP Report - Turkey Point

cc w/encl:

K. N. Harris, Sr. Vice President

Nuclear Operations

Florida Power and Light Co.

P. 0.

Box 14000

Juno Beach,

FL 33408

R.

E. Grazio, Director

Nuclear

Licensing

Florida Power and Light Co.

P. 0.

Box 14000

Juno Beach,

FL

33408-0420

T. F. Plunkett,

Vice President

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami, FL 33102

L.

W. Pearce,

Plant Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami, FL

33102

L.

W. Bladow

equal ity Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami, FL

33102

D. Powell, Superintendent-

Plant Licensing

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami, FL

33102

(cc w/encl cont'd - see

page

3)

Original signed

by

Stewart

D. Ebneter

Regional Administrator

e

e

Florida Power and Light Company

3

(cc w/encl cont'd)

Harold F. Reis,

Esq.

Newman and Holtzinger, P.C.

1615

L Street,

NW

Washington,

D.

C.

20036

John T. Butler, Esq.

Steel,

Hector and Davis-

4000 Southeast

Financial

Center

Miami,

FL

33131-2398

Attorney General

Department of Legal, Affairs

The Capitol

Tallahassee,

FL

32304

Jacob

Daniel

Nash

Office of Radiation Control

Department of Health

and

Rehabilitative Services

1317 Winewood Boulevard

Tallahassee,

FL

32399-0700

Jack

Shreve

Publi c

- Counsel

Office of the Public Counsel

c/o The Florida Lesgislature

111 West Madison Ave.,

Room 812

Tallahassee,

FL

32399-1400

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

2600 Blair Stone

Road

Tallahassee,

FL

32301

Gordon Guthrie, Director

Emergency

Management

Department of Community Affairs

2740 Centerview Drive

Tallahassee,FL

32399-2100

Joaquin Avino

County Manager of Metropolitan

Dade County

111

NW 1st Street,

29th Floor

Miami,

FL

33128

INPO

bcc w/encl:

See

page

4

DEc 02

1991

e

Florida Power and Light Company

4

bcc w/encl:

The Chairman

K. C. Rogers,

Commissioner

J.

R. Curtiss,

Commissioner

F. J.

Remick, Commissioner

J.

N. Taylor,

EDO

H. L. Thompson, Jr.,

EDO

J.

F. Wechselberger,

Regional

Coordinator,

EDO

T. E. Hurley,

NRR

S. Varga,

NRR

R. Auluck,

NRR

H. Berkow,

NRR

F. Allenspach,

SALP Coordinator,

NRR

Regional Administrators, RI, RIII

RIV, and

RV

K. Clark, RII, PAO

N. Sinkule,

DRP, RII

K. Landis,

DRP, RII

J.

Johnson,

DRP, RII

L. Watson, Chief,

TSS

NRC Resident

Inspector

DRS and

DRSS Branch Chiefs,

and Section Chiefs

Document Control

Desk

DEC

0 2 )ggl

RII'

ll/p'I /91

NR

RA

ck

11/

/91

a

d

s

11/p'I /91

NR

iS,

11/~g /91

ow

R

RII:0

RII'.DRP

RI

5

P

NSinkule

III JJohnson

11/J.) /91

11/~/91

RI

S

RII:DRS

JS

hr

SRubin

lQ ~/91

1'll/ 2- /91