ML17348B274
| ML17348B274 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 11/22/1991 |
| From: | Sinkule M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Goldberg J FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17348B275 | List: |
| References | |
| NUDOCS 9112090114 | |
| Download: ML17348B274 (7) | |
See also: IR 05000250/1991042
Text
FORD
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:9112090114
DOC.DATE: 91/11/22
NOTARIZED: NO
DOCKET
CIL:50-250 Turkey Point Plant, Unit 3, Florida Power
and Light C
05000250
50-251 Turkey Point Plant, Unit 4, Florida Power
and Light C
05000251
AUTH.NAME
AUTHOR AFFILIATION
SINKULE,M.V.
Region
2 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
GOLDBERG,J.H.
Florida Power
& Light Co.
SUBJECT:
Discusses
insp repts
50-250/91-42
& 50-251/91-42
& forwards
notice of violation. Concerns
re importance of ensuring that
procedures
accurately reflect requirements
in tech specs
stressed.
DISTRIBUTION CODE:
ZEOID
COPIES
RECEIVED:LTR i
ENCL
t
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD2-2
INTERNAL: AEOD
AEOD/DSP/TPAB
NRR HARBUCK,C.
NRR/DLPQ/LHFBPT
NRR/DOEA/OEAB
NRR/DST/DIR 8E2
NUDOCS-ABSTRACT
OGC/HDS3
RGN2
FILE
01
EXTERNAL: EG&G/BRYCEiJ.H.
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
AULUCK,R
AEOD/DEIIB
DEDRO
NRR MORISSEAU,D
NRR/DLPQ/LPEB10
NRR/DREP/PEPB9H
NRR/PMAS/ILRB12
OE DIR
RE G=-PIER~0'2-
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
22
ENCL
22
MOV 2 2 lS91-
Docket Nos. 50-250,
50-251
License
Nos.
Florida Power and Light Company
ATTN:
Mr. J.
H. Goldberg
President - Nuclear Division
Nuclear Energy Department
P. 0.
Box 14000
Juno
Beach,
FL
33408
Gentlemen:
SUBJECT:
(NRC INSPECTION
REPORT
NOS. 50-250/91-42
and 50-251/91-42)
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
Mr. R.
C. Butcher of this office on September
28 through October 25,
1991.
The
inspection
included
a review of activities authorized
for your Turkey Point
facility.
At the conclusion of the inspection,
the findings were discussed
with those
members of your staff identified in the enclosed
Inspection Report.
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations
of procedures
and
representative
records,
interviews
with personnel,
and
observation
of
activities in progress.
Based
on the results of this inspection,
certain of your activities appeared
to
be in violation of
NRC requirements,
as specified
in the enclosed
Notice'of
Violation (Notice).
We are
concerned
about
the violation because
of the
importance of ensuring that procedures
accurately reflect the requirements
in
the technical specifications.
You are required to respond to this letter and should follow the instructions
specified
in the
enclosed
Notice
when
preparing
your response.
In your
response,
you should
document
the specific actions
taken
and
any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed
corrective actions
and the results of future
inspections,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the
NRC's
"Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork
Reduction Act of 1980,
Pub.
L. No. 96.511.
9ii2090ii4 9iii22
ADOCK 05000250
8
Florida Power and Light Company
ggy
P
P
$991
Should you have
any questions
concerning this letter, please
contact us.
Sincerely,
ox~>< z~
@,
V SlN~g
Marvin V. Sinkule, Chief
Reactor Projects
Branch
2
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection
Report
cc w/encls:
K. N. Harris, Senior Vice President
Nuclear Operations
P. 0.
Box 14000
Juno
Beach,
FL
33408
T.
F. Plunkett,
Vice President
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami,
FL 33102
L.
W. Pearce,
Plant Manager
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami,
FL
33102
L.
W. Bladow, equality
Manager
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami, FL
33102
D. Powell, Superintendent-
Plant Licensing
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami, FL
33102
Harold
F. Reis,
Esq.
Newman
and Holtzinger, P.C.
1615
L Street,
NW
D.C.
20036
cc w/encls:
(Cont'd
on page 3)
Florida Power and Light Company
NOV 2 2
IS91
(cc w/encls cont'd)
John T. Butler, Esq.
Steel,
Hector,
and Davis
4000 Southeast
Financial
Center
Miami, FL
33131-2398
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee,
FL
32304
Jacob
Daniel
Nash
Office of Radiation Control
Department of Health
and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee,
FL
32399-0700
Jack Shreve
Office of the Public Counsel
Room 4, Holland Building
Tallahassee,
FL
32304
Administrator
Department of Environmental
Regulation
Power Plant Siting Section
State of Florida
Twin Towers
2600 Blair Stone
Road
Tallahassee,
FL
32301
Joaquin
Avino
County Manager of Metropolitan
Dade County
111
NW 1st Street,
29th Floor
Miami,
FL
33128
Intergovernmental
Coordination
and Review
Office of Planning
and Budget
Executive Office of the Governor
The Capitol Building
Tallahassee,
FL
32301
State of Florida
bcc w/encls:
(See
page 4)
e
Florida Power and Light Company
HOV 22
1891
(cc w/encls cont'd)
Document Control
Desk
K. D. Landis, RII
Ross
C. Butcher, Senior
Resident
Inspector
U.S. Nuclear Regulatory
Commission
P.O.
Box 1448
Homestead,
FL
33090
e
R
.DRP
R
n
ll~/91
RI '
KL
ll/~g /91