UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-F50 TURKEY POINT PLANT-UNIT NO.
3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
150 License No. DPR-31 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Florida Power and Light Company (the licensee) dated October 31, 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
911219002k 9f 1206 PDR ADOCN, 05000250 l
P.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No.
DPR-31 is hereby amended to read as follows:
(8)
Technical S ecifications-and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 15O, are hereby incorporated in the license.
The Environmental Protection Plan contained in Appendix 8 is hereby incorporated into the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION ucglg Herbert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Speci ficati ons Date of Issuance:
December 6,
1991
~p,P. 4Egg 0
Cy AnO Ol O
+~
~O
~>>*<<+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-251 TURKEY POINT PLANT UNIT NO.
4 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
145 License No. DPR-41 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Florida Power and Light Company (the licensee) dated October 31, 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No.
DPR-41 is hereby amended to read as follows:
(B)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.
145, are hereby incorporated in the license.
The Environmental Protection Plan contained in Appendix B is hereby incorporated into the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
December 6, 1991 Herbert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
ATTACHMENT TO LICENSE AflENDMENT AMENDMENT NO.
150 FACILITY OPERATING LICENSE NO. DPR-31 AMENDMENT NO.
145 FACILITY OPERATING LICENSE NO. DPR-41 DOCKET NOS. 50-250 AND 50-251 Revise Appendix A as follows:
Remove Pa e
3/4 2-1 Insert Pa e
3/4 2-1
. 3/4. 2 POWER DISTRIBUTION LIMITS 3/4.2.1 AXIAL FLUX DIFFERENCE LIMITING CONDITION FOR OPERATION 3.2. 1 The indicated AXIAL FLUX DIFFERENCE (AFD) shall be maintained within a + 5X target band (flux difference units) about the target flux difference.
The indicated AFD may deviate outside the above required target band at greater than or equal to 50X but less than 90K of RATED THERMAL POWER provided the indi-cated AFD is within the Acceptable Operation Limits of Figure 3.2-1 and the cumu-lative penalty deviation time does not exceed 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> during the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
The indicated AFD may deviate outside the above required target band at greater than 15K but less than 50K of RATED THERMAL POWER provided the cumulative penalty deviation time does not exceed 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> during the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
APPLICABILITY:
MODE 1, above 15K of RATED THERMAL POWER."0 ACTION:
a ~
b.
C.
With the indicated AFD outside of the above required target band and with THERMAL POWER greater than or equal to 90X of RATED THERMAL POWER, within 15 minutes either:
1.
Restore the indicated AFD to within the target band limits, or 2.
Reduce THERMAL POWER to less than 90K of RATED THERMAL POWER.
With the indicated AFD outside of the above required target band for more than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of cumulative penalty deviation time during the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or outside the Acceptable Operation Limits of Figure 3.2-1 and with THERMAL POWER less than 90K but equal to or greater than 50X of RATED THERMAL POWER:
1.
Reduce THERMAL POWER to less than 50K of RATED THERMAL POWER within 30 minutes, and 2.
Reduce the Power Range Neutron Flux" High Trip Setpoints to less than or equal to 55K of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
With the indicated AFD outside of the above required target band for more than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of cumulative penalty deviation time during the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and with THERMAL POWER less than 50K but greater See Special Test Exceptions Specification
- 3. 10.2.
gSurveillance testing of the Power Range Neutron Flux Channels may be performed (below 90K of RATED THERMAL POWER) pursuant to Specification 4.,3. 1. 1 provided the indicated AFD is maintained within the Acceptable Operation Limits of Figure 3. 2-1.
A total of 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> operation may be accumulated with the AFD outside of the above required target band during testing without penalty deviation.
TURKEY POINT - UNITS 3 8( 4 3/4 2-1 AMENDMENT NOS. 150AND 145 Effective Date:
October 30, 1991