Forwards Insp Repts 50-250/91-35 & 50-251/91-35 on 910826-30 & Notice of Violation
ML17348B242
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/12/1991
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17348B243 List:
References
NUDOCS 9111220051
Download: ML17348B242 (5)


See also: IR 05000250/1991035

Text

0

November 12,

1991

Docket Nos. 50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power

and Light Company

ATTN:

Mr. J.

H. Goldberg

President - Nuclear Division

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

I

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

NRC INSPECTION

REPORT

NOS. 50-250/91-35

AND 50-251/91-35

This refers

to

the. inspection

conducted

by

M. D. Hunt of this office on

August 26-30,

1991.

The inspection

included

a review of activities authorized

,for your Turkey Point facility.

At the conclusion of the inspection,

the

findings

were

discussed

with those

members

of your staff identified in the

report.

.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

inter views with personnel,

and

observation

of

activities in progress.

Based

on the results

of this inspection,

certain of your activities

appeared

to be in violation of

NRC .requirements,

as specified- in the enclosed

Notice of

Violation (Notice).

We

are

concerned

about

the violation

because

your

environmental

qualification

program controls

allowed several

Eg documentation

files not to be current following plant change

and modification to electrical

equipment

important to safety.

You are required to respond

to this letter

and should follow the instructions

specified

in the

enclosed

Notice

when

preparing

your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

actions

you plan to prevent

recurrence.

After reviewing your response

to this

Notice, including your proposed

corrective

actions

and the results

of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the

NRC's

"Rules of Practice,"

a copy of

this letter and its enclosure will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter and the enclosed

Notices are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

Pub.

L. No. 96.511.

9111

POO.

1

PDR

ADQCK 05000250

G

PDA

Florida Power and Light Company

November 12,

1991

Should you have any questions

concerning this letter,

please

contact

us.

Sincerely,

Original signed

by

Caudle

A. Julian

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

cc w/encls:

K. N. Harris, Sr. Vice President

Nuclear Operations

P. 0.

Box 14000

Juno

Beach,

FL 33408

R.

E. Grazio, Director

Nuclear Licensing

Florida Power and Light Co.

P.

0.

Box 14000

Juno

Beach,

FL

33408-0420

T.

F. Plunkett,

Vice President

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL 33102

L.

W. Pearce,

Plant Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami, FL

33102

L.

W. Bladow

guality Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL

33102

(cc w/encls cont'd - See

page

3)

Caudle

A. Julian, Chief

.

Engineering

Branch

Division of Reactor Safety

Florida Power and Light Company

November. 12,

1991

(cc w/encls cont'd)

D. Powell, Superintendent-

Plant Licensing

Turkey Point Nuclear Plant

P,. 0.

Box 029100

Miami,

FL

33102

Harold F. Reis,

Esq.

Newman

and Holtzinger,

P.C.

1615

L Street,

NW

Washington,

D.

C.

20036

John T. Butler, Esq.

Steel,

Hector and Davis

4000 Southeast

Financial

Center

Miami,

FL

33131-2398

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee,

FL

32304

Jacob

Daniel

Nash

Office of Radiation Control

Department of Health

and

Rehabilitative Services

1317

Winewood Boulevard

Tallahssee,

FL

32399-0700

Jack

Shreve

Public Counsel

Office of the Public Counsel

c/o The Florida Lesgislature

ill West Madison Ave.,

Room 812

Tallahassee,

FL

32399-1400

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

2600 Blair Stone

Road

Tallahassee,

FL

32301

Gordon Guthrie, Director

Emergency

Management

Department of Community Affairs

2740 Centerview Drive

Tallahassee,FL

32399-2100

(cc w/encls cont'd - See

page

4)

~

i

Florida Power

and Light Company

November 12,

1991

(cc w/encls cont'd)

Joaquin Avino

County Manager of Metropolitan

Dade County

111

NW 1st Street,

29th Floor

Miami, FL

33128

bcc w/encl s:

R.

luck,

NRR

cument Control

Desk

K. Landis, RII

P.

A. Taylor, RII

C.

F. Smith, RII

Ross Butcher, Sr. Resident

Inspector

U.S. Nuclear Regulatory

Commission

P.

0.

Box 1448

Homestead,

FL

33090

RI I; DRS

D unt:er

11/g991

69~"

PATaylor

11/ i ~/91

RII:DRS

~~PA~

11/gal 91

RII: DRP

RII'BS

ym ock

KD

ndis

11/g 2/91

11/i$ /91