Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17346B055 + (ML17346B055)
- ML17346B056 + (ML17346B056)
- ML17346B061 + (ML17346B061)
- ML17346B063 + (ML17346B063)
- L-85-213, Forwards Fee for Supplemental Safety Evaluation & License Amends 99 & 93 Re Providing Info on Reanalysis of ECCS Performance Using Westinghouse Model,Per 850513 Request + (ML17346B064)
- L-85-216, Forwards Response to 850416 Request for Addl Info on 850128 & 0302 Applications to Amend Licenses DPR-31 & DPR-41, Changing Tech Specs Re Containment Sys + (ML17346B065)
- ML17346B067 + (ML17346B067)
- L-85-215, Advises That Valves MOV-750 & MOV-751 Would Be Locked Closed During Normal Plant Operation & Following LOCA by Locking Breakers for Valves Open.Procedures to Be Revised to Require Breaker for Valve MOV-751 to Be Locked Open + (ML17346B068)
- L-85-218, Forwards Addl Info Re Relief Request 3,concerning Regenerative HX Second Insp Interval Inservice Insp.Relief from Code Vol & Surface Areas Required in Performance of Ultrasonic & Surface Exam Requested + (ML17346B069)
- L-85-207, Ack Receipt of 850104 Safety Evaluation & Technical Evaluation Rept Accepting Masonry Wall Design Mods & Requesting Notification of Mod Completion,Per IE Bulletin 80-11.Battery Room Walls to Be Completed by Dec 1985 + (ML17346B070)
- L-85-225, Forwards Rev 8 to Topical QA Rept. Changes Do Not Reduce Commitments in Program Description Previously Accepted by NRC + (ML17346B074)
- ML17346B075 + (ML17346B075)
- ML17346B076 + (ML17346B076)
- L-85-227, Revised Application to Amend Licenses DPR-31 & DPR-41, Changing Tech Spec 3.3-2 Re Containment Air Lock + (ML17346B077)
- ML17346B079 + (ML17346B079)
- ML17346B080 + (ML17346B080)
- L-85-233, Responds to NRC Re Generic Ltr 83-28,Section 2.2.2 Concerning Implementation.Item Addressed in Util Re Implementation of Nutac Rept.Vendor Equipment Technical Info Program Adequate + (ML17346B081)
- ML17346B084 + (ML17346B084)
- IR 05000311/2004008 + (ML17346B086)
- IR 05000250/1985006 + (ML17346B087)
- ML17346B088 + (ML17346B088)
- IR 05000250/1985001 + (ML17346B090)
- IR 05000335/1985002 + (ML17346B091)
- ML17346B093 + (ML17346B093)
- L-85-238, Forwards Response to Generic Ltr 85-02 Re Resolution of Unresolved Safety Issues Concerning Steam Generator Tube Integrity.Recommendations on Category C-2 Steam Generator Tube Insps Will Be Submitted by 850916 + (ML17346B095)
- ML17346B097 + (ML17346B097)
- IR 05000250/1985016 + (ML17346B099)
- ML17346B100 + (ML17346B100)
- ML17346B102 + (ML17346B102)
- IR 05000250/1985009 + (ML17346B103)
- L-85-221, Forwards Response to 850502 Request for Completion of Encl 2 to Generic Ltr 85-07 Re Implementation of Integrated Schedules for Plant Mods + (ML17346B104)
- ML17346B105 + (ML17346B105)
- IR 05000250/1985015 + (ML17346B107)
- L-85-249, Advises That During Startup Testing of Two Redundant Safety Grade Channels Per Reg Guide 1.97,instruments Experienced Background Electrical Interference.Problems Resolved by Making Instrument Cable Shielding Mods & Tuning Electronics + (ML17346B108)
- ML17346B109 + (ML17346B109)
- ML17346B111 + (ML17346B111)
- ML17346B115 + (ML17346B115)
- ML17346B118 + (ML17346B118)
- L-85-308, Advises That Based on Preliminary ATWS Implementation Schedule,Mods Will Not Be Implemented by Winter 1986 for Unit 3 & Winter 1987 for Unit 4,per 10CFR50.62(d).Schedules Contingent on NRC Approval of Westinghouse Generic Design + (ML17346B120)
- L-85-306, Responds to Violations Noted in Insp Repts 50-250/85-17 & 50-251/85-17.Corrective Actions:Leaking Package Inspected & Repaired & Escorted to St Lucie.Wooden Container Suspended from Use + (ML17346B121)
- L-85-314, Application for Amends to Licenses DPR-31 & DPR-41,revising Offsite Organization & Reportable Events,Per Generic Ltr 83-43.Fee Paid + (ML17346B122)
- ML17346B123 + (ML17346B123)
- ML17346B124 + (ML17346B124)
- ML17346B125 + (ML17346B125)
- ML17346B127 + (ML17346B127)
- IR 05000250/1985022 + (ML17346B128)
- L-85-329, Informs of Planned Alternate Shutdown Procedure Implementation Per Approved Schedule in in Accordance w/10CFR50,App R Section III.L.3.Fire Watches Planned During Implementation + (ML17346B130)
- L-85-318, Responds to NRC Re Violations Noted in Insp Repts 50-250/85-09 & 50-251/85-09.Corrective Actions:Description of Existing Fastener Thread Engagement Insp Plan Encl. Results Will Be Submitted by 851122 + (ML17346B131)
- L-85-312, Documents Util Understanding That Forwarding Written Response to Insp Repts 50-250/85-13 & 50-251/85-13 by 850823 Acceptable,Per 850809 Telcon.Response Delay Caused by Need for Addl Util Internal Coordination + (ML17346B132)
- ML17346B133 + (ML17346B133)
- IR 05000250/1985023 + (ML17346B135)