ML17346B115

From kanterella
Jump to navigation Jump to search

Transmittal of Final Safety Evaluation for Areva Inc. Topical Report ANP-10300P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Transient and Accident Scenarios
ML17346B115
Person / Time
Site: PROJ0728, 99902041
Issue date: 01/05/2018
From: Dennis Morey
NRC/NRR/DLP/PLPB
To: Peters G
AREVA
Rowley J
Shared Package
ML17346B039 List:
References
CAC ME2979, EPID L-2009-TOP-0004 ANP-10300P, Rev 0
Download: ML17346B115 (3)


Text

OFFICIAL USE ONLY-PROPRIETARY INFORMATION January 5, 2018 Mr. Gary Peters, Director Licensing and Regulatory Affairs AREVA Inc.

3315 Old Forest Road Lynchburg, VA 24501

SUBJECT:

FINAL SAFETY EVALUATION FOR AREVA INC. TOPICAL REPORT ANP-10300P, REVISION 0, AURORA-B: AN EVALUATION MODEL FOR BOILING WATER REACTORS; APPLICATION TO TRANSIENT AND ACCIDENT SCENARIOS (CAC NO. ME2979/EPID: L-2009-TOP-0004)

Dear Mr. Peters:

By letter dated December 23, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML100040157), AREVA Inc. (AREVA) submitted Topical Report (TR)

ANP-10300P, Revision 0, " AURORA-B: An Evaluation Model for Boiling Water Reactors; Application to Transient and Accident Scenarios," to the U.S. Nuclear Regulatory Commission (NRC) staff for review and approval. By letter dated September 6, 2017 (ADAMS Accession No. ML17207A511), an NRC draft safety evaluation (SE) regarding our approval of TR ANP-10300P, Revision 0, was provided for your review and comment. By letter dated November 7, 2017 (ADAMS Accession No. ML17313A810), AREVA provided comments on the draft SE. The NRC staffs disposition of the AREVA comments on the draft SE are discussed in the attachment (ADAMS Accession No. ML17346B151) to the final SE enclosed with this letter.

The NRC staff has found that TR ANP-10300P, Revision 0, is acceptable for referencing in licensing applications for nuclear power plants to the extent specified and under the limitations delineated in the TR and in the enclosed final SE. The final SE defines the basis for our acceptance of the TR.

Our acceptance applies only to material provided in the subject TR. We do not intend to repeat our review of the acceptable material described in the TR. When the TR appears as a reference in licensing action requests, our review will ensure that the material presented applies to the specific plant involved. Requests for licensing actions that deviate from this TR will be subject to a plant-specific review in accordance with applicable review standards.

NOTICE: The enclosure and its attachment transmitted herewith contains Proprietary Information. When separated from the enclosure and its attachment, this transmittal document is decontrolled.

OFFICIAL USE ONLY-PROPRIETARY INFORMATION

OFFICIAL USE ONLY-PROPRIETARY INFORMATION G. Peters In accordance with the guidance provided on the NRC website, we request that AREVA publish approved proprietary and non-proprietary versions of TR ANP-10300P, Revision 0, within 3 months of receipt of this letter. The approved versions shall incorporate this letter and the enclosed final SE after the title page. Also, they must contain historical review information, including NRC requests for additional information and your responses. The approved versions shall include an -A (designating approved) following the TR identification symbol.

As an alternative to including the RAIs and RAI responses behind the title page, if changes to the TR were provided to the NRC staff to support the resolution of RAI responses, and if the NRC staff reviewed and approved those changes as described in the RAI responses, there are two ways that the accepted version can capture the RAIs:

1. The RAIs and RAI responses can be included as an Appendix to the accepted version.
2. The RAIs and RAI responses can be captured in the form of a table (inserted after the final SE) which summarizes the changes as shown in the approved version of the TR. The table should reference the specific RAIs and RAI responses which resulted in any changes, as shown in the accepted version of the TR.

If future changes to the NRCs regulatory requirements affect the acceptability of this TR, AREVA will be expected to revise the TR appropriately or justify its continued applicability for subsequent referencing. Licensees referencing this TR would be expected to justify its continued applicability or evaluate their plant using the revised TR.

Sincerely,

/RA/

Dennis C. Morey, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 728 Docket No. 99902041

Enclosure:

Final Safety Evaluation (Proprietary)

OFFICIAL USE ONLY-PROPRIETARY INFORMATION

ML17346B115 (Letter); ML17346B057 (SE); ML17346B039 (Package);

ML17346B151 (Attachment); *concurrence via e-mail NRR-106 OFFICE NRR/DLP/PLPB NRR/DLP/PLPB* NRR/DSS/SNPB NRR/DLP/PLPB NAME JRowley DHarrison RLukes DMorey DATE 12/12/17 12/28/17 1/2/18 1/5/18