Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-IV-97-058, on 971020,shutdown Expected to Be Greater than 72 H After Manual Scram Occurred.Licensee Plans Go to Mode 5 for Outage to Repair or Replace Lower Bearing for RCP Number 2B.State of Az Will Be Informed + (ML17312B736)
- IR 05000528/1997015 + (ML17312B737)
- ML17312B740 + (ML17312B740)
- ML17312B741 + (ML17312B741)
- ML17312B742 + (ML17312B742)
- ML17312B744 + (ML17312B744)
- ML17312B745 + (ML17312B745)
- ML17312B746 + (ML17312B746)
- ML17312B747 + (ML17312B747)
- ML17312B748 + (ML17312B748)
- ML17312B749 + (ML17312B749)
- ML17312B750 + (ML17312B750)
- ML17312B752 + (ML17312B752)
- ML17312B753 + (ML17312B753)
- ML17312B754 + (ML17312B754)
- ML17312B755 + (ML17312B755)
- IR 05000528/1997024 + (ML17312B757)
- ML17312B760 + (ML17312B760)
- ULNRC-06398, Special Report 2017-02: Non-Functional Seismic Instrument for Greater than 30 Days + (ML17312B761)
- ML17312B762 + (ML17312B762)
- ML17312B775 + (ML17312B775)
- ML17313A003 + (ML17313A003)
- ML17313A027 + (ML17313A027)
- ML17313A030 + (ML17313A030)
- SECY-17-0116, Staff Statement in Support of the Uncontested Hearing for Issuance of a Construction Permit for the Northwest Medical Isotopes, LLC Production Facility + (ML17313A037)
- IR 05000461/2017003 + (ML17313A039)
- IR 05000266/2017003 + (ML17313A053)
- ML17313A077 + (ML17313A077)
- ML17313A080 + (ML17313A080)
- IR 05000282/2017003 + (ML17313A084)
- ML17313A087 + (ML17313A087)
- COMSECY-17-0040, Request for Revision to Commission Tasking on Annual Assessment of the NRC Enforcement Program + (ML17313A090)
- ML17313A100 + (ML17313A100)
- ML17313A110 + (ML17313A110)
- ML17313A114 + (ML17313A114)
- ML17313A117 + (ML17313A117)
- ML17313A119 + (ML17313A119)
- 05000529/LER-1997-006, :on 971020,manual Reactor Trip Occurred Due to Vibration & Bearing Temp Increases in Reactor Coolant Pump. Caused by Failed Lower Journal Bearing.Bearing Assembly Was Disassembled,Inspected & Rebuilt + (ML17313A120)
- ML17313A121 + (ML17313A121)
- ML17313A122 + (ML17313A122)
- 05000528/LER-1997-004, Forwards LER 97-004-00 Re Inverters for Class 1E 120 Vac Vital Instrument Distribution Buses & Inverters for Class 1E 125 Vdc Buses Which Were Not in Compliance W/Seismic Design Requirements + (ML17313A123)
- ML17313A124 + (ML17313A124)
- IR 05000528/1997022 + (ML17313A126)
- ML17313A127 + (ML17313A127)
- ML17313A128 + (ML17313A128)
- ML17313A133 + (ML17313A133)
- ML17313A134 + (ML17313A134)
- ML17313A135 + (ML17313A135)
- ML17313A136 + (ML17313A136)
- ML17313A139 + (ML17313A139)
- IR 05000528/1997025 + (ML17313A142)