ML17313A136

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/97-25,50-529/97-25 & 50-530/97-25 & Nov.Violation of Concern Because Procedure Inadequacy Could Have Resulted in Lubricating Oil Collection Sys Being Unable to Perform Intended Function
ML17313A136
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/19/1997
From: Stetka T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17313A137 List:
References
50-528-97-25, 50-529-97-25, 50-530-97-25, NUDOCS 9712230152
Download: ML17313A136 (9)


See also: IR 05000528/1997025

Text

DOCKET 5

05000528

05000529.

05000530

Power

C

SUBJECT:

Forwards insp repts 50-528/97-25,50-529/97-25

E

50-530/97-25

E NOV.Violation of concern because

procedure

inadecpxacy could have resulted in lubricating oil collection

sys being unable to perform intended function.

DISTRIBUTION,CODE: IEOIF

COPIES

RECEIVED:LTR j

ENCL $

SIZE:

TITLE: General

(50 Dkt) -Insp Rept/Notice of Vi&oation Response

G

05000528

05000529 ~

05000530

R

NOTES: STANDARDIZED PLANT

Standardized plant.

Standardized plant.

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9712230152

DOC.DATE: 97/12/19

NOTARIZED: NO

ACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi

STN-50-529 Palo Verde Nuclear 'Station, Unit 2, Arizona Publi

STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi

AUTH.NAME

AUTHOR AFFILIATION

STETKA,T.F.

Region

4 (Post

820201)

RECIP.NAME

'ECIPIENT AFFILIATION

LEVINE,J.M;

Arizona Public Service

Co.

(formerly Arizona Nuclear

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

- ByZTQ

LE CENT@

NR~R DRY/PECB

NUDOCS -ABSTRACT

OGC/HDS2

EXTERNAL: LITCO BRYCE,J H

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

CLIFFORD,J

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

~

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

KCADEQ FQQ)$":.

j RPaC FCQPf Y

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

December 19, 1997

James M. Levine, Senior Vice

President, Nuclear

Arizona Public Service Company

P.O. Box 53999

Phoenix, Arizona 85072-3999

SUBJECT:

NRC INSPECTION REPORT 50-528/97-25; 50-529/97-25; 50-530/97-25 AND

NOTICE OF VIOLATION

Dear Mr. Levine:

An NRC inspection was conducted November 3-7, 1997, at your Palo Verde Nuclear Generating

Station, Units 1, 2, and 3, reactor facilities. The enclosed report presents the scope and results

of that inspection.

The overall conclusions of this inspection were discussed with Mr. Scott

Bauer of your staff on December 19, 1997.

Based on this inspection, a violation was identifie for failure to provide the appropriate

acceptance

criteria to perform an inspection of the reactor coolant pump motor lubricating oil

collection system flexible covers.

This violation is of concern because the procedure

inadequacy could have resulted in the lubricating oil collection system being unable to perform

its intended function.

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding this violation are described in detail in the enclosed report: The NRC has

concluded that information regarding the reason for the violation, the corrective actions taken to

correct the violation and prevent its recurrence, have already been adequately addressed.

Therefore, you are not required to respond to this letter unless the description therein does not

accurately reflect your corrective actions or your position.

In that case, or ifyou choose to

provide additional information, you should followthe instructions specified in the enclosed

Notice.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure, and your response will be placed in the NRC Public Document Room (PDR). To the

extent possible, your response should not include any personal privacy, proprietary, or

safeguards

information so that it can be placed in the PDR without redaction.

97i2230i52 97i2iq

PDR

ADQCK 05000528

8

PDR

-2-

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you..

Sincerely,

Thomas F. Stetka, Acting Chief

Engineering Branch

Division of Reactor Safety

Docket Nos.: 50-528; 50-529; 50-530

License Nos.: NPF-41; NPF-51; NPF-74

Enclosures:

Notice of Violation

NRC Inspection Report

~ 50-528/97-25; 50-529/97-25; 50-530/97-25

cc w/enclosures:

Mr. Steve Olea

Arizona Corporation Commission

1200 W. Washington Street

Phoenix, Arizona 85007

Douglas K. Porter, Senior Counsel

Southern California Edison Company

Law Department, Generation Resources

P.O. Box 800

Rosemead,

California 91770

Chairman

Maricopa County Board of Supervisors

301 W. Jefferson, 10th Floor

Phoenix, Arizona 85003

Aubrey V. Godwin, Director

Arizona Radiation Regulatory Agency

4814 South 40 Street

Phoenix, Arizona 85040

Arizona Public Service Company

Angela K. Krainik, Manager

Nuclear Licensing

Arizona Public Service Company

P.O. Box 52034

Phoenix, Arizona 85072-2034

John C. Horne, Vice President

Power Supply

El Paso Electric Company

2025 N. Third Street, Suite 220

Phoenix, Arizona 85004

Terry Bassham,

Esq.

General Counsel

El Paso Electric Company

123 W. Mills

EI Paso, Texas

79901

Mr. Robert Burt

Los Angeles Department of Water 8 Power

Southern California Public Power Authority

111 North Hope Street, Room 1255-B

Los Angeles, California 90051

Mr. David Summers

Public Service Company of New Mexico

414 Silver SW, ¹0604

Albuquerque, New Mexico 87102

Mr. Brian Katz

Southern California Edison Company

14300 Mesa Road, Drop D41-SONGS

San Clemente, California 92672

Mr. Robert Henry

Salt River Project

6504 East Thomas Road

Scottsdale, Arizona 85251

Arizona Public Service Company

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRS Director

DRP Director

Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS Deputy Director

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

DOCUMENT NAME:

To receive copy of document, Indicate In box: "C" "- Copy without enctosures

"E"= Copy with enctosures "N"= No copy

RIV:RI:

DPereir,

12

97

RIV:RI:E

WWagn r

12

97

C:PBF

DKirsch

D:DRS

TStetka

12/5/97

y W

12/I/97

OFFICIALRECORD COPY

s

I

Arizona Public Service Company

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRS Director

DRP Director

Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS Deputy Director

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

IIIIIIIIIIIIIIIII,IIII,IIIIIIII

IIIIIII

DOCUMENT NAME:

To receive copy of document, indicate In box: "C" = Copy without enciosures

"E" = Copy with enciosures "N"= No copy

RIV:RI:

DPereir

RIV:RI:E

WWagn r

C:PBF

DKirsch

D:DRS

TStetka

12'7

12

97

12/5/97

.y fry

12/i/97

OFFICIAL RECORD COPY