- ML17292B258 + (ML17292B258)
- ML17292B259 + (ML17292B259)
- ML17292B260 + (ML17292B260)
- GO2-98-038, WNP-2 Annual Operating Rept for 1997 + (ML17292B261)
- GO2-98-045, Forwards Copy of Performance Self-Assessment,WNP-2, Documenting Results of Assessment,Which Was Conducted 971006-31,of Key Functional Areas + (ML17292B262)
- ML17292B263 + (ML17292B263)
- ML17292B264 + (ML17292B264)
- 05000397/LER-1998-001, :on 980203,automatic Start of HPCS EDG Was Noted.Caused by Operator Error.Operations Crew Stabilized Plant at Approximately 75% Reactor Power & Investigation of Event Was Initiated + (ML17292B266)
- GO2-98-042, Forwards Proprietary Response to 980212 RAI Re License Amend Request on Min Critical Power Ratio Safety Limits.Encl Withheld,Per 10CFR2.790 + (ML17292B267)
- IR 05000397/1997018 + (ML17292B272)
- IR 05000397/1997014 + (ML17292B275)
- GO2-98-053, Submits Rept of Listed Property & Liability Insurance Coverage for WNP-2 in Force,Per 10CFR50.54(w)(3) + (ML17292B276)
- GO2-98-048, Forwards Supplemental Evaluation of Effect of Revised Safety Limit on Cycle 8 Operations at WNP-2,in Response to Two Unresolved Issues Noted in Insp Rept 50-397/97-11 + (ML17292B277)
- GO2-98-052, Responds to NRC Re Violations Noted in Insp Rept 50-397/97-13 on 970715-0802.Corrective Actions:Per Was Initiated After Unplanned Start of Reactor Recirculation Pump + (ML17292B278)
- ML17292B279 + (ML17292B279)
- GO2-98-051, Responds to NRC Re Violations Noted in Insp Rept 50-397/97-13.Corrective Actions:Performed Followup Assessment of Operability Which Determined RCIC Sys to Be Operable But Nonconforming & Upgraded RCIC Components + (ML17292B280)
- GO2-98-049, Provides Mod to 971204 Request for Amend to Licnese NPF-21, Establishing Interim SLMCPR for Siemens Power Corp ATRIUM-9X Fuel Applicable to Cycle 14 Only,As Identified by T Huang (NRR) During 980211 Site Visit + (ML17292B281)
- ML17292B282 + (ML17292B282)
- ML17292B283 + (ML17292B283)
- PNO-IV-98-012, on 980312,plant Experienced Reactor Trip as Result of Inadvertent Closure of One of Msivs.Caused by Loss of Instrument Air to Valves Actuator.Reactor Vessel Cooled Down to Facilitate Containment Entry for Investigation + (ML17292B284)
- PNO-IV-98-012A, update to 980311 Occurrence of Reactor Scram as Result of Inadvertent Closure of One of Main Steam Isolation Valves.Regioniv Special Insp Team Is Completing Charter W/Preliminary Observations & Findings + (ML17292B285)
- ML17292B290 + (ML17292B290)
- GO2-98-055, Monthly Operating Rept for Feb 1998 for WNP-2 + (ML17292B291)
- GO2-98-057, Responds to NRC Re NOV & Exercise of Enforcement Discretion in Insp Rept 50-397/96-22.Review of SEs & Associated Activities Was Completed on 980316 + (ML17292B293)
- ML17292B294 + (ML17292B294)
- ML17292B295 + (ML17292B295)
- GO2-98-060, Submits Response to Violations Noted in NRC Insp Rept 50-397/97-13.Corrective Actions:All Pertinent RCIC Components Have Been Upgraded as Necessary,W/Exception of Two Rupture Disks + (ML17292B296)
- GO2-98-059, Submits Response to Violations Noted in Insp Rept 50-397/97-13.Corrective Actions:Action Initiated to Communicate Mgt Expectations Re Extension Allowances for Corrective Action Due Dates + (ML17292B297)
- GO2-98-058, Responds to NRC Re Violations Noted in Insp Rept 50-397/97-20.Corrective Actions:Three Sealed Bags Containing High Efficiency Particulate Air Filters Were Properly Labeled as Radioactive Material Immediately After Discovery + (ML17292B304)
- ML17292B305 + (ML17292B305)
- ML17292B307 + (ML17292B307)
- IR 05000397/1997013 + (ML17292B309)
- ML17292B312 + (ML17292B312)
- ML17292B314 + (ML17292B314)
- ML17292B315 + (ML17292B315)
- IR 05000397/1997020 + (ML17292B317)
- ML17292B318 + (ML17292B318)
- IR 05000397/1996022 + (ML17292B319)
- GO2-98-065, Notifies That Sk Drinkard,License OP-42542,will No Longer Be Maintaining License in Accordance W/Util Licensed Operator Requalification Program + (ML17292B320)
- ML17292B321 + (ML17292B321)
- ML17292B323 + (ML17292B323)
- IR 05000397/1998004 + (ML17292B324)
- ML17292B326 + (ML17292B326)
- ML17292B327 + (ML17292B327)
- 05000397/LER-1998-002, :on 980311,reactor Scram & Plant Transient Occurred,Due to Failed Closed Main Steam Isolation Valve. Caused by Loss of Pneumatic Actuating Supply Pressure. Problem Evaluation Request Written for Failure of MS-V-22D + (ML17292B328)
- 05000397/LER-1998-003, :on 980311,WNP-2 Experienced Scram Signal as Result of Low Rpv.Caused by Less than post-SCRAM Operational Strategy for Resetting Scram Signal in Conditions.Changes in post-SCRAM Operational Strategy Implemented + (ML17292B329)
- ML17292B331 + (ML17292B331)
- ML17292B333 + (ML17292B333)
- ML17292B334 + (ML17292B334)
- ML17292B336 + (ML17292B336)
- GO2-98-069, Monthly Operating Rept for Mar 1998 for WNP-2 + (ML17292B337)