ML17292B334
| ML17292B334 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/16/1998 |
| From: | Poslusny C NRC (Affiliation Not Assigned) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17292B335 | List: |
| References | |
| TAC-M98096, NUDOCS 9804210484 | |
| Download: ML17292B334 (4) | |
Text
April 16, 1998 0
Mr. J. V. Parrish Chief Executive Officer Washington Public Power Supply System P.O. Box 968 (Mail Drop 1023)
Richland, Washington 99352-0968
SUBJECT:
CLOSURE OF POST-TMI COMMITMENTFOR THE WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS) NUCLEAR PROJECT NO. 2 (WNP-2)
TO REPORT BWR SAFETY RELIEF VALVEIN-SERVICE PERFORMANCE DATATO GE NUCLEAR ENERGY (TAC NO. M98096)
Dear Mr. Parrish:
By letter dated January 14, 1997, WPPSS requested the closure of the post-Three Mile Island (TMI)commitment to submit quarterly safety relief valve (SRV) in-service performance reports to GE Nuclear Energy for WNP-2.
The staff has reviewed your submittal and as discussed in the enclosed safety evaluation has found it acceptable for WPPSS to discontinue the reporting of performance data for the SRVs to GE Nuclear Energy.
Instead, WPPSS should maintain records of the in-service SRV performance at the WNP-2 site for future NRC inspections and audits. This is in accordance with the NRC's approval of a similar request made by the BWR Owners'roup dated June 25, 1996.
Ifyou have any questions concerning this action, please contact me at (301) 415-1341.
Sincerely, Original Signed By Chester Poslusny, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosure:
Safety Evaluation ccw/encl:
See next page Document Name: WN98096.LTR D STRIBUTION Docket PUBLIC PDIV-2 Reading EAdensam WBateman CPoslusny ACRS EPeyton KPerkins, WCFO RIV HWong, WCFO RIV PGwynn, RIV RWessman OFC PDIV-2 PDIV-2 EMEB NAME DATE CPoslusny EMey ~Pn 3/IV/98 3/Il /98 RW a
3 /tC/ 98 OFFICIAL RECORD COPY 98042i0484
'780416 PDR ADOCK 05000397 P
PDR q got lQ'I~A<~
i I
I I
Mr. J. V. Parrish April 16, 1998 cc w/encl:
Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352-0968 Mr. Albert E. Mouncer (Mail Drop 1396)
Chief Counsel Washington Public Power Supply System P.O, Box,968 Richland, Washington 99352-0968 Ms. Deborah J. Ross, Chairman Energy Facility Site Evaluation Council P. O. Box 43172 Olympia, Washington 98504-3172 Mr. D. W. Coleman (Mail Drop PE20)
Acting Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul Inserra (Mail Drop PE20)
Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O. Box 69 Prosser, Washington 99350-0190 Mr. Scott Boynton, Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 69 Richland, Washington 99352-0968 Mr. Perry D. Robinson, Esq.
Winston 8 Strawn 1400 L Street, N.W.
Washington, DC 20005-3502 Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352