- ML17290A470 + (ML17290A470)
- ML17290A472 + (ML17290A472)
- ML17290A474 + (ML17290A474)
- ML17290A475 + (ML17290A475)
- IR 05000397/1993014 + (ML17290A476)
- GO2-93-160, Requests Confirmation or Final Relief If Necessary Re Position That Would Exclude from 4 H Notification Requirement in 10CFR50.72(b)(2)(vi) for Situations in Which Util Required to Report Certain Min Levels of Radioactivity + (ML17290A477)
- GO2-93-138, Forwards Rev 16 to WPPSS-QA-004, Operational QA Program Description + (ML17290A478)
- ML17290A482 + (ML17290A482)
- ML17290A483 + (ML17290A483)
- 05000397/LER-1992-037-02, Forwards LER 92-037-02.Rev Provides Updated Info Re C/As for Manual Reactor Scram Due to Core Instability.Commitment to Obtain Amend to TS to Eliminate Requirements for Calculating T Deleted.Confusion Eliminated Through Trai + (ML17290A485)
- ML17290A487 + (ML17290A487)
- GO2-93-164, Revises 930413 Response to GL 92-08 Re Thermo-Lag 330-1 Fire Barriers.Schedule for Actions Necessary to Complete Activity Encl + (ML17290A489)
- 05000397/LER-1992-034, :on 920713,determined That Nonwater Tight Penetration Seals in ECCS Pump Rooms Could Result in Common Mode Failure from Flooding.Inadequate Penetration Seals in ECCS Pump Rooms Except for Door Seals Reworked + (ML17290A490)
- ML17290A491 + (ML17290A491)
- GO2-93-165, Corrects Info in Util Re Annual Reporting Requirements for Level of Financial Protection.Listed Property & Liability Insurance Coverage in Force at Facility + (ML17290A492)
- 05000397/LER-1992-034-02, Forwards LER 92-034-02.Supplemental Rept Describes Completion of Penetration Seal Rework & Changes to Flood Watch Requirements + (ML17290A494)
- GO2-93-166, Forwards Revised ISI Program Relief Requests 2-ISI-001 & 2-ISI-010 to Be Implemented During Third Insp Period of First Insp Interval.Ge Coverage Repts for R-8 & R-7 & Coverage Plot for N3 - Main Steam Also Encl + (ML17290A497)
- 05000397/LER-1993-023, :on 930605,concluded That Flexible Conduit Associated W/Pressure Switches Not Seismically Supported. Caused by Improper Construction Instructions.Walkdown of Quality Class I Racks Performed + (ML17290A499)
- 05000397/LER-1993-009, :on 930217,existence of Noncondensible Gases in Reference Leg of RPV Instrumentation Due to Design Deficiency.Procedures Developed & Revised & Evaluation Performed + (ML17290A500)
- 05000397/LER-1991-010, :on 910422,inability to Isolate Primary Containment Due to Wiring Separation Error Caused by Inadequate Work Instructions.Initiated Hourly Fire Tour for Accessible Areas + (ML17290A501)
- ML17290A504 + (ML17290A504)
- ML17290A506 + (ML17290A506)
- IR 05000397/1993007 + (ML17290A507)
- GO2-93-178, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-13.C/As:licensee Will Conduct Followup Audits No Later than 930901,assessing Plant Personnel Performance Re Surveillance Procedure Documentation & Procedure Adherence + (ML17290A508)
- ML17290A509 + (ML17290A509)
- ML17290A511 + (ML17290A511)
- ML17290A512 + (ML17290A512)
- GO2-93-176, Monthly Operating Rept for June 1993 for Wnp,Unit 2.W/ Undated Ltr + (ML17290A513)
- GO2-93-180, Application for Amend to License NPF-21,increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing Safety Relief Valve Setpoint Tolerance. Proprietary ...Power Uprate W/Extended Load... Encl + (ML17290A515)
- ML17290A518 + (ML17290A518)
- 05000397/LER-1993-024, :on 930615,ESG Actuation of Containment Instrument Air Backup Nitrogen Bottle Programmer Occurred. Caused by Personnel Error & Procedure Deficiency.Test Procedures to Be Strengthened + (ML17290A520)
- 05000397/LER-1993-025, :on 930615,Group 1 Nuclear Steam Supply Shutoff Sys Isolation Occurred During Performance of TS Surveillance Test on Turbine Throttle Valves.Caused by Procedure Deficiency.Procedure Changed + (ML17290A521)
- ML17290A522 + (ML17290A522)
- IR 05000397/1993027 + (ML17290A524)
- ML17290A525 + (ML17290A525)
- ML17290A526 + (ML17290A526)
- GO2-93-126, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-01.Corrective Actions:Per Was Written to Document Concerns Raised Re SE-V-12A & SW-V-12B + (ML17290A528)
- GO2-93-156, Special Rept:On 930503,space Frame & Attached Seismic Triaxial Peak Accelorograph (SEIS-TPA-1) Removed to Allow for Refueling of Reactor Core.Instrument Returned to Svc on 930607 + (ML17290A530)
- 05000397/LER-1993-026, :on 930619,failed to Complete Weekly Battery Surveillance Requirements within Allowed TS Interval Due to Scheduling Oversight.Initiated & Completed PPM 7.4.8.2.1.20 + (ML17290A531)
- GO2-93-188, Amends 921223 Response to Violations Noted in Insp Rept 50-397/92-35.Corrective Actions:Update to ODCM to Reflect Results of 10CFR50.59 Analysis to Permit Operation of Turbine Bldg Will Be Completed by 930831 + (ML17290A532)
- GO2-93-186, Forwards Change to ERDS Data Point Library,Consisting of Ref File Re Rx Bldg high-range Monitor + (ML17290A533)
- GO2-93-189, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-19.C/As:PPM 1.3.18 Will Be Revised to Provide Consistent Directions on How to Log Items in Sufficient Detail for Purposes of Identification + (ML17290A537)
- ML17290A538 + (ML17290A538)
- ML17290A539 + (ML17290A539)
- IR 05000397/1993022 + (ML17290A541)
- GO2-93-397, Responds to NRC Bulletin 93-003.Requests That Scheduled Date for Implementation of Bulletin Be Extended from 930730-0915 + (ML17290A544)
- GO2-93-196, Advises of Changes Util Made in Schedule to Improve Corrective Action Program.Description of Commitments & Corresponding Revised Completion Date or Completion Status Listed in Encl + (ML17290A545)
- GO2-93-193, Informs That Effective 930625,JH Swailes Assumed Responsibilities of Plant Manager at Facility.Requests That NRC Distribution List for Facility Correspondence Be Revised to Show Jh Swailes as Plant Manager + (ML17290A547)
- GO2-93-191, Application for Amend to License NPF-21,requesting Change to Refueling Platform Load Limits by Adding New Values Resulting from Installation of Upgraded Refueling Mast (GE Model NF500) + (ML17290A548)
- ML17290A549 + (ML17290A549)