Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-91-057, Requests Deferral of Remaining Annual Operator Requalification Exams in Order to Complete Listed Actions in Response to Weaknesses/Deficiencies Noted in Licensed Operator Requalification Program + (ML17286A673)
- GO2-91-054, Suppl to 910228 Application for Amend to License NPF-21, Revising Tech Spec Safety Limits for Thermal Power,High Pressure & High Flow + (ML17286A674)
- ML17286A675 + (ML17286A675)
- ML17286A676 + (ML17286A676)
- ML17286A677 + (ML17286A677)
- ML17286A678 + (ML17286A678)
- ML17286A679 + (ML17286A679)
- ML17286A680 + (ML17286A680)
- GO2-91-062, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-01 on 910122-25.Corrective Actions:Tech Spec Change Request Submitted to Remove Scram Accumulator Check Valve Surveillance & Acceptance Criteria Procedure Revised + (ML17286A681)
- ML17286A683 + (ML17286A683)
- ML17286A685 + (ML17286A685)
- ML17286A686 + (ML17286A686)
- 05000397/LER-1990-030, :on 901117,discovered That Outboard RCIC Turbine Steam Supply Isolation valve,RCIC-V-8 Returned to Svc W/Unacceptable Stroke Time Due to Inadequate Procedures. Valve RCIC-V-8 Stroke Time Changed + (ML17286A687)
- GO2-91-064, Application for Amend to License NPF-21,requesting Battery Load Profiles Utilized to Verify Operability Re Tech Spec Surveillance Requirements 4.8.2.1.d.2 Be Relocated to FSAR + (ML17286A688)
- ML17286A689 + (ML17286A689)
- ML17286A690 + (ML17286A690)
- GO2-91-066, Suppls 880208 Response to Generic Ltr 87-05 Re Assessment of Measures to Mitigate &/Or Identify Potential Degradation of Containment.Weekly Surveillance on Six of Eight Sand Pocket Drains Will Be Discontinued + (ML17286A691)
- GO2-91-065, Forwards Remediation Program Outline for Control Room Supervisor on Crew & Shift Manager on Crew B + (ML17286A692)
- ML17286A693 + (ML17286A693)
- ML17286A694 + (ML17286A694)
- ML17286A695 + (ML17286A695)
- ML17286A696 + (ML17286A696)
- GO2-91-072, Comments on Reactor Operator Written Exam Administered on 910405 & Advises of Two Correct Answers for Question 089 + (ML17286A697)
- GO2-91-067, Lists Actions to Be Taken During Refueling Outage,Scheduled to Begin on 910413,to Ensure Safety of Plant Operations.Four Shift Rotations Will Be Utilized During Outage While Shutdown in Operational Modes 4 & 5 + (ML17286A698)
- ML17286A699 + (ML17286A699)
- ML17286A706 + (ML17286A706)
- IR 05000397/1990011 + (ML17286A710)
- ML17286A713 + (ML17286A713)
- GO2-91-081, Forwards Amend to Tech Specs Providing Additions &/Or Deletions to Paragraph 6.9.3.2 of Insert B,Including Explanation of Reasons for Each Change,Per NRC Project Manager Request + (ML17286A714)
- ML17286A716 + (ML17286A716)
- ML17286A717 + (ML17286A717)
- GO2-91-068, Monthly Operating Rept for Mar 1991 for Washington Nuclear Plant 2 + (ML17286A718)
- ML17286A720 + (ML17286A720)
- IR 05000397/1991009 + (ML17286A723)
- GO2-91-083, Submits Addl Info Re 910228 Application for Amend to License NPF-21,changing Tech Spec Safety Limit for Thermal Power, High Pressure & High Flow + (ML17286A726)
- GO2-91-074, Advises of Delay of Up to 1 Wk for Beginning of 1991 Maint & Refueling Outage.Delay Necessitated by Request from BPA That Unit Remain on Line Due to Regional Power Needs. Shutdown Currently Scheduled for week-end of 910419 + (ML17286A727)
- ML17286A728 + (ML17286A728)
- ML17286A730 + (ML17286A730)
- IR 05000397/1991007 + (ML17286A731)
- 05000397/LER-1990-022, :on 900930,pressure Decrease Occurred in Containment Instrument Air Sys When Nitrogen Cryogenic Tank Was Inadvertently Depleted.Containment Nitrogen Inerting Procedures PPM 2.3.1 & 2.3.7 Revised + (ML17286A732)
- ML17286A733 + (ML17286A733)
- ML17286A734 + (ML17286A734)
- 05000397/LER-1991-004, :on 910328,two Deficiencies Noted in Thermolog Application on Critical Cable Tray Running Through Div 1 Area.Caused by Inadequate Installation of Thermolog.Fire Tour of Cable Spreading Room Retained + (ML17286A736)
- ML17286A738 + (ML17286A738)
- IR 05000397/1991004 + (ML17286A740)
- ML17286A743 + (ML17286A743)
- ML17286A745 + (ML17286A745)
- ML17286A746 + (ML17286A746)
- GO2-91-092, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-07.Corrective Actions:On 910327,application for Registration as User of Model Nupac Cask 10-142 Submitted to NRC & Radwaste Shipping Procedures Will Be Revised + (ML17286A747)
- 05000397/LER-1991-008, :on 910416,reactor Declared in Mode 5 (Refueling) W/Average Reactor Coolant Temp of 140 F.Caused by Less than Adequate Procedures.Temp Reduced & Upper Temp Limits Incorporated Into Plant Procedures + (ML17286A748)
- 05000397/LER-1991-009, :on 910417,ESF Actuation & RWCU Isolation Occurred When Electricians Cut Wires to Plug of Wind Direction Recorder,Causing Voltage Drop.Caused by Equipment Installation Error.Wires Reversed + (ML17286A749)