Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000397/LER-1989-039, :on 890914,discovered Three Discrepancies W/ Current Configuration of Reactor Bldg Exhaust Air Radiation Monitoring Sys That Do Not Satisfy Design Basis Requirements + (ML17285A790)
- ML17285A794 + (ML17285A794)
- ML17285A795 + (ML17285A795)
- ML17285A797 + (ML17285A797)
- IR 05000397/1989023 + (ML17285A799)
- ML17285A800 + (ML17285A800)
- ML17285A803 + (ML17285A803)
- IR 05000397/1989026 + (ML17285A805)
- GO2-89-185, Responds to Request for Info on Environ Qualification of Taped Electrical Splices.Scotch Tapes Allowed by Electrical Test Guide Included Scotch 33,23 & 70 + (ML17285A808)
- GO2-89-182, Forwards Amend 40 to FSAR for Washington Nuclear Plant 2. Util Did Not Have Time to Revise Plant Controlled Drawings 7.3-18e Through 7.3-18j + (ML17285A809)
- ML17285A810 + (ML17285A810)
- ML17285A813 + (ML17285A813)
- IR 05000397/1989029 + (ML17285A815)
- ML17285A816 + (ML17285A816)
- IR 05000397/1989028 + (ML17285A818)
- GO2-89-199, Provides Addl Info Re Clarifications Provided in NRC Positions 4 & 5 of Suppl 1 of Bulletin 88-010, Nonconforming Molded Case Circuit Breakers. Nontraceable Circuit Breakers Reevaluated for nonsafety-related Use + (ML17285A819)
- GO2-89-183, Forwards Status Rept on SALP Board Recommendations Covering Period June 1988 - May 1989.Effectiveness Review Established to Provide Independent Assessment of Effectiveness of Util Corrective Actions + (ML17285A823)
- GO2-89-188, Responds to NRC Issuance of Amend 74 to License NPF-21 Re Isolation Provided Remote Intakes of Control Room HVAC Sys. Procedure Deviations Reviewed & Approved by Plant Operations Committee on 891006 Prior to Implementation of Amend + (ML17285A824)
- GO2-89-204, Forwards Response to NRC Re Violation Noted in Insp Rept 50-397/89-23 & Assessment of Issues.Corrective Actions:Violation Discussed Extensively During Shop Meetings & Shop Mgt Structure Reorganized + (ML17285A825)
- GO2-89-200, Application for Amend to License NPF-21,revising Tech Spec 4.0.2 to Remove 3.25 Time Interval Limit for Surveillance to Enhance Plant Safety & Decrease Administrative Burden,Per Generic Ltr 89-14 + (ML17285A826)
- ML17285A827 + (ML17285A827)
- ML17285A828 + (ML17285A828)
- GO2-89-201, Application for Amend to License NPF-21,revising Tech Spec 3.4.6.1 & Supporting Bases Resulting from Implementation of Reg Guide 1.99,per Generic Ltr 88-11, NRC Position on Radiation Embrittlement of Reactor Vessel Matls.. + (ML17285A829)
- ML17285A830 + (ML17285A830)
- ML17285A831 + (ML17285A831)
- ML17285A832 + (ML17285A832)
- ML17285A835 + (ML17285A835)
- ML17285A837 + (ML17285A837)
- IR 05000266/2017502 + (ML17285A838)
- ML17285A839 + (ML17285A839)
- ML17285A840 + (ML17285A840)
- ML17285A841 + (ML17285A841)
- GO2-89-202, Responds to NRC 890821 & 0728 Ltrs Re Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-13.Completion Dates Revised.Review of Work Practices Will Be Done by 900201 & single-train Sys Lesson Plans to Be Complete by 891130 + (ML17285A842)
- GO2-89-203, Responds to Generic Ltr 88-20,Suppl 1 Re Individual Plant Exam.Pra Will Be Completed to Level II as Described in NUREG/CR-2300 & Focused or Modified Only to Extent That NRC Concerns Addressed + (ML17285A843)
- ML17285A844 + (ML17285A844)
- GO2-89-132, Forwards Scenario Packet for 1989 Exercise for Review & Approval.Hardware & Software Mod Necessary for Appropriate Level of Effectiveness.W/O Encl + (ML17285A845)
- GO2-89-205, Responds to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Safety Sys Functional Insp Including Elements of Action IV Will Not Be Completed Until Dec 1990 + (ML17285A846)
- GO2-89-206, Responds to NRC Re Violations Noted in Insp Rept 50-397/89-28.Corrective Actions:Current Commercial Grade Procurement Practices Upgraded to Meet NCIG-07 Stds Ahead of 900101 Target Schedule + (ML17285A847)
- ML17285A848 + (ML17285A848)
- ML17285A849 + (ML17285A849)
- GO2-89-207, Confirms That Listed Info Provided to NRC Resident Inspector on 891109 Re Fire Protection Insp,Per RP Zimmerman + (ML17285A850)
- ML17285A851 + (ML17285A851)
- ML17285A853 + (ML17285A853)
- ML17285A855 + (ML17285A855)
- GO2-89-210, Informs of Util Intent to Defer Spring 1990 Low Pressure Turbine Changeout/Insp Schedule.Start of 1991 Outage Planned for 910415,representing Operation for 55.8% of Time to Reach One Half of Critical Flaw Size + (ML17285A857)
- ML17285A858 + (ML17285A858)
- IR 05000397/1989027 + (ML17285A860)
- ML17285A863 + (ML17285A863)
- GO2-89-216, Discusses 891109 Telcon Re Unreviewed Safety Question Re Standby Gas Treatment Sys.Engineering Analyses Ongoing to Determine Suitable Modeling Techniques & Assumptions That Will Be Used to Establish Revised Design Basis + (ML17285A864)
- GO2-89-219, Provides Guarantee of Payment of Deferred Premiums Per 10CFR140.21.Util Obtains Revenue from Unit 2 by Selling Capability of Plant to Bpa.Opinion of BPA Re Obligation to Pay Satisfies Requirements of 10CFR140.21(f) + (ML17285A865)
- ML17285A866 + (ML17285A866)