Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17279B064 + (ML17279B064)
- IR 05000397/1988013 + (ML17279B066)
- GO2-88-121, Informs That Meeting Stipulated Date for Response to Request for Info Not Possible.Info Will Be Submitted by 880624 Per 880517 Telcon W/Rb Samworth & Pl Powell + (ML17279B068)
- ML17279B070 + (ML17279B070)
- ML17279B075 + (ML17279B075)
- ML17279B079 + (ML17279B079)
- ML17279B082 + (ML17279B082)
- IR 05000397/1988006 + (ML17279B085)
- ML17279B087 + (ML17279B087)
- 05000397/LER-1988-010, :on 880430,nuclear Steam Supply Shutoff Sys Group 1 Isolation Occurred.Caused by Low Pressure in Main Steamlines W/Reactor Mode Switch in Run Position.Valve RFW-FCV-10B Repaired + (ML17279B089)
- 05000397/LER-1988-011-02, :on 880501,reactor Protection Sys Actuation Occurred as Result of Reactor Pressure Vessel Low Water of +13 Inches.Caused by Personnel Error & Inadequate Design. Individual Involved Counseled + (ML17279B090)
- GO2-88-131, Responds to NRC 880527 Request for Addl Info Re Violations Noted in Insp Rept 50-397/88-02.Details of Overall Assessment of Plant Quality & Program Changes to Improve Quality of Design Mods Will Be Provided at 880607 Meeting + (ML17279B091)
- GO2-88-136, Informs That Calculation Analyzing Structural Integrity of Specific Support Steel Configurations for Instrument Sensing Lines Rescheduled for Completion from 880515 to 880715 Due to Unavailability of Supporting Resources + (ML17279B093)
- ML17279B096 + (ML17279B096)
- 05000397/LER-1988-012, :on 880606,potential Existence of Unmonitored Radiological Effluent Release Path During Certain Emergency Conditions Determined.Cause Unknown.Fan Disabled.Part 21 Related + (ML17279B097)
- ML17279B099 + (ML17279B099)
- ML17279B100 + (ML17279B100)
- 05000397/LER-1988-013-01, :on 880512 & 13,loss of Power Occurred on Reactor Protection Sys (Rps).Caused by phase-to-ground Faults Due to Lightning.Rps Alternate Supply Electrical Protection Assembly Breaker & Logic Reset + (ML17279B105)
- ML17279B110 + (ML17279B110)
- IR 05000397/1988018 + (ML17279B112)
- ML17279B113 + (ML17279B113)
- ML17279B115 + (ML17279B115)
- 05000397/LER-1988-015, :on 880515,loss of Power to Reactor Protection Sys (RPS) Ocurred Due to Flooding of Reactor Cavity.Caused by Inadvertent Removal of Power to MC-7A.RPS Switched to Alternate Power Supply & RHR Cooling Restored + (ML17279B117)
- 05000397/LER-1988-016, :on 880518,reactor Protection Sys Actuation Ocurred.Caused by Error in Plant Design.Event Discussed in Mechanics Shop Meeting & Article Describing Event to Be Included in Prefuelling Outage Bulletin + (ML17279B118)
- ML17279B119 + (ML17279B119)
- ML17279B121 + (ML17279B121)
- ML17279B122 + (ML17279B122)
- ML17279B124 + (ML17279B124)
- ML17279B139 + (ML17279B139)
- ML17279B140 + (ML17279B140)
- ML17279B142 + (ML17279B142)
- ML17279B143 + (ML17279B143)
- SECY-18-0015, Enclosure 3 - Outreach and Summary of Public Comments + (ML17279B144)
- ML17279B145 + (ML17279B145)
- ML17279B177 + (ML17279B177)
- 05000400/LER-1987-032, :on 870602,radiation Monitor REM-21WL-3541 Sample Chamber Instead of REM-21WS-354 Drained for Disconnection Leaving Monitor Inoperable.Caused by Personnel Error.Procedure HPP-495 Prepared + (ML17279B178)
- B12671, Provides Results of Evaluation & Status of Implementation Plan Re Kaman Monitors,Per Insp Rept.Util Has Determined Not to Install Second Kaman Monitor Nor Relocate First Monitor Since Commitment to Install Second Not Necessary + (ML17279B181)
- ML17279B195 + (ML17279B195)
- ML17279B196 + (ML17279B196)
- ML17279B197 + (ML17279B197)
- ML17279B198 + (ML17279B198)
- ML17279B200 + (ML17279B200)
- ML17279B201 + (ML17279B201)
- ML17279B202 + (ML17279B202)
- ML17279B204 + (ML17279B204)
- 05000400/LER-1988-006, :on 880208,emergency Svc Water Sys Declared Inoperable.Caused by Isolation Valve Failures.Valves Repaired & Retested.On 880212,after Concern Raised,Manual Valve Closed,Pending Permanent Design Change + (ML17279B205)
- BYRON 2017-0098, Cycle 21 Core Operating Limits Report + (ML17282A002)
- 05000341/LER-1917-004, Regarding Inadequate Procedural Guidance for Residual Heat Removal Complex Ventilation Systems Leads to Condition Prohibited by Technical Specifications and Loss of Safety Function + (ML17282A004)
- NRC-17-0069, Notice of Organization Change - Senior Vice President and Chief Nuclear Officer + (ML17282A009)
- IR 05000313/2017012 + (ML17282A018)
- 05000387/LER-1917-007, Regarding Secondary Containment Declared Inoperable Due to Supply Air Flow + (ML17282A019)