Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17279A565 + (ML17279A565)
- ML17279A566 + (ML17279A566)
- ML17279A567 + (ML17279A567)
- 05000397/LER-1987-026, :on 870824,during NRC Safety Sys Functional Insp,Determined That Table of Diesel Fuel Vs Tank Dipstick Level for Each Diesel Oil Storage Tank in Error.Caused by Inadequate Process Control of Plant Setpoints + (ML17279A569)
- GO2-87-253, Responds to NRC Re Violations Noted in Insp Rept 50-397/87-24.Corrective Actions:Outside Radioactive Matl Storage Area Inspected by Health Physics Personnel on Weekly Basis + (ML17279A570)
- ML17279A571 + (ML17279A571)
- ML17279A572 + (ML17279A572)
- IR 05000397/1987025 + (ML17279A574)
- 05000397/LER-1987-027, :on 870831,APRM Calibr from Heat Balance Not Completed within Required Time Limits.Caused by Personnel Error.Aprm Calibr from Heat Balance Surveillance Performed on 870901 + (ML17279A575)
- GO2-87-256, Withdraws Request for Amend to License NPF-21,changing Tech Spec Section 4.6.4.1 Re Surveillance Frequency for Chamber Drywell Vacuum Breaker Operability Demonstration from 31 to 92 Days to Allow Util to Concentrate on Other Requests + (ML17279A576)
- ML17279A577 + (ML17279A577)
- ML17279A578 + (ML17279A578)
- IR 05000397/1987021 + (ML17279A580)
- GO2-87-257, Reactor Containment Bldg Integrated Leak Rate Test + (ML17279A583)
- GO2-87-258, Withdraws 850220 Request for Exemption from LER Reporting Requirements for Chlorine Monitor Tape Depletion & Spurious High Delta Flow.Exemption No Longer Necessary + (ML17279A585)
- GO2-87-265, Application for Amend to License NPF-21,adding Note to Table 3.3.7.5-1 to Allow Single Acoustic Monitor to Be Inoperable Until Plant Shuts Down for Next Scheduled Refueling Outage or Outage of Sufficient Duration to Effect Repair.Fee Paid + (ML17279A588)
- ML17279A589 + (ML17279A589)
- ML17279A590 + (ML17279A590)
- GO2-87-262, Forwards Rev 3b to Pump & Valve Inservice Test Program Plan. Rev Incorporates Changes in Plan Due to Recent Design Changes to Plant,Including Info Available as of 870930.Fee Paid + (ML17279A591)
- ML17279A592 + (ML17279A592)
- ML17279A593 + (ML17279A593)
- 05000397/LER-1987-029, :on 870916,discovered Plant Tech Spec fire- Rated Floor Penetration Impaired Since 860510.Caused by Inadequate Training on Fire Protection Barrier Identification.Training Provided to Staff + (ML17279A594)
- 05000397/LER-1987-028, :on 870916,inadvertent ESF Actuation Occurred When Leak Detection Sys Temp Monitoring Unit Failed Causing Nuclear Steam Supply Shutoff Sys Group 8 Isolation.Caused by Component Failure.Isolation Logic Reset + (ML17279A595)
- ML17279A596 + (ML17279A596)
- IR 05000397/1987024 + (ML17279A604)
- ML17279A605 + (ML17279A605)
- GO2-87-269, Revises Schedule Provided in Listed Ref Based on Discovery, During 1987 Insp,Of Crack in Low Pressure Turbine 1 + (ML17279A611)
- ML17279A612 + (ML17279A612)
- ML17279A614 + (ML17279A614)
- IR 05000397/1987026 + (ML17279A615)
- ML17279A617 + (ML17279A617)
- IR 05000397/1987020 + (ML17279A619)
- ML17279A620 + (ML17279A620)
- 05000397/LER-1987-025, :on 870808,ESF Isolations & Actuations Occurred.Caused by Spurious Trip of Breaker Due to Oxide Formation on Coil Plunger End of Undervoltage Relay Coil. Breakers Replaced + (ML17279A621)
- ML17279A623 + (ML17279A623)
- ML17279A624 + (ML17279A624)
- ML17279A625 + (ML17279A625)
- GO2-87-273, Responds to NRC Re Violations Noted in Insp Rept 50-397/87-26.Corrective Actions:On 870901,util Submitted Request for Amend to Tech Specs (Table 3.3.2-2) to Raise Main Steam Tunnel Temp Trip Setpoint to 164 F + (ML17279A637)
- GO2-87-275, Application for Amend to License NPF-21,changing Tech Spec Page 3/4 3-12 Correcting Inaccuracies/Inconsistencies in Items 1.d,1.c.3 & 1.e.Fee Paid + (ML17279A638)
- ML17279A639 + (ML17279A639)
- ML17279A641 + (ML17279A641)
- GO2-86-076, Application for Amend to License NPF-21,modifying Tech Spec 3/4.3.8 to Revise Turbine Valve Test Interval from Weekly to Monthly.Fee Paid + (ML17279A642)
- ML17279A644 + (ML17279A644)
- ML17279A645 + (ML17279A645)
- ML17279A648 + (ML17279A648)
- GO2-86-370, Forwards XN-NF-85-138(P), LOCA Break Spectrum Analysis for BWR 5 & Affidavit for Withholding,In Support of Request for Amend to Tech Specs Re Cycle 2 Reload.W/O Rept + (ML17279A649)
- GO2-87-278, Application for Amend to License NPF-21,modifying Snubber Functional Testing Sampling Plans,Per Guidelines of Draft Ansi/Asme - OM-4 Document, Exam & Performance Testing of Nuclear Power Plant Dynamic Restraints. Fee Paid + (ML17279A658)
- ML17279A659 + (ML17279A659)
- ML17279A660 + (ML17279A660)
- ML17279A662 + (ML17279A662)
- ML17279A665 + (ML17279A665)