Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17275A541 + (ML17275A541)
- ML17275A542 + (ML17275A542)
- ML17275A543 + (ML17275A543)
- ML17275A544 + (ML17275A544)
- GO2-80-184, Deficiency Rept Re Possible Inoperability of Borg-Warner Valves W/Limitorque Series Smc Operators.Identified Valves Will Be Reworked by Thread Staking Procedure.Schedule to Be Provided After Labor Negotiations + (ML17275A545)
- GO2-80-185, Deficiency Rept Re Battery Charger Capacitor Failure. Condition Not Reportable Under 10CFR50.55e.Capacitors Exceeded Recommended shelf-life & Were Not Reformed Prior to Being Placed Into Svc.Procedures Will Be Revised + (ML17275A546)
- GO2-80-165, Forwards Revisions to Electrical,Instrumentation & Control Drawings Listed in Section 1.7 of Fsar.Amend 12 Will Reflect Revisions.W/O Encl + (ML17275A547)
- ML17275A548 + (ML17275A548)
- IR 05000397/1980009 + (ML17275A550)
- ML17275A551 + (ML17275A551)
- ML17275A552 + (ML17275A552)
- ML17275A553 + (ML17275A553)
- ML17275A554 + (ML17275A554)
- GO2-80-172, Forwards SRV Loads - Improved Definition & Application Methodology for Mark II Containments, Prepared by Burns & Roe,Inc.Rept Withheld (Ref 10CFR2.790) + (ML17275A557)
- ML17275A560 + (ML17275A560)
- ML17275A562 + (ML17275A562)
- ML17275A563 + (ML17275A563)
- GO2-80-190, Requests Meeting on 800918 W/Instrumentation & Controls Sys Branch & Reactor Sys Branch to Discuss Concerns Before Contract Expiration on 800930 + (ML17275A564)
- ML17275A565 + (ML17275A565)
- GO2-80-171, Forwards Updated Response to IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. W/O Encl.Final Response Will Be Issued in First Quarter 1981 + (ML17275A567)
- ML17275A568 + (ML17275A568)
- ML17275A570 + (ML17275A570)
- ML17275A573 + (ML17275A573)
- GO2-80-170, Forwards Amend 10 to Fsar.Affidavit of Distribution Will Be Furnished within 10 Days of Filing.Affidavit & Burns & Roe Errata Sheet Encl + (ML17275A575)
- ML17275A577 + (ML17275A577)
- ML17275A578 + (ML17275A578)
- ML17275A580 + (ML17275A580)
- ML17275A581 + (ML17275A581)
- GO2-80-189, Responds to IE Bulletin 80-19.No mercury-wetted Matrix Relays Used in Reactor Protective Sys or Any safety-related Sys + (ML17275A582)
- ML17275A583 + (ML17275A583)
- ML17275A585 + (ML17275A585)
- IR 05000397/1980012 + (ML17275A587)
- IR 05000397/1980011 + (ML17275A588)
- ML17275A589 + (ML17275A589)
- GO2-80-198, Forwards Util 800910 Transmittal Ltr & Certificate of Svc for Amend 10 to FSAR + (ML17275A590)
- GO2-80-174, Responds to IE Bulletin 79-03A, Longitudinal Weld Defects in ASME SA-312,Type 304 Stainless Steel Pipe. Two Contracts Identified Where Matl May Be Used.Matl List Requested from Contractors + (ML17275A591)
- ML17275A592 + (ML17275A592)
- ML17275A595 + (ML17275A595)
- ML17275A602 + (ML17275A602)
- ML17275A603 + (ML17275A603)
- GO2-80-203, Forwards Oath of Affirmation Inadvertently Omitted from Dl Renberger to Bj Youngblood + (ML17275A604)
- GO2-80-208, Deficiency Rept Re Power Piping Co Beam attachment,HS-142, Used in Rigid Sway Brace Assemblies Supplied W/Undersized Welds.Caused by Bracket Design Deficiency.Stop Work Order Issued to All Contractors Installing Subj Brackets + (ML17275A605)
- GO2-80-202, Deficiency Rept Re Large Diameter Piping Found to Have Less than ASME Code Required Min Wall Thickness.Caused by Overgrinding While Preparing Weld Profiles for ASME Section 11 Inservice Insp.Contractors to Revise Procedures + (ML17275A607)
- ML17275A611 + (ML17275A611)
- ML17275A612 + (ML17275A612)
- GO2-80-210, Confirms 800930 & 1001 Meeting Schedules W/Reactor Sys Branch & Structural Engineering Branch,Respectively,Re Sacrificial Shield Wall at Facility + (ML17275A613)
- GO2-80-212, Deficiency Rept Re Lack of Installation Documentation for Class IE Cables in Main Control Room Raceways.Evaluation Revealed Inadequate Insp Criteria & QA Program for Installation of Electrical Cables.Procedures Being Revised + (ML17275A614)
- ML17275A615 + (ML17275A615)
- GO2-80-211, Deficiency Rept Re Primary Containment Pressure Monitoring Instrumentation Sensing Line Routing to Initiate Eccs.Ped 220-I-324 & -329 Issued,Reassigning Instrumentation Sensing Lines to Penetrations Below Instrument Rack Elevation + (ML17275A616)
- ML17275A617 + (ML17275A617)
- GO2-80-215, Requests Addl NRC Branch Reviews Required on Util Safety Relief Valve Rept.Potential Need Exists for Review of Refinements to Generic Mark II Condensation Oscillation Load or Alternative Load Definition & Methodology + (ML17275A620)