Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000335/LER-1996-001-02, :on 960219,control Room Emergency Ventilation Sys Inoperable Due to Improper Sys Configuration Occurred. Caused by Inadequate Guidance & Work Controls.Cr Boundary Reviewed + (ML17228B425)
- ML17228B426 + (ML17228B426)
- ML17228B428 + (ML17228B428)
- ML17228B429 + (ML17228B429)
- ML17228B430 + (ML17228B430)
- ML17228B431 + (ML17228B431)
- ML17228B433 + (ML17228B433)
- 05000335/LER-1996-002-01, :on 960222,control Element Assembly Dropped on Unit 1 During Periodic Testing.Caused by Failed Silicon Control Rectifier in Upper Gripper Power Switch Module.Power Switch Modules Replaced + (ML17228B434)
- ML17228B436 + (ML17228B436)
- ML17228B437 + (ML17228B437)
- ML17228B438 + (ML17228B438)
- 05000335/LER-1996-003-01, :on 960224,containment Particulate & Gaseous Monitor Was OOS & Resulted in Condition Prohibited by TS Due to Personnel Error.Capgm Was Placed Back in Svc + (ML17228B439)
- PNO-II-96-023, on 960401,unusual Event Declared & Terminated Due to Identified RCS Leakage in Excess of TS Limits + (ML17228B440)
- 05000335/LER-1996-004-01, :on 960227,inadvertent Manual Start of EDG 1A Initiated Due to Personnel Error.Procedure Change Initiated for Administrative Procedure 0010142,to Include EDG Control Cabinet + (ML17228B441)
- ML17228B445 + (ML17228B445)
- L-96-077, Forwards Summary Rept of Cycle 9 Plant Startup & Power Escalation Testing + (ML17228B447)
- ML17228B448 + (ML17228B448)
- ML17228B449 + (ML17228B449)
- ML17228B450 + (ML17228B450)
- ML17228B452 + (ML17228B452)
- ML17228B453 + (ML17228B453)
- ML17228B456 + (ML17228B456)
- ML17228B457 + (ML17228B457)
- ML17228B458 + (ML17228B458)
- ML17228B459 + (ML17228B459)
- ML17228B460 + (ML17228B460)
- ML17228B461 + (ML17228B461)
- ML17228B462 + (ML17228B462)
- ML17228B465 + (ML17228B465)
- ML17228B466 + (ML17228B466)
- ML17228B467 + (ML17228B467)
- ML17228B468 + (ML17228B468)
- ML17228B469 + (ML17228B469)
- ML17228B470 + (ML17228B470)
- IR 05000335/1996300 + (ML17228B472)
- ML17228B473 + (ML17228B473)
- ML17228B474 + (ML17228B474)
- ML17228B475 + (ML17228B475)
- L-96-109, Forwards St Lucie Nuclear Plant Status Meeting for Units 1 & 2 + (ML17228B476)
- ML17228B477 + (ML17228B477)
- ML17228B478 + (ML17228B478)
- L-96-113, Submits Planned Refueling Outage SG Insp Activities for Unit 1 + (ML17228B479)
- ML17228B480 + (ML17228B480)
- ML17228B482 + (ML17228B482)
- ML17228B484 + (ML17228B484)
- ML17228B485 + (ML17228B485)
- ML17228B487 + (ML17228B487)
- ML17228B488 + (ML17228B488)
- L-96-129, Forwards Supplemental Info Re SG Tube Insp for Unit 1 + (ML17228B489)
- ML17228B490 + (ML17228B490)
- ML17228B492 + (ML17228B492)