ML17228B459

From kanterella
Jump to navigation Jump to search
Forwards Form NIS-1 Owners Data Rept for Inservice Insps, for 950325
ML17228B459
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/01/1996
From: Bohlke W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228B460 List:
References
L-96-72, NUDOCS 9604150123
Download: ML17228B459 (2)


Text

CATEGORY 1 REGULAT(.. INFORMA ION DISTRIBUTION SYSTEM (RIDS)

ACCESSION. NBR:96041501-23 , DOC.DATE: 96/04/01 NOTARIZED: NO DOCKET FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BOHLKE,W.H. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Br~nch (Document Control Desk) g~p~l5 SUBJEC".'. Forwards form NIS-1 "Owners Data pept for Inservice insps,"-

for 950325.

DISTR'BUTION CODE: R047D COPIES. RECEIVED:LTR l ENCL I SIZE: 2 TITLE: OR Subm.'Ital: Inservice/Testing/Relief from ASME Code GL-89-04 .

T NOTES:

E RECIP ENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1. LA 1 1 PD2-1 PD 1 l NORRIS i J 1 1 INTERNAL: 6 0 AEOD/SPD/RAB 1 1 LE CE 01 1 1 NRR/DE/ECGB 1 1 PR EMCB 1 1 NRR/DE/EMEB 1 1

,ZNUDOCS-ABSTRACT '1 1 OGC/HDS3 1 0 RES/DET/EMMEB 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 1 NRC PDR 1 1 D

U E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL '4

0 Florida Power & Light Company, P.O. Box 128 Fort Pierce FL 34854-0128 5-96-70 April 1, 1996 10 CFR 50.55a 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 2 Docket No. 50-389 Fall 1995 Refueling Outage In accordance with Article IWA-6000 of ASME Section XI, enclosed is the In-Service-Inspection (ISI) Summary Report for St. Lucie Unit 2 Fall 1995 refueling outage (SL2-9). IWA-6230 requires the report to be submitted to the authority having jurisdiction within 90 days of completing the in-service-inspection conducted during the outage.

Included with the NIS-1 Report are several attachments that include the 1995 Eddy Current Summary Report, 1995 Outage Snubber Functional Testing Summary Report, and the NIS-2 Owner's Reports for Repairs and Replacements performed'since the preceding summary report submittal.

The Eddy Current Summary Report provides the information required by Sections 4.4.5.5.b and 6.9.2 of the St. Lucie Unit 2 Technical Specifications (TS). The TS requires the submittal of the Steam Generator Tube In-Service-Inspection Special Report within 12 months of completing the tube inspection.

Should there be any questions, please contact us.

Very truly yours, W.H. Bo lke Vice President St. Lucie Plant WHB/GRM Enclosure cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC

~ q.A Ct 9604i50i23 96040i PDR ADQCK 05000389' PDR ok%

an FPL Group company