ML17228B457

From kanterella
Jump to navigation Jump to search
Corrects Discussing Insp Conducted on 960205-09. Facility Name Listed Incorrectly on First Paragraph of Transmitted Ltr.St Lucie,Correct Facility Name
ML17228B457
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/18/1996
From: Barr K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Plunkett T
FLORIDA POWER & LIGHT CO.
Shared Package
ML17228B455 List:
References
NUDOCS 9604100103
Download: ML17228B457 (1)


Text

Harch 18, 1996 Florida Power and Light Company ATTN:

Hr. T.

F. Plunkett President

- Nuclear Division P. 0.

Box 14000 Juno

Beach, FL 33408-0420

SUBJECT:

NRC INSPECTION REPORT NO. 50-335/96-02 AND 50-389/96-02

Dear Hr. Plunkett:

This refers to the inspection conducted on February 5-9, 1996, at the St.

Lucie facility.

The purpose of the inspection was to determine whether activities authorized'by the license were conducted safely and in accordance with NRC requirements.

At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the report.

Areas examined during the inspection are identified in the report.

Within these

areas, the inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observation of activities in progress.

Within the scope of the inspection, violations or deviations were not identified.

In accordance with 10 CFR 2.790, of the NRC's "Rules of Practice,"

a copy of this letter will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (Original signed by K, p. Barr) a Docket Nos.

50-335, 50-389 License Nos.

NPF-4, NPF-7

Enclosure:

NRC Inspection Report cc w/encl:

(See page 2)

Kenneth P. Barr, Chief Plant Support Branch Division of Reactor Safety 9604100103 960321 PDR ADOCK 05000335 8

PDR