Forwards Insp Repts 50-335/96-03 & 50-389/96-03 on 960126-30 & 0208 W/Regard to 960122 Unit 1 Overdilution Event. Violations Noted
ML17228B445
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/28/1996
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Holzmacher G
AFFILIATION NOT ASSIGNED
Shared Package
ML17228B446 List:
References
IA-96-019, IA-96-19, NUDOCS 9604090086
Download: ML17228B445 (4)


See also: IR 05000335/1996003

Text

IA 96-019

March 28,

1996

Mr. G.

H. Holzmacher

[HOME ADDRESS DELETED

UNDER 10 CFR 2.790]

SUBJECT:

NRC

INSPECTION

REPORT

NO. 50-335/96-03

AND 50-389/96-03

Dear Mr. Holzmacher:

This refers to the special

followup inspection at the St. Lucie facility

conducted

on January

26-30

and February 8,

1996, with regard to a January

22,

1996 Unit

1 overdilution event.

The report documenting the

NRC inspection is

enclosed.

A closed predecisional

enforcement

conference

was conducted

in the

Region II office on March 8,

1996, with Florida Power

and Light Company

(FPL)

(including you and the other licensed operators

involved in the event) to

discuss

the apparent violations, the root causes,

and corrective actions to

preclude recurrence.

A copy of the conference

summary is enclosed.

Based

on the information developed

during the inspection

and the information

provided during the conference,

the

NRC has determined that actions taken

by you

during the January

22,

1996 dilution event involved

a violation of NRC

requirements.

A Notice of Violation and Proposed

Imposition of Civil Penalty

has

been

issued separately

to

FPL for your failure to follow procedures for

reactor coolant system

boron dilution and your failure to monitor the dilution

evolution conducted

on January

22,

1996.

This violation involved

a serious

'lapse of attention

on your part to your duties

as

a licensed reactor operator.

In addition, you conducted

an inadequate

watch turnover

and failed to inform the

temporary relief operator at the controls

and the senior reactor operator that

a

boron dilution was in progress prior to leaving the control

room.

As a result

of these errors,

100 percent reactor

power was exceeded

on January

22,

1996.

As an

NRC Reactor Operator license holder, you are expected to ensure that

control

room evolutions are conscientiously

monitored

and that you are actively

involved in plant operation.

A high level of attentiveness

is required in order

to fulfillthese license responsibilities

and thereby ensure protection of the

public health

and safety.

Your actions

on January

22,

1996 did not meet these

standards.

The

NRC relies

on licensed operators

to accurately

perform their

assigned

duties.

After serious consideration of this matter,

we have decided

not to take formal enforcement

action against

you in this case.

We recognize

that

upon realizing your error you took prompt action to correct the mistake

and

inform the control

room staff of the error.

In addition, at the predecisional

enforcement

conference,

you indicated that you had learned

an important lesson

as

a result of this event

and understood

the need to meet your responsibilities

as

a licensed operator.

We expect that as part of your corrective action you

will share your lessons

learned with other licensed operators

at the St.

Lucie

plant.

You should

be aware that your performance

was unacceptable

and if

uncorrected,

could lead to enforcement

sanctions

in the future.

CERTIFIED MAIL NO.

P 291

242

533

RETURN RECEIPT

REQUESTED

96040'POOSh

960328

PDR

ADQCK 05000335

8

PDR

OgO037

G. Holzmacher

In accordance

with Section

2.790 of the NRC's "Rules of Practice,"

Part 2, Title

10,

Code of Federal

Regulations,

enforcement

actions

are placed in the

NRC

Public Document

Room (PDR).

A copy of this letter with your address

removed

will be placed in the

PDR unless

you provide sufficient basis to withdraw this

action within 30 days.

No reply to this letter is required;

however,

should you have

any questions

or

comments

concerning this action,

please

contact

Mr. Thomas

A. Peebles,

Chief,

Operations

Branch.

Mr. Peebles

can

be reached

at either the address listed

above or telephone

number

(404) 331-5541.

Sincerely,

Original Signed

by

Albert F.

Gibson

Docket No. 55-21934

License

No. OP-21052

Albert F. Gibson, Director

Division of Reactor Safety

Enclosures:

1.

NRC Inspection

Report

No. 50-335/96-03

and 50-389/96-03

2. Notice of Violation and

Proposed

Imposition of Civil Penalty to FPL

3. Predecisional

Enforcement

Conference

Summary

cc

W/HOME ADDRESS

DELETED w/o encls:

Florida Power

and Light Company

ATTN:

Mr. T.

F. Plunkett

President - Nuclear Division

P. 0.

Box 14000

Juno

Beach,

Florida

33408-0420

Part

55 Docket File

G. Holzmacher

Distribution

W HOME ADDRESS DELETED w o encls:

EJulian,

SECY

BKeeling,

CA

JTaylor,

EDO

JMilhoan,

DEDR

SEbneter,

RII

LChandler,

OGC

JGoldberg,

OGC

JLieberman,

OE

Enforcement Coordinators

RI, RIII, RIV

EHayden,

OPA

LTemper,

OC

GCaputo,

OI

EJordan,

AEOD

LNorton, OIG

OE:EA File (B. Summers,

OE) (2)

SRichards,

HOLB,

NRR

JBeall,

OE

TPeebles,

RII

CEvans,

RII

BUryc, RII

KClark, RII

RTrojanowski, RII

CCasto,

RII

KLandis, RII (IFS Update)

BSchin, RII

JNorris,

NRR

GHallstrom, RII

NUDOCS

NRC Resident

Inspector

U.S. Nuclear Regulatory

Comm.

7585 South Highway AIA

Jensen

Beach,

FL

34957-2010

cc

W/HOME ADDRESS

DELETED w/encl:

PUBLIC

Part

55 Docket File

/Wlpk5

OFFICE

RII:DRS

RII:DRP

RII:DRP

RII:

RII:DRS

RII:EICS

RII:ORA

CCasto

KLandI

Merscho

CEvans

AGIbson

BU

c

LRe es

COPY7

YES

YES

OFF

L RECORD

COPY

DOCUMENT NAME

H:il

EN. ENFi96040STL. DIFF INALSIG.SDE

YES

YES

YES

YES

'

G. Holzmacher

Distribution

W

HOME ADDRESS DELETED w o encls:

SECY

CA

JTaylor,

EDO

JMilhoan,

DEDR

SEbneter,

RII

WRussel.l,

NRR

RZimmerman,

NRR

LChandler,

OGC

JGoldberg,

OGC

Enforcement Coordinators

RI, RII, RIII, RIV

FIngram,

OPA

DWilliams, OIG

GCaputo,

OI

LTremper,

OC

EJordan,

AEOD

JBeall,

OE

OE:EA File (2)

NUDOCS

H. Christensen,

RII

N. Le,

NRR

G. Hallstrom, RII

PUBLIC

NRC Resident

Inspector

U. S. Nuclear Regulatory

Commission

5421 Shearon

Harris

Road

New Hill, NC,

27562-9998

SEND TO PUBLIC DOCUMENT ROOM)

YES

NO

OFFICE

RH:DRS

SIGNATURE

NAME

RII:D

KL

dis

RII:

P

EMerschof f

RII:ORA

RII:

AGib

RII:EI

RII:OR

yes

/

/96

03/

6

ES

NO

YE

NO

03/

/96

YES

NO

3/

/96

DATE

03

96

ES

NO

COPY'FFICIAL

RECORD

COPY

IIENT NAHE:

II:i1960PEN. ENFi96040STL.

FINALS IG

0

-

/96

03/

/

ES

NO

YES

0