Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-79-205, Forwards Info Re Fabrication,Insp & Operating History of Feedwater Lines in Further Response to 790525 Request + (ML17206A941)
- 05000335/LER-1979-022, Forwards LER 79-022/03L-0 + (ML17206A943)
- ML17206A944 + (ML17206A944)
- ML17206A946 + (ML17206A946)
- ML17206A947 + (ML17206A947)
- ML17206A948 + (ML17206A948)
- ML17206A949 + (ML17206A949)
- L-79-185, Responds to IE Bulletin 79-11.Circuit Breakers Are Not in Use at Plant + (ML17206A951)
- L-79-214, Forwards Reactor Containment Bldg Integrated Leak Rate Test + (ML17206A952)
- ML17206A953 + (ML17206A953)
- ML17206A954 + (ML17206A954)
- ML17206A955 + (ML17206A955)
- ML17206A956 + (ML17206A956)
- ML17206A957 + (ML17206A957)
- ML17206A958 + (ML17206A958)
- ML17206A960 + (ML17206A960)
- L-79-178, Advises That C-E Rept Info Requested by IE Bulletin 78-12, Atypical Weld Matl in Reactor Pressure Vessel Welds, Submitted to NRC Under Separate Ltr,Has Generic Coverage of Weld Matl & Testing Programs Used by C-E + (ML17206A961)
- 05000335/LER-1979-023, Forwards LER 79-023/03L-0 + (ML17206A962)
- ML17206A963 + (ML17206A963)
- ML17206A964 + (ML17206A964)
- ML17206A965 + (ML17206A965)
- ML17206A966 + (ML17206A966)
- IR 05000335/1979013 + (ML17206A968)
- ML17206A969 + (ML17206A969)
- ML17206A971 + (ML17206A971)
- ML17206A972 + (ML17206A972)
- ML17206A973 + (ML17206A973)
- IR 05000335/1979014 + (ML17206A974)
- ML17206A975 + (ML17206A975)
- ML17206A976 + (ML17206A976)
- ML17206A977 + (ML17206A977)
- 05000335/LER-1979-024, Forwards LER 79-024/03L-0 + (ML17206A978)
- ML17206A979 + (ML17206A979)
- 05000335/LER-1979-024-03, /03L-0 on 790705:while Reducing Power,Control Element Assembly 62 Slipped from 134 Inches to 120 Inches. Caused by Faulty Timer Module.Timer Module Replaced & Assembly 62 Performed Normally + (ML17206A980)
- L-79-193, Forwards Response to Item 5 of IE Bulletin 79-13.Nozzle Area Insp Program Will Be Completed During Shutdown Scheduled for 791001.Discusses Adequacy of Operating & Emergency Procedures & Feedwater Leak Detection + (ML17206A981)
- L-79-226, Forwards Security Training & Qualification Plan.Plan Withheld (Ref 10CFR2.790) + (ML17206A982)
- L-79-207, Responds to IE Bulletin 79-11.Westinghouse DB-50 & DB-75 Circuit Breakers Will Not Be Used in Safety Related Class IE Equipment + (ML17206A983)
- ML17206A984 + (ML17206A984)
- ML17207A067 + (ML17207A067)
- ML17207A074 + (ML17207A074)
- ML17207A077 + (ML17207A077)
- FOIA/PA-2017-0597 + (ML17207A078)
- FOIA/PA-2017-0604 + (ML17207A079)
- ML17207A083 + (ML17207A083)
- ML17207A084 + (ML17207A084)
- ML17207A096 + (ML17207A096)
- ML17207A097 + (ML17207A097)
- ML17207A100 + (ML17207A100)
- MNS-17-032, End of Cycle 24 In-service and Steam Generator In-service Inspection Summary Reports + (ML17207A102)
- RBG-47770, Focused Evaluation of External Flooding + (ML17207A105)
- ML17207A106 + (ML17207A106)