Responds to Concerns Re Safe Plant Operation.Pwr Licensees Are Required to Modify Facilities Per Specific NRC Requirements.Util Actions Add Assurance for Protection of Public Safety.W/O Encl
ML17206A976
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/25/1979
From: Gammill W
Office of Nuclear Reactor Regulation
To:
MARTIN COUNTY, FL
References
NUDOCS 7908200132
Download: ML17206A976 (37)


Text

, DISTRIBUTION.

oc et File

, JRBuchanan TERA ACRS (16)

Gray File

RIngram, RReid PErickson JUlY 2 5 $79 NRC P

-L-PBR ~4 ORB//4 Rdg NRR Rdg DEisenh0t RVollmer TJCarter WRussell BGrimes NGammill LShao JNi 1 ler--

OELD.

I&E, (3,)

>@IIMlil%7SPIg<I,.

-iI~@>~

-Docket No. 50-335 Board of County Commissioners County of Hartin P. 0. Box'626 Stuart. Florida 33494 Gentlemen:

f<r. John T. Carmody, Jr., requested that we respond to your concerns over the. safe operation of the St. Lucie plant.

You requested that we review the St. Lucie plant with respect to precautions which would prevent in accident similar to'he Three tlile Island Unit No. 2'(TNI-2) accident.

We share your concern over preventing a similar accident at any other nuclear'lant and. therefore, initiated comprehensive reviews of all licensed pressurized water nuclear power plants soon after the accident at THI-2..

All licensees of pressurized water reactors, including't. Lucie Unit No. 1, have been required to review and/or modify their facilities in accordance with specific requirements such as NRC Bulletin No.79-06B (Enclosure Ho. 1).-

Florida Power 8 Light (FPL) letters.'(Enclosures Hos. 2, 3 5 4) respond to the NRC bulletin..

Our'valuation of the FPL response indicates that the actions taken by FPL demonstrate an understanding of the salient concerns arising from the THI-2 accident as it related'o St. Lucie operations.

FPL actions also provide added assurance for the protection of the health and safety of the public during plant operations.

s Me are continuing our review of the FPL response to our bulletin and the implementation of the requirements at St. Lucie.

We wil.l provide our findings and safety evaluation (SE) report to you when it is available.

We estimate that our SE and findings will be complete by August 30, 1979.

Other safety reviews'-;of St. Lucie Units Hos.

1 and 2 relative to the THI-2 accident are, also, being conducted by the NRC.

Any required changes deter-mined by our review>s will be implemented at bytQiyjQ~ St. Lucie Unit NO.

2 is, as you know, now under construction.

'g 'gu@%M iRZ 9-

g Te ~

~4

\\$444 4

I I ll 4*

4'1 E

~ ~

4

'1

~

P PE 4 4

4 "r

E il w/I g ~

1

'I Ie 4

P I

=I 1 4

'4

'I

~ 4 4 \\

4 4

1 I

'I

~

1 '

~

4

Me w)ll also provide these additional SEs and findings to you, as soon as they are available.

Sincerely, Dnginal Signed by N.P. GammllJ lt)115am P.

Gamm)11, Act)ng Assistant Director for Operating Reactor Projects Division of Operating Reactors Enclosures'.

NRC Bulletin Ho.79-06B 2.

FPL ltr. dtd. 4/24/79 3.

FPL ltr. dtd. 5/25/79 4.

FPL ltr. dtd. 5/29/79 CC:

Dr. Robert E. Uhrig V)ce President Florida Power 8 Light Company Advanced Systems 8 Technology P. 0. Box 529100 Miami, Florida 33152 A -

'DOR OFnORW CQRIIANRKW OAVC~

~

~

~ ~

~ I

~

~ ~

PEri ckson 7/A/79

~ I

~

~ ~ ~ ~ ~ t

~

~ ~ ~

HA mme.........

gg779 1 ~

~ 0

~ ~

~

~

~ \\ ~

~ ~

ORB¹4:DOR C

DOR h

~ + ~ ~ ~

~ ~ Otl ~ t ~ ~ ~ ~ ~ ~

~

WLC FORM 310 (9 T6) NRC5K 0240 Cf Us0 OOVICHNIIIXHTONIHTINO ONNICNI I 000 ~00 ~

000

's[ss lM'

~ ~

+

~ I ~

P "I

n g

l J

a r

r J

~ w e~

I

Bob Lyon EG&G Idaho, Inc.

P. 0.

Box 1625 Idaho Falls, ID 83401

Dear Bob:

Enclosed you will find drawings with specific valves encircled.

I disaassed with Rockhold and Fehringer the need to have. them do a failure mode and effects ynalysis on these valves.

They have agreed to include these valves in their

./St. Lucie El study presently being done.

Enclosed you <vill find the relief

~~ bases (pages 3, 4 and 10) from St. Lucie Ill IST program re-ebrr5bttal on the valves in question.

Sincerely, Victor l'lerses Reactor Safety Branch Division of Operating Reactors DISTRIBi]TION:

Central File RS Pdg.

V."lerses Rdg.

PCheck NRR File.

OII ICd&

DATd~

V.'lerse s : pmj II ~

~ ~

~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ )go ~ ~

ISAAC PDRM 318 (9.76) NRCM 0240 5 V,~, OOVCRNMRNT RRINTINO ORRICOI I ~ 74 44 ~

T ~ 4

0 pP~

d 5 ~y~.

ea h

+p,F RKQ+gP 0

I>>

>>>>**A OFFICE OF THE SECRETARY I

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON,D.C. 20555 Dune ll, 1979 Director Office of the Federal Register National Archives and Records Service Washington, D. C.

20403

Dear Sir:

Enclosed for publication in the Federal Register are an original and two certified copies of a document entitled:

FLORIDA POMER AND LIGHT COMPANY I

~

i pC Docket No. 50-335 NOTICE OF ISSUANCE OF QIENDMENT TO FACILITY OPERATING LICENSE Publication of the above document at the earliest possible date would be appreciated.

This material is to be charged to requisition number E-146.

Sincerely, Samuel J. Chilk,

Secretary of the Commission

Enclosures:

Original and 2 certified copies bcc:

cords h

Office of Public Affairs Executive Legal Director

~

Office of Congressional Affairs Office of the General Counsel SECY -

CAR Branch

7590-01!

UNITED 'STATES 'UCL'EAR:REGUL'ATORY 'COMMISSION DOCKET NO. 50-335

'FL'ORIDA POWER:AND 'L'IGHT'COMPANY NOTICE 'OF 'SSUANCE:.OF- 'AMENDMENT'TO FAGIL'ITY I G:

ICENSE i

The V. S. Nuclear Regulatory Commission (the Commission}

has issued Amendment No. 32 to Facility Operating License No.

DPR-67 issued to Florida Power 8 Light Company (the licensee),

wliich revised the license and its appended Technical Specifications for operation of St. Lucie Plant, Unit No.

1 (the facility), located in St. Lucie County, Florida.

The amendment is effective as of its date of issuance.

This amendment revises the Technical Specifications to incorporate changes I'esulting from Cycle 3 reload fuel,- and deletes a license requirement for i

neutron shielding which has been satisfactorily completed.

The applications for the amendment comply with the standards 1

and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations.

The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration; The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR Section 51.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of this amendment.

75""0-01 For further details with respect to this action, see (1) the

~ t applications for amendment dated November 9, 1978 and February 22, 1979, as supplemented April 30 and Hay 1, 10, 18, 22 and 23, 1979, (2) Amendment No.

32 to License No. DPR-67, and (3) the Commission's related Safety Evaluation.

All of these items are available for public inspection at the Commission's Public Document

Room, 1717 H Street, N. W., Washington, D. C.,

and at the Indian River, Junior College Library, 3209 Virginia Avenue, Ft.

Pierce, Florida.

A copy of items (2) and (3) may be obtained upon request I

addressed to the U. S. Nuclear Regulatory Commission, Washington,'.

C.'0555, Attention:

Director, Division of Operating Reactors.

Dated at Bethesda, Mar'yland this 27th day of Nay 1979.

FOR THE NUCLEAR REGULATORY COMMISSION Operating Reactors Branch 5'4 Division of Operating'eactors

1, I

l

4,p

,. D IBUTION:

uNITED sTATEs ocket Fi1 e NUGLEAR REGULAToRYcoMMlssloN

'RB¹4 Rdg r - - - - --WASHINGTONrD.C. 20555 May 10, 1979 Docket No. 50-335 U. S. Environmental Protection Agency Region IY Office ATTN:

EIS COORDINATOR 345 Court1and Street, N.E.

Atlanta, Georgia 30308 subject.

ST. LUCIE UNIT NO.

1 The following documents concerning our review of the subject facility are transmitted for your information:,

4 Notice of Receipt of Application.

Draft/Final Environmental Statement, dated Safely Evaluation, or Supplement No.,

dated Notice of Hearing on Application for Construction Permit.

Notice of Consideration of Issuance of Facility Operating License.

Application and Safety Analysis Report, Vol.

Amendment No.

to Application/SAR, dated Construction Permit No. CPPR-dated Facility Operating License No..DPR-

, NPF-

, dated

. Amendment No.

to CPPR-or DRR-, dated X

Other:

Division of. Operating Reactors Office of Nuclear Reactor Regulation

Enclosures:

As stated CC; n

OFFICE %

SVRNAME In DATE NRC 21 I6 76)

ORB¹4: DOR~

RIngram/cb

gl.

it' n

E

)a

~

t' t

ll lt

= IL tt

~

I

~

~,

~

~

~C'P,S REC0q Tp,0 I

O I

r~

Vl0

+~

~O

+%*%+

OFFICE OF THE SECRETARY UNITED STATES 1

NUCLEAR REGU1 ATORY COMMIS N

WASHINGTON, O. C. 20555 April 12, 1979 Director Office of the Federal Register National Archives and Records Service Washington, D.C.

20403

Dear Sir:

Enclosed for publication in the Federal Register are an original and two certified'opies of a document entitled:

FLORIDA POWER AND LIGHT COMPANY Docket No. 50-335 NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE Publication of the above document at the earliest possible date would.

be appreciated.

This material is to be charged to requisition number E-146.

Sincerely,

Enclosures:

Original and 2 certified copies Samuel J. Chilk Secretary of the Commission bcc:

ecords Facility Branch Office of Pu i

Affairs Executive Legal Director Office of Congressional Affairs Office of the General Counsel SECY -

CRR Branch

7590-01 UNITED STATES NUCLEAR REGULATORY COYiJIISSION DOCKET HO; 50-335 FLORIDA POI'JER AND 'LI'GHT COt~iPANY HOTICE OF ISSUANCE"OF'- 'At1ENDMEh'T TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No.

31 to Facility Operating License No.

DPR-67 issued to Florida Power

& Light Company (the licensee),

which. revised Technical Specifications for operation of St. Lucie Plant, Unit No.

1

~ ~

(the facility), located in St. Lucie County, Fl'orida.

The amendment is effective as of its date of issuance.

This amendment revises the Technical Specifications to allow replacement of seleCted safety-related hydraulic snubbers with mechanical snubbers and to revise snubber surveillance requirements.

The amendment also allows relocation of sample lines for the safety injection tanks and revises the Technical Specifications to add surveillance requirements for the containment isolation valves in the new sample lines.

The applications for the amendment comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission s rules and regulations..The Commission has made appropriate

'indings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Prior pu"lie notice of this amendment was not required since the amendment does no: involve a significant hazards consideration.

7590-01 The Cormission has determined that the issuance o-.his amendment will not resu'it in any significant environmental impact and that pursuant

.to 10 CFR Section 51.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of this amendment.

For further details with respect to this action, see (1) the application for amendment dated March 10,.1978, as revised April 3 and 19,

1978, and March 8, 1979, and the application for amendment dated November 16,
1978,

('2) Amendment No.

31 to License No. DPR-67, and (3) the Commission's related Safety Evaluation.

All of these items are available for public inspection at the Commission's Public Document

Room, 1717 H Street,.N.

W.,

Washington, D. C., and at the Indian River Junior College Library, 3209 e

Virginia Avenue, Ft. Pierce, Florida.

A copy of items (2) and (3) may be obtained upon request addressed to'the'U.

S. Nuclear Regulatory Commission, Washington, D. C. 20555, Attention: Director, Division of Operating Reactors.

Dated at Bethesda, Maryland, this 5th day of April 1979.

FOR THE NUCLEAR REGULATORY COMMISSION Robert W. Reid, Chief Operating Reactors Branch 4'4 Division of Operating 'Reactor~

v4 F

m Docket No.

5p-335 t,

e OI TRIBU ION'UCLEAR REGULATORYCOMMISSION VbtASHINGTON, O,C. 20555 ORB84 Rdg RIngram March 19, 1979 Addressees:

See next page

Subject:

ST. LVCIE VNIT HO 1

The followin'g documents concerning our review of the subject facility are transmitted for your information:

Notice of Receipt of Application.

Draft/Final Environmental Statement, dated Cl Safety Evaluation. or Supplement No., dated Notice of Hearing on Applicatiorr for Construction Permit.

Notice of Consideration oi'Issuance of Facility Operating License.

Application and Safety Analysis Report, Vol.

, dated Amendment No.

to Application/SAR, dated Construction Permit No. CPPR-G Facility Operating License No. DPR-

, NPP-,

dated Amendment No.

to CppR-or DRR-, dated

~

I other:

'd Annoa Re

'Division of Operating Reactors, ORB84 Office of Nuclear Reactor Regulation

Enclosures:

As stated CC; OFFICE fS, SURNAME Se OATS NRC 21 I6 76)

Std DOR.S RIngram/cb Sl /79

4g C'

C

) LL!>$97PZQ gA f

V A

4 I

Florida Power 5 Light Company Chief Divis i on of Ecol og ica 1 Servi ces Bureau of Sport Fi sheri es 5 Wi 1 d'Iife U. S. Department of the Interior Hashington, D.

C.

20240 Director National Oceanographic Data Center Environmental Data Service National Oceanic 8 Atmospheric Administration U. S.

Department of Commerce Mashington, D.

C, 20235 Dr. James T. Tanner National Bureau of Standards Reactor Building 235 Washington, D.C.

20234 Chief, Energy Systems Analyses Branch (AM-459)

Office of Radiation Programs U. S. Environmental Protection Agency Room 645, East Tower 401 M Street, S.

W.

Mashington, D.

C.

20460 EPA REGION U.

S.

Environmental Protection Agency Region IV Office ATTN:

EIS COORDINATOR 345 Courtland Street, N.E.

Atlanta, GA 30308

A Wt w

g~S Rf00, C+

fp0 p

C p

IVl p

/p p4

+w*w+

OFFICE OF THE SECRETARY UNITED STATES LEAR REGULATORY COMMISSI WASHINGTON, D. C. 20555 March 12, 1979.

Director Office of the Federal Register National Archives and Records Service Washington, D.C.

20403

Dear Sir:

Enclosed for publication in the Federal Register are an original and two certified copies of a document entitled:

FLORIDA POWER -AND LIGHT COMPANY Docket No. 50-335 NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE Publication of the above document at the earliest possible date-wou'1d be appreciated.

This material is to be charged to requisition number E-146.

Sincerely,

Enclosures:

Original and 2 certified copies Samuel J. Chilk Secretary of the Commission bcc:

c c lit Branch Office of Public a>

s Executive Legal Director Office of Congressional Affairs

. Office of the General Counsel SECY -

C8R Branch

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-335 FLORIDA POWER 5 LIGHT COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPE TIN LICENSE The U.

S. Nuclear Regulatory Commission (the facility) has issued Amendment No. 30 to Facility Operating License No.

DPR-67, issued to Florida Power 8 Light Company (the licensee),

which revised the license for operation of the St.

Lucie Plant, Unit No.

1 (the facility), located in St.

Lucie County, Florida.

The amendment i;s effective as of the date of issuance.

The amendment modifie's the license to include the current Comnission-approved physical security plan.

The licensee's filing complies with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act), and the Coranission's rules and regulations.

The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Prior public notice of thisi, mendment was not required since the amendment does not involve a significant hazards consideration.

4P

7590-01 The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement op negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

The licensee's filing dated October 18, 1978, revised February 20, 1979, and the Commission's Security Plan Evaluation Report are being withheld from public disclosure pursuant to 10 CFR 2.790(d).

The withheld information is subject to disclosure in accordance w'ith the provisions of 10 CFR 59.12.

For further details with respect to this action, see (1)

Amendment No.

30 to License No.

DPR-67 and (2) the Commission's related letter to the licensee dated February 28, 1979 These items are available for public inspection at the Commission's Public Document

Room, 1717 H Street, N.W., Washington, D.C.

and at the Indian River Junior College Library, 3209 Virginia Avenue, Ft. Pierce, Florida.

A copy of items (1) and (2) may be obtained upon request addressed to the U.

S.

Nuclear Regulatory Commission, Washington, D.C.

20555, Attention:

Director, Division of Operating Reactors.

Dated at Bethesda, maryland, this 28th day o'f February 1979:

FOR THE NUCLEAR REGULATORY CO'i"lISSION Robert W. Reid, Chief Operating Reactors Branch

<4 Division of Operating Reactors

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 February 27, 1979 8DXIR DISTRIBUTION:

44dcket ORB¹4 Rdg RIngram Docket No.

50-335 U. S. Environmental Protection Agency Region IVOOffice ATTN:

EIS COORDINATOR 345 Courtlend Street, N. M.

Atlanta, Georgia 30308

Subject:

ST.

LUCIE UNIT NO.

1 The following documents concerning our review of the subject facility are transmitted for your information:

m Notice of Receipt of Application Draft/Final Environmental, Statement, dated Safely Evaluation. or Supplement No., dated Notice of Hearing on Application for Construction Permit.

r Notice of Consideration of Issuance of Facility Operating License.

Application and Safety Analysis Report. VOL Amendment No.

to Application/SAR, dated 0

Construction Permit No. CPPR-Facility Operating Licenhe No. DPR-

, dated

, NPF-'

dated Amendment No.

to DppR-or ERR-.

dated Reportable Occurrence No.. 335-B-78-09 on 781227.

Other:

Division of Operating Reactors, ORB¹4 Office of Nuclear Reactor Regulation Enclo'sures:

As stated CC:

OFFICE Ir SUAISAME Ia DATE ORB84:DOR RIngram/cb 2/P /79

I II r

~

~

~

~

k" V

~

r k

k

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTONO.C. 20555 February 27, 1979 QISTR IBUTION:

UOocket File ORB¹4 Rdg RIngram Docket No. M-335 U. S. Environmental Protection Agency Region IY Office ATTN:

EIS COORDINATOR 345 Courtland Street, N. E.

At1anta, Georgia 30308 subject: ST.

LUCIE UNIT NO.

1 The following documents concerning our review of the subject facility are transmitted for your information:

Notice of Receipt of Application.

Draft/Final Environmental Statement, dated CI Safely Evaluation. or Supplement No.

". dated Notice of Hearing on Application for Construction Permit Notice of Consideration of Issuance of Facility Qperating License.

Application and Safety Analysis Report, VOL AmerIdment No.

Construction Permit No. CPPR-to Application/JAR, dated

, dated pther.

Re ortable Occurrence 335-B-CI Facility Operating License No. DFR-ntpp-AmendmentNo.

to OPpR-or DRR-, dated

, dated

Enclosures:

As stated r

CC:

Division of Operating Reactors, ORB¹4 Office of Nuclear Reactor Regulation OFFICE 8 6URftIAMt ge QAre NRC

'21 (6 76)

ORB¹4:DOR 4 RIngram/cb

=2/p7/79 u

~

< ~

H A

I V

/

~

~

~r g

~

~

1 4

r t4 1

~g REMI O~

C 00 a ~

~0 OFFICE OF THE SECRETARY UNITED STATES CLEAR REGULATORY COMMISSIUPJ WASHINGTON, D. C. 20555 February 2, 1979 Director Office of the Federal Register National Archives and Records Service Mashington, D.C.

20403

Dear Sir':

Enclosed for publication in the Federal Register are an original and two certified copies of a document entitled:

FLORIDA POWER AND LIGHT COMPANY Docket No.-50 336 r

e ~

0 NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE AND NEGATIVE DECCARATIOA Publication of the above document at the earliest possible date would be appreciated.

This material is to be charged to requisition numbe - E-l46.

Sincerely,

Enclosures:

Original and 2 certified copies Samuel J. Chilk Secretary of the Commission bcc:

Records~am B

. c sce of Public Affairs Executive Legal Director Office of Congressional Affairs Office of the General Counsel SECY -

CER Branch

7590-01 UNITED STATES NUCLEAR REGULATORY CO@)ISSION DOCKET NO. 50-335 FLORIDA POWER 5 LIGHT COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE AND NEGATIVE DECLARATION The U.

S. Nuclear Regulatory Commission (the Commission) has issued Amendment No.

29 to Facility Operating License No.

DPR-67, issued to Florida Power 5 Light Company (the licensee),

which revised the Technical Specifications for operation of the St. Lucie Plant, Unit No.

1 (the facility), located in St. Lucie County, Florida.

The amendment is effective as of its date of issuance.

The amendment revises Appendix B Administrative Controls of the Technical Specifications, deletes certain environmental monitoring requirements and authorizes a 2'F increase in the temperature of condenser coolinq water.

The applications for the amendment comply with the st'andards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.

The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

The Coranission has prepared an environmental impact appraisal for this action and has concluded that an environmental impact statement is not warranted because there will be no environmental impact attributable to the action other'han that which has already been predicted and described in the Cormission's Final Environmental Statement for the facility dated June 1973.

For further details with respect to this action, see (1) the applications for amendment dated August 1, 1977, August 29 and September 29, 1978, (2) Amendment No.

29 to License No.

DPR-67 and (3) the Comnission's Environmental Impact Appraisal.

All of these items are available for public inspection at the Commission's Public Document

Room, 1717 H Street, N.W., Washington, D.C.

and at the Indian River Junior College Library, 3209 Virginia Avenue, Ft. Pirece, Florida.

A copy of'tems (2) and (3) may be obtained upon request addressed to the lk S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention:

Director, Division of Operating Reactors.

Dated at Bethesda, Maryland, this 24th dqy of January

1979, P

FOR THE NUCLEAR REGULATORY COMMISSION

~/ g

(

P Robert W. Reid, Chief Operating Reactors Branch 84 Division of Operating Reactors

C

F(RC Iofru 107 Ll IIr lr.S. HVCLKAfr RK CIILATORYCOMMISSIorr YACS NVMIKA+

TECHNICALASSIGNMENT CONTROL FORM Mg 0h LP Nfw ASSrCNMINT NEW INIOIIMATION0 0 NEO VIAf0 ENTRIES

&CT)ON ). F(EOUEST DATA

&cY c.

<8)~k cN QEgcrV. Ir'es7aL QsLrL'Nine'+FAT<<<<

KAD)

MO.

OAY TR.

DATE PREPAREDB

(*ZIHRR COHTAOL HUMBEAI (AGI AEOVEST =OHTACT I (AXIREOVESTER'I INITI IABI RFOVESTIHG ORGANIZATIONI g (r 8&L~rLr6'+rBBr'pH-S

/f~mp coo~a~~

&cc.go~

SYSTEMS CONTROL DATA (AH) AEOVESTIHG MO.

DAY TR.

FARGET DATE IAUof>>InrC rw>>Mn IA<<IMrLttforrl (AM) rrlvv (2)

LT)

VENDOR'6 NAME FACILI Tv HAMKISI (BA) DOCKET(SI 05000 (5)

(Sr FACI LITY NA ME IS I (BAI DOCKET(S)

REPORT IDENTIFICATIONSYMBOL IDA) PROPAIETARY (P)

(AR) INITIATION DAVE LICErrlfK KAT)AClnOrsC OATS MO.

DAV Vtri MO OAV VR ECT)ONK RI'V(E)r)'ATA PREPARED BY (ASI ADDITIOHALINFOAMATION REOVEST DATE

~Io DAV VR, IAVI.I ICEHSr>>C ACTICrr COMnLKTK DAV vfr (AV)A>>frro ~ Kl CLAII

('

C rr frl lv D

v D vr DATE PREPARED MO.

DAV YR.

IEA) HOH PROPRIETARY VERSIOH (NP)

(FAIHOH PROPRIETARY REPORT 1

IAGIActlvITYc(rof Itnr<<In I"IIFIrrrffrr>>rrr fn "F"r<<Err<<r<<rn>>nrno>>r<<r<<I I t<<Anrnrrrfrnr>>r<<r" Qva'4&storrrf rwrrrr ~ cr>>rr Mrrl

~OS 1 Ct AnofnlIS>>E>>nfrOrrl UC,AMKNO.~ TS offIIITOALICKNSrNC

~OST OL HEAIIING IIS) nrl

~LIIITSUIV(rLLANCK r Lv IM>L I TA, VO LICErr EE

(~ 'l I No>>JlorrfrNK lr1 sroNKK 44KI SYSTEM, EVAL,PIOGAAM TolrCALRKIon1 IlfV.

Corr(IIICT MGMT.

NOrrllfACTOrr IrfV.

ll(SKIIICHACTIVITIKS CK N 1IC IA,~.C. 0 I OTHE'KNKIIIC a7>

II(C. GVIOKII STD. IlfV.

INovsTnv cooKS ~ ITC.

(TSI CO rr rr 1 SIOrrOK NCK A(rMINISTAITIVf ASSIGNED ORGANIZATIONF"A'"efrfrrfrpf>>rfcofrrmn)

Ao0fr OIII1 OnlrI OBIS ORII AOO1 SI RS AOSC RS OS RSLI ADK MKI MTE~

SK ~

ADIIS AI CPI RSS DEKA AOET CI ~

ESS AOK~

SPIS AOSA A*I ITS ~

RAI ADIT GS ~

HMI AIG

~SUI AOLI LWA1 LWIIS LWIIS LWAI

  • DSP LMI~

ADOA PIN ISEI OLS REVIEWER'S SURNAME LEAD frfVIEWS Ir (CA) REVIEWER'6 INITIALSI (CB) ESTI ~

MATED HOURS COMPLETION DATE (CC) ESTIMATED (CD) ACTUAL MO. OAV VA.

MO.

DAV VR.

BRANCH COOADIIVATING LEAD RESPONSE RESI'OND 0

INDIVIUUALLY AOO ~I AT INK NT COMMENTS TO

~ACE Of POIIM COPIES To'KOVESTE h

1. MPAIMANAGKMENT I IMPOAMATIONSCIENCE IIIANCH REVISWINC IRANCH NRC FORM 117 n.1II

I

UNITED STA'TES NUCLEAR REGUI.ATORY COMMISSION WASHINGTON, D.C. 20555 January 12, 1979 Docket Nq.

U. S. Environmenta1 Protection Agency Region I%f Office ATTN:

EIS COORDINATOR 345 Court1and Street, N;B.

Atlanta. Georgia 30308 STo LUCIE UNIT NOm 1

DISTRIBUTION:

~ocket File ORBI514 Reading RIngram The following documents concerning our review of'he subject facility are transmitted for your information',

C3 Notice of Receipt of Application, r

Draft/Final Environmental Statement, dated Safety Evaluation, or Supplement No., dated Notice of Hearing on Application for Construction Permit.

Notice of Consideration of issuance of Facility Operating License, Application and Safety Analysis Report, UOL D

Amendment No.

to Application/AAR, dated Construction Permit No. CPPR-,

dated Facility Operatind License No. DPR-Amendment No.

to CPPR.

orDRR-, dated QN, : ~Fd

- tLonJ3g37/78.

Enclosures:

As stated CC:

Division of Operating,'Reactors Office of Nuclear Reactor Regulation QIAIdI OFFICE lo SURNAME Io DATE NRC 21 (6 76)

ORBIII4:DORp R Ingram/cb let=i~/:7 =

I t

~

1

~

It

~ II I

l&g r>

f

-~~y

~ It tt

~

I t

't t

'l I'

s

~q v

Qgg fQQQ)J

\\I

~

E1