Forwards IE Insp Rept 50-335/79-13 on 790518-25.No Noncompliance Noted
ML17206A966
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/29/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17206A967 List:
References
RII:EHW, NUDOCS 7908170541
Download: ML17206A966 (3)


See also: IR 05000335/1979013

Text

R<Cu~

J'

gw

p %~

'

I

=-<fI "

+%*4+

In Reply Refer To:

RII:EHW

50-335/79-13

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

Jutl

2

g ]979

C~eF~

Florida Power and Light Company

Attn:

R. E. Uhrig, Vice President

Advanced

Systems

and Technology

Post Office Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by E. H. Webster of this office

on May 18-25,

1979 of activities authorized

by NRC License

No.

DPR-67

for the St. Lucie facility, Unit 1, and to the discussion of our findings

held with C.

M. Wethy at the conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in

the enclosed

inspection report.

Within these

areas,

the inspection

consisted

of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observations

by the inspectors.

Within the scope of this inspection,

no items of noncompliance

were

disclosed.

One

new unresolved

item resulted

from this inspection

and is discussed

in the enclosed

report.

This item will be examined during subsequent

inspections.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title 10,

Code of Federal Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public

Document

Room. If this report contains

any information that you (or

your contractor) believe to be proprietary, it is necessary

that you

make

a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include

a full statement

of the reasons

on the basis of which it is

claimed that the information is proprietary,

and should

be prepared

so

that proprietary information identified in the application is contained

in a separate

part of the document.

If we do not hear

from you in this

regard within the specified period,

the report will be placed in the

Public Document

Room.

Florida Power and Light Company

-2-

JUN

P

9 1979

Should you have any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

E.c.

R.

C.

ewis, Acting Chief

Reactor Operations

and

Nuclear Support Branch

Enclosure:

Inspection Report No. 50-335/79-13

cc w/enclosure:

C.

M. Wethy, Plant Manager

Post Office Box 128

Ft. Pierce, Florida

33450

Nat Weems, Assistant

QA Manager

Post Office Box 128

Ft. Pierce, Florida

33450