Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-79-135, Forwards C-E Proprietary Rept Control Element Assembly Guide Tube Eddy Current Testing. Forwards Ae Sherer Affidavit Attesting to Proprietary Nature of Rept + (ML17206A829)
- L-79-148, Notifies of Reduction in Allowable Peak Linear Heat Rate in Accordance w/790526 & 27 Telcon W/P Erickson.Reduction Necessitates Change in Tech Specs.Revised Figures Encl + (ML17206A831)
- ML17206A832 + (ML17206A832)
- ML17206A834 + (ML17206A834)
- L-79-110, Notifies That Reponse to IE Bulletin 79-04 Re Velan Swing Check Valves Will Be Submitted by 790531 + (ML17206A838)
- ML17206A839 + (ML17206A839)
- ML17206A840 + (ML17206A840)
- ML17206A841 + (ML17206A841)
- ML17206A842 + (ML17206A842)
- ML17206A844 + (ML17206A844)
- ML17206A845 + (ML17206A845)
- IR 05000335/1979007 + (ML17206A846)
- 05000335/LER-1979-016, Forwards LER 79-016/01T-0 + (ML17206A847)
- ML17206A848 + (ML17206A848)
- ML17206A850 + (ML17206A850)
- 05000335/LER-1979-017, Forwards LER 79-017/03L-0 + (ML17206A851)
- ML17206A852 + (ML17206A852)
- 05000335/LER-1979-018, Forwards LER 79-018/03L-0 + (ML17206A853)
- ML17206A854 + (ML17206A854)
- ML17206A856 + (ML17206A856)
- IR 05000389/1979005 + (ML17206A860)
- ML17206A861 + (ML17206A861)
- ML17206A862 + (ML17206A862)
- IR 05000389/1979006 + (ML17206A864)
- L-79-170, Forwards Requested Info Re Feedwater Line Design & Fabrication History + (ML17206A865)
- ML17206A866 + (ML17206A866)
- IR 05000335/1979009 + (ML17206A868)
- ML17206A869 + (ML17206A869)
- L-79-129, Responds to IE Bulletin 79-04 Re Velan Swing Check Valves. No Such Valves Being Supplied for Unit + (ML17206A870)
- L-79-130, Responds to IE Bulletin 79-09 Re GE Model AK-2 Circuit Breaker.Work Order Issued to Perform Checks Described in GE Svc Advice Ltr 175 & Checks Will Be Incorporated Into Switchgear Maint Procedure + (ML17206A871)
- ML17206A872 + (ML17206A872)
- ML17206A873 + (ML17206A873)
- ML17206A874 + (ML17206A874)
- L-79-156, Responds to IE Bulletin 79-09.Procedures Similar to Those Described in 790522 Response Will Be Developed Prior to Initial Fuel Loading,Providing GE AK-2 Circuit Breakers Are Used + (ML17206A875)
- ML17206A876 + (ML17206A876)
- IR 05000335/1979010 + (ML17206A878)
- ML17206A880 + (ML17206A880)
- ML17206A882 + (ML17206A882)
- ML17206A883 + (ML17206A883)
- L-79-179, Forwards Revised Pages Correcting Typographical Errors in 780908 Pump & Valve Test Program + (ML17206A884)
- ML17206A885 + (ML17206A885)
- L-79-141, Responds to IE Bulletins 79-06 & 06B.Responsibility for Initiation & Verification of Auxiliary Feedwater Flow to Steam Generators Is Primary Duty of Designated Operator During Transients & Accidents + (ML17206A887)
- ML17206A888 + (ML17206A888)
- ML17206A890 + (ML17206A890)
- ML17206A891 + (ML17206A891)
- ML17206A893 + (ML17206A893)
- ML17206A894 + (ML17206A894)
- ML17206A895 + (ML17206A895)
- 05000335/LER-1979-019, Forwards LER 79-019/03L-0 + (ML17206A896)
- ML17206A897 + (ML17206A897)
- L-79-147, Forwards Status Rept Describing Progress in Responding to IE Bulletin 78-12B.Plans to Respond by 790629 + (ML17206A898)