ML17206A876
| ML17206A876 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 05/01/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17206A877 | List: |
| References | |
| NUDOCS 7907090126 | |
| Download: ML17206A876 (3) | |
See also: IR 05000335/1979010
Text
AS RK0y,
'40@
~4
0
Cy
+~ ++*++
In Reply Refer To:
RII:RJV-L
50-335/79"10
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, N.W.
ATLANTA,GEORGIA 30303
MAY 1
1979
Florida Power and Light Company
Attn:
R. E. Uhrig, Vice President
Advanced
Systems
and Technology
Post Office Box 529100
Miami, Florida
33152
Gentlemen:
This refers to the inspection
conducted
by R. J. Vogt-Lowell of this
office on April 14-17,
1979 of activities authorized
by NRC License
No.
DPR-67 for the St. Lucie facility, Unit 1, and to the discussion of our
findings held with C. Wethy at the conclusion of the inspection.
Areas
examined during the inspection
and our findings are discussed
in
the enclosed
inspection report.
Within these
areas,
the inspection
consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were
disclosed.
In accordance
with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title 10,
Code of Federal Regulations,
a copy of this letter and
the enclosed
inspection report will be placed in the NRC's Public
Document
Room. If this report contains
any information that you (or
your contractor) believe to be proprietary, it is necessary
that you
make
a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include
a full statement of the reasons
on the basis of which it is
claimed that the information is proprietary,
and should be prepared
so
that proprietary information identified in the application is contained
in a separate
part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document
Room.
V90V000ig6
Florida Power and
Light Company
-2-
MAY 1
1979
Should you have any questions
concerning this letter,
we will be glad to
discuss
them with you.
Sincerely,
g.C.
R.
C.
ewis, Acting Chief
Reactor Operations
and
Nuclear Support Branch
Enclosure:
Inspection Report No. 50-335/79-10
cc w/enclosure:
C.
M. Wethy, Plant Manager
Post Office Box 128
Ft. Pierce, Florida
33450
Nat Weems, Assistant
gA Manager
Post Office Box 128
Ft. Pierce, Florida
33450