Forwards IE Insp Rept 50-389/79-05 on 790327-29.No Noncompliance Noted
ML17206A856
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/12/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17206A858 List:
References
NUDOCS 7906200362
Download: ML17206A856 (2)


See also: IR 05000389/1979005

Text

~8 REO0+

P0~i

ClO

0

0

+rp

o~

+a*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

APR

1 2. t979

In Reply Refer To:

RII:LM

50-389/79-5

Florida Power

and Light Company

R. E. Uhrig, Vice President

Advanced

Systems

and Technology

P. 0.

Box 529100

Miami, FL

33152

Gentlemen:

This refers to the inspection

conducted

by L. Modenos of this office on

March 27-29,

1979, of activities authorized

by NRC Construction Permit No.

CPPR-144 for the St. Lucie Unit 2 facility, and to the discussion

of our

findings held with B. J.

Escue at the conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted

of

selective

examinations

of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room.

If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include

a full statement

of the reasons

on the

basis of which it is claimed that the information is proprietary,

and should

be prepared

so that proprietary information identified in the application is

contained in a separate

part of the document.

If we do not hear from you in

this regard within the specified period,

the report will be placed'in t'e

Public Document

Room.

Florida Power and Light Company

-2-

O'R

1 2 )S79

Should you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

(p

> Charles

E. Murphy, Chief

Reactor Construction

and Engineering

Support Branch

Enclosure:

Inspection Report No. 50-389/79-5

cc w/encl:

C.

M. Wethy, Plant Manager

P. 0.

Bog 128

Ft. Pierce,

FL

33450

Nat Weems, Assistant

gA Manager

P. 0.

Box 128

Ft. Pierce,

FL

33450