ML17206A856
| ML17206A856 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 04/12/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17206A858 | List: |
| References | |
| NUDOCS 7906200362 | |
| Download: ML17206A856 (2) | |
See also: IR 05000389/1979005
Text
~8 REO0+
ClO
0
0
+rp
o~
+a*++
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30303
APR
1 2. t979
In Reply Refer To:
RII:LM
50-389/79-5
Florida Power
and Light Company
R. E. Uhrig, Vice President
Advanced
Systems
and Technology
P. 0.
Box 529100
Miami, FL
33152
Gentlemen:
This refers to the inspection
conducted
by L. Modenos of this office on
March 27-29,
1979, of activities authorized
by NRC Construction Permit No.
CPPR-144 for the St. Lucie Unit 2 facility, and to the discussion
of our
findings held with B. J.
Escue at the conclusion of the inspection.
Areas
examined during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted
of
selective
examinations
of procedures
and representative
records,
interviews
with personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were disclosed.
In accordance
with Section 2.790 of the NRC's "Rules of Practice",
Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document
Room.
If this
report contains
any information that you (or your contractor) believe to be
proprietary, it is necessary
that you make
a written application within
20 days to this office to withhold such information from public disclosure.
Any such application must include
a full statement
of the reasons
on the
basis of which it is claimed that the information is proprietary,
and should
be prepared
so that proprietary information identified in the application is
contained in a separate
part of the document.
If we do not hear from you in
this regard within the specified period,
the report will be placed'in t'e
Public Document
Room.
Florida Power and Light Company
-2-
O'R
1 2 )S79
Should you have
any questions
concerning this letter,
we will be glad to
discuss
them with you.
Sincerely,
(p
> Charles
E. Murphy, Chief
Reactor Construction
and Engineering
Support Branch
Enclosure:
Inspection Report No. 50-389/79-5
cc w/encl:
C.
M. Wethy, Plant Manager
P. 0.
Bog 128
Ft. Pierce,
FL
33450
Nat Weems, Assistant
gA Manager
P. 0.
Box 128
Ft. Pierce,
FL
33450